My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2360
>
2300 - Underground Storage Tank Program
>
PR0507204
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2024 12:37:42 PM
Creation date
9/23/2020 12:57:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0507204
PE
2361
FACILITY_ID
FA0007735
FACILITY_NAME
7-ELEVEN INC #32262
STREET_NUMBER
2360
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
23819001
CURRENT_STATUS
01
SITE_LOCATION
2360 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Page 4 of 6) <br /> Vlll . MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring . Y N NA <br /> Are the visual and audible alarms operational ? r r r <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats r r <br /> move freely, functionally tested , and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not �- <br /> interfere with their proper operation ? <br /> Was monitoring system set-up reviewed to ensure proper settings? r' r r <br /> Was the monitoring panel's backup battery visually inspected , functionally tested , and confirmed operational? r r r <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? r r <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or isr r <br /> electrically disconnected ? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? r r r <br /> Which sensors initiate positive shut down? Check all that apply .) r Sum r; Under4s enser containment <br /> If alarms are relayed to a remote monitoring station , is all communications equipment (e . g . modem) operational ? r r <br /> For any answer of "N " above, describe in section IX how and when these deficiencies were or will be corrected. <br /> We COMMENTS <br /> Use this section to provide any additional comments about the inventory of the equipment certified. <br /> 87 stp sump the sump sensor was not at lowest point moved and repositioned it to proper level , took pics <br /> X IN -TANK GAUGING TESTING <br /> W, Check this box if tank gauging is used only for inventory control . (Do not complete this section .) <br /> r Check this box if NO tank gauging equipment is installed . (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination , including r r r <br /> testing for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, r r r <br /> functionally tested , and confirmed operational? <br /> Was accuracy of system's product level readings tested ? <br /> Was accuracy of system's water level readings tested ? r r r <br /> Were all probes reinstalled properly? r r r <br /> Were all items on the equipment manufacturer's maintenance checklist completed ? r r r <br /> For an answer of "N " above, describe in section XI how and when these deficiencies were or will be corrected. <br /> XI . COMMENTS <br /> Use this is <br /> section to provide any additional comments about the inventory of the equipment certified. <br /> Y = Yes , N = No , NA = Not Applicable <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.