My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1996-2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
12001
>
4400 - Solid Waste Program
>
PR0507825
>
CORRESPONDENCE_1996-2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 3:13:56 PM
Creation date
9/23/2020 2:07:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1996-2026
RECORD_ID
PR0507825
PE
4442 - SW COMPOST SITE - QUARTERLY INSPECTION
FACILITY_ID
FA0003867
FACILITY_NAME
DELICATO VINEYARDS LLC
STREET_NUMBER
12001
Direction
S
STREET_NAME
STATE ROUTE 99
City
MANTECA
Zip
95336
APN
20405008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
12001 S STATE ROUTE 99 MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM R5-2013-0028 <br /> FOR <br /> DELICATO VINEYARDS, INC. <br /> DELICATO FAMILY VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> This Monitoring and Reporting Program (MRP) incorporates requirements for monitoring of <br /> winery wastewater, wastewater ponds, land application areas, solids, and groundwater. This <br /> MRP is issued pursuant to Water Code Section 13267. The Discharger shall not implement any <br /> changes to this MRP unless and until a revised MRP is issued by the Executive Officer. <br /> All wastewater samples shall be representative of the volume and nature of the discharge. The <br /> time, date, and location of each grab sample shall be recorded on the sample chain of custody <br /> form. Winery wastewater flow monitoring shall be conducted continuously using a flow meter <br /> and shall be reported in cumulative gallons per day. <br /> Field test instruments (such as pH and dissolved oxygen) may be used provided that: <br /> 1. The operator is trained in the proper use of the instrument; <br /> 2. The instruments are field calibrated prior to each use; <br /> 3. Instruments are serviced and/or calibrated by the manufacturer at the recommended <br /> frequency; and <br /> 4. Field calibration reports are submitted as described in the "Reporting" section of this <br /> MRP. <br /> FLOW MONITORING <br /> Effective immediately, winery wastewater/storm water and supplemental irrigation water flow <br /> rates to the existing land application areas shall be monitored as follows: <br /> Constituents Units Type of Sampling Reporting <br /> Sample Frequency Frequency <br /> Flow from Solids Separation Gallons Meter Reading Daily Monthly <br /> System to each LAA <br /> Flow from Irrigation Supply Well Gallons Meter Reading Daily Monthly <br /> to each LAA <br /> Flow from SSJID to each LAA Gallons Meter Reading Daily Monthly <br />
The URL can be used to link to this page
Your browser does not support the video tag.