Laserfiche WebLink
MONITORING SYSTEM CERTIFICATION <br /> CERTIFICATION / TEST DATE : September 17 , 2018 <br /> 41 . FACILITY A2 . OWNER <br /> Name Teichert Mobile Equipment Name Teichert Construction <br /> Address 120 Frank Circle , Stockton , CA 95206 Address P.O. Box 15002, Sacramento, CA 95851 <br /> Phone # 916-366-8631 Phone # 916486-3767 <br /> Contact Steve Schamaun Contact Steve Schamaun <br /> F . INJANK GAUGING / SIR EQUIPMENT: Check this box if tank gauging Is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment Is installed. <br /> This section must be completed if in-tank gaugung equipment is used to perform leak detection monitoring . <br /> Complete the following checklist: <br /> Yes ❑ No * Has all input wiring been inspected for proper entry and termination, including testing for ground faults ? <br /> Yes ❑ No * Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ❑ No * Was accuracy of system product level re <br /> Y P adings tested .? <br /> Yes i ❑ No * Was accuracy of system water level readings tested? <br /> Yes ❑ No * Were all probes reinstalled properly? <br /> Yes ❑ No * Were all items on the equipment manufacturer's maintenance checklistcompleled? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected. <br /> G . LINE LEAK DETECTORS ( LLD) : ❑ Check this box if LLDs are not Installed. <br /> Complete the following checklist: <br /> 70 Yes p No * For equipment start-up or annual equipment certification , was a leak simulated to veri <br /> ❑ fY LLD performance? <br /> ance . <br /> N/A <br /> (check all that apply) Simulated leak rate: 3 g . p h. ; ❑ 0. 1 g. p. h . ; El 0.2 g. p. h. <br /> - -- _ _ <br /> Yes —❑ No * Were all LLDs confirmed operational and accurate within regulatory requirements ? <br /> 11 — ----- <br /> Yes ❑ No I— -- — --� -----testingapparatus properly calibrated ? <br /> ❑ Yes i ❑ No * i For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> N/A <br /> Yesfi ---*--{----- -- ---- --- ----- --- ------ ------ --- --- <br /> ❑ No For electronic LLDs , does the turbine automatically shut off if the LLD detects a leak ? <br /> El N/A <br /> Yes E3 or No * For electronic LLDs, does the turbine au <br /> tomaticali shut off if <br /> Y any portion of the monitoring system is disabled <br /> ❑ N/A or disconnected? <br /> Yes r ❑ No * For electronic LLDs, does the turbine automatically shut off if any portion of the monitoringsystem malfunctions <br /> --_fi El N/A or fails a test? Y <br /> Yes ❑ No * For electronic LLDs, have alI accessible wiring connections been visually inspected? <br /> — -- ❑ N/A_ <br /> 1111 <br /> Yes ❑ No * Were all items on the equipment manufacturer's maintenance checklist completed ? <br /> * In Section H below, describe how and when these deficiencies were or will be corrected . <br /> H . COMMENTS <br /> © 2018 Walton Engineering, Inc, <br /> Page 3 of 3 <br />