Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications,-assoriginals will be 'retained by EHD) <br /> 1 , Site map enclosed? YESD N0 M <br /> Z Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the "Site Health and Safety <br /> Plan " is available on the Jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be, repaired or ,replaced and attach 16 diagram drawn <br /> to scale showing Iodation of repairs . and/or replacements . If repairing a component, describe how this will . be done , (if <br /> addinc piping, .UDC's, or other LIST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> replace drop tube with overfill prevention device on all tanks (3 ) <br /> replace 3 .5 gallon fill buckets with 5 .0 gallon buckets <br /> no excavation required <br /> i <br /> 4 . List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> I Franklin Fueling Defender Series fill buckets <br /> Phil-tite 85100 series fill buckets (5 gallons) <br /> i <br />`s <br /> 2 <br /> i <br />