My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
20177
>
2800 - Aboveground Petroleum Storage Program
>
PR0545958
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 12:20:54 PM
Creation date
9/23/2020 9:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545958
PE
2832
FACILITY_ID
FA0009323
FACILITY_NAME
RALPH HAYES & SON INC
STREET_NUMBER
20177
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95304
APN
21305013
CURRENT_STATUS
01
SITE_LOCATION
20177 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> SPCC Plan:Ralph Hayes&Son,Inc., 20177 S.McArthur Dr., Tracy, Califomia(October 2020) 19 <br /> RHS has elected to do the following to satisfy the Overfill Prevention Requirements: <br /> I. Tanks are gauged by RHS personnel or fueling sub-contractor using the stick method in <br /> order to check product level before a delivery occurs. Tanis gauge accuracy is verified and <br /> calibrated,if necessary,by RHS personnel annually. <br /> 2. Direct audible signal communication between the container gauger and the transfer pump <br /> is used during filling operations. <br /> 3. Facility personnel are present throughout the filling operations. <br /> 14.2.9 Effluent Treatment Facilities (40 CFR 112.8(c)(9)) <br /> No effluent treatment facilities are utilized at the RHS facility. <br /> 14.2.10 Visible Discharges (40 CFR 112.8(c)(10)) <br /> Visible oil leaks from sources such as tank seams, gaskets, rivets, and bolts sufficiently large <br /> to cause oil accumulations will be removed upon discovery in accordance with the SPCC <br /> regulations. <br /> 14.2.11 Mobile and Portable Containers (55-gallon drums) <br /> Mobile and portable containers with the potential to contain oil are stored in the Bulk <br /> Containment structure.Additional drums containing non-oil fluids(e.g.,new and used coolant) <br /> are located in the warehouse and beneath the covered storage area next to the warehouse.These <br /> drums are not included in this SPCC Plan because they are not oil fluids. <br /> 15, TRANSFER OPERATIONS, PUMPING, AND IN-PLANT <br /> PROCESSES (40 CFR 112.8(d)) <br /> Transfer operations at this facility include: <br /> • The transfer of oil from tanker trucks to bulk tanks. <br /> • The transfer of oil from bulk tanks to dispenser systems. <br /> • The transfer of oil from bulk tanks to equipment. <br /> The RHS Facility has specific product receiving procedures in place. These delivery <br /> procedures are provided in Appendix H. <br /> McGinley Project;RHS001 McGinley&Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.