My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
20177
>
2800 - Aboveground Petroleum Storage Program
>
PR0545958
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 12:20:54 PM
Creation date
9/23/2020 9:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545958
PE
2832
FACILITY_ID
FA0009323
FACILITY_NAME
RALPH HAYES & SON INC
STREET_NUMBER
20177
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95304
APN
21305013
CURRENT_STATUS
01
SITE_LOCATION
20177 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC Plan:Ralph Hayes&Son,Inc., 20177 S.McArthur Dr., Tracy, CaliPomia(October 2020) i7 <br /> drainage log is provided in Appendix G and drainage of any accumulated precipitation is <br /> required to be documented. The log shall be maintained on site as part of the SPCC Plan that <br /> records the date of visual inspection, findings and date of discharge.The following procedures <br /> are utilized once accumulation of rain water occurs. <br /> e Any accumulated precipitation within the secondary containment system will be <br /> inspected for sheen. <br /> • If a sheen is not observed, the accumulated material may be pumped from the <br /> containment structure onto the ground. <br /> • If a sheen is observed,the accumulated material shall be pumped from the containment <br /> structure into 55-gallon drums or removed by a sub-contracted waste disposal <br /> contractor. The removed material shall be disposed in accordance with local, state,and <br /> federal regulations <br /> 14.2.4 Corrosion Protection (40 CFR 112.8(c)(4)) <br /> This section is not applicable since there are no partially buried or bunkered storage tanks at <br /> this facility and there is no buried piping at this facility. <br /> 14.2.5 Partially Buried or Bunkered Storage Tanks (40 CFR 112.8(c)(5)) <br /> This section is not applicable since there are no partially buried or bunkered storage tanks at <br /> this facility. <br /> 14.2.6 Inspections and Tests (40 CFR 112.8(c)(6)) <br /> Visual inspections of ASTs by facility personnel are performed according to the procedure <br /> described in this SPCC Plan. Leaks from tank seams, gaskets, rivets, and bolts are promptly <br /> corrected. Additionally, visual inspections are performed on piping, valves, appurtenances, <br /> foundations, and supports to assess the equipment's fitness for continued service. The records <br /> of the results of testing are maintained at the facility and are available for review upon request. <br /> Table 6 indicates the inspection and testing schedule for the bulk containers located at the RHS <br /> facility. <br /> McGinley Project.,RHS001 McGinley&Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.