Laserfiche WebLink
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. R5-2010-0123 <br /> FOR <br /> H.M. HOLLOWAY, INC. <br /> FOR <br /> H.M. HOLLOWAY SURFACE MINE LANDFILL PROJECT <br /> KERN COUNTY <br /> The Discharger shall comply with this Monitoring and Reporting Program (MRP), with <br /> Title 27, California Code of Regulations, Section 20005, et seq. (hereafter Title 27), and with <br /> the Standard Provisions and Reporting Requirements for Waste Discharge Requirements for <br /> Nonhazardous Solid Waste Discharges Regulated by Title 27 and/or Subtitle D (27 CCR <br /> §20005 et seq. and 40 CFR 258), dated April 2000, as ordered by Waste Discharge <br /> Requirements Order No. R5-2010-0123. <br /> A. REQUIRED MONITORING REPORTS <br /> 1. Groundwater Monitoring (Section D.1) <br /> 2. Unsaturated Zone Monitoring (Section D.2) <br /> 3. Leachate Monitoring (Section D.3) <br /> 4. Facility Monitoring (Section DA) <br /> 5. Annual Monitoring Summary Report (Section E.S.) <br /> 6. Response to a Release (Standard Provisions and Reporting Requirements) <br /> B. REPORTING <br /> H.M. Holloway, Inc. (hereafter Discharger), shall report monitoring data and <br /> information as required in this MRP and as required in Order R5-2010-0123 and the <br /> Standard Provisions and Reporting Requirements. Reports which do not comply with <br /> the required format will be REJECTED and the Discharger shall be deemed to be in <br /> noncompliance with the waste discharge requirements. In reporting the monitoring <br /> data required by this program, the Discharger shall arrange the data in tabular form so <br /> that the date, the constituents, the concentrations, and the units are readily <br /> discernible. The data shall be summarized in such a manner so as to illustrate clearly <br /> the compliance with waste discharge requirements or the lack thereof. Data shall also <br /> be submitted in a digital format acceptable to the Executive Officer. Each monitoring <br /> report shall include a compliance evaluation summary as specified in E. Reporting <br /> Requirements, below. <br />