My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
20177
>
2800 - Aboveground Petroleum Storage Program
>
PR0545958
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2020 12:20:54 PM
Creation date
9/23/2020 9:49:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0545958
PE
2832
FACILITY_ID
FA0009323
FACILITY_NAME
RALPH HAYES & SON INC
STREET_NUMBER
20177
Direction
S
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95304
APN
21305013
CURRENT_STATUS
01
SITE_LOCATION
20177 S MACARTHUR DR
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Is the primary tank free of water or has another preventative measure been taken? <br /> 4 NOTE: Refer to paragraphs 6.10 and 6.11 of the standard for alternatives for Category 1 ❑Yes ❑ No ❑ N/A <br /> tanks.NIA is only appropriate for these alternatives. <br /> 5 For double-wall or double bottom tanks or CE-ASTs, is interstitial monitoring equipment <br /> (where applicable)in good working condition? ❑Yes ❑ No u N/A <br /> 6 For double-wall tanks or double bottom tanks or CE-ASTs,is interstice free of liquid? <br /> Remove the liquid if it is found.If tank product is found,investigate possible leak. ❑Yes ❑ NO ❑ N/A <br /> Equipment on tank <br /> 7 If overfill equipment has a"test'button,does it activate the audible horn or light <br /> to confirm operation?If battery operated,replace battery if needed. ❑Yes ❑ NO ❑ N/A <br /> 8 Is overfill prevention equipment in good working condition?If it is equipped with a <br /> mechanical test mechanism,actuate the mechanism to confirm operation. ❑Yes ❑ No n N/A <br /> 9 Is the spill container(spill bucket)empty,free of visible leaks and in good working <br /> condition? ❑Yes ❑ No ❑ NIA <br /> 1a Are piping connections to the tank(valves,fittings,pumps,etc.)free of visible leaks? <br /> Note.If"No", identify location and describe leak. ❑Yes o No <br /> =Doderslplatforms/walkways appear to be secure with no sign of severe corrosione? n Yes ❑ No ❑ NIA <br /> Containment(Dikinglimpounding) <br /> 12 Is the containment free of excess liquid,debris,cracks,corrosion,erosion,fire hazards and <br /> other integrity issues? o Yes ❑ No ❑ N/A <br /> 13 Are dike drain valves closed and in good working condition? ❑Yes Cil No ❑ N/A <br /> 14 Are containment egress pathways clear and any gates/doors operable? ❑Yes ❑ No ❑ N/A <br /> Concrete Exterior AST(CE-AST) <br /> 15 Inspect all sides for cracks in concrete_ Are there any cracks in the concrete exterior larger <br /> than 1/16"? ❑Yes n No ❑ NIA <br /> 16 Inspect concrete exterior body of the tank for cleanliness,need of coating,or rusting where <br /> applicable. Tank exterior in acceptable condition? ❑Yes ❑ No ❑ N/A <br /> Visual inspect all tank top openings including nipples,manways,tank top overfill containers, <br /> 17 and leak detection tubes. Is the sealant between all tank top openings and concrete intact ❑Yes ❑ No ❑ NIA <br /> and in good condition? <br /> Other Conditions <br /> 1I3--[Is the system free of any other conditions that need to be addressed for <br /> continued safe operation? ❑Ye5 ❑ No <br /> Monthly Checklist Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.