Laserfiche WebLink
SWRCB, January 2002 Page 10 of 13 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By : ❑ Piping Manufacturer X Industry Standard ❑ Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : J Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used : Analog Pressure Gauge Equipment Resolution : +/-0 . 25 <br /> Piping Run # T- 1 -T-4 Piping Run # T-2-T4 Piping Run # T4 87 Piping Run # T-5 91 <br /> Piping Material : Fiberglass Fiberglass Poly Poly <br /> Piping Manufacturer: Ameron Ameron TCI TCI <br /> Piping Diameter: 2" 2" 1A /2 " <br /> Length of Piping Run : 75' 50' 350 ' 350 ' <br /> Product Stored: Gas Gas Gas Gas <br /> Method and location of Tank- 1 Thru Tank-4 Tank-2 To Tank-4 Tank-4 To Auto Tank-5 To Auto <br /> i in -run isolation : <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MINUTES 15 MINUTES 15 MINUTES 15 MINUTES <br /> starting test : <br /> Test Start Time : 1 : 00pm 1 : 00pm 1 : 00pm 1 : 00pm <br /> Initial Reading (R,) : 5 . 00 Psi 5 . 00 Psi 5 . 00 Psi 5 . 00 Psi <br /> Test End Time : 2 : 00pm 2 : 00pm 2 : 00pm 2 : 00pm <br /> Final Reading (RF) : 5 . 00 Psi 5 . 00 Psi 5 . 00 Psi 5 . 00 Psi <br /> Test Duration : 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading (RF-RI) : 0 . 00 Psi 0 . 00 Psi 0 . 00 Psi 0 . 00 Psi <br /> Pass/Fail Threshold or <br /> Criteria: 0 . 00 Psi 0 . 00 Psi 0 . 00 Psi 0 . 00 Psi <br /> Test Result: ® Pass ❑ Fail 11 Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and i4econimended follotiv-up for failed tests) <br />