Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER R5-2013-0028 -4- <br /> DELICATO VINEYARDS, INC. <br /> DELICATO FAMILY VINEYARDS <br /> SAN JOAQUIN COUNTY <br /> Constituent Units Type of Sampling Reporting <br /> Sample Frequency Frequency <br /> Local Rainfall Inches Measurement Daily Monthly <br /> Wastewater Applied Gallons per day Measurement Continuous Monthly <br /> Supplemental Irrigation Water2 <br /> Irrigation Well Gallons per day Measurement Continuous Monthly <br /> SSJID Gallons per day Measurement Continuous Monthly <br /> Total Water Application Rate 3 gal/ac/day Calculated Daily Monthly <br /> Total Acreage Applied 4 Acres Calculated Daily Monthly <br /> BOD Loading Rate 5 Ib/ac/dayCalculated Daily Monthly <br /> Nitrogen Loading Rate 6 Ib/ac/mo. 7 Calculated Monthly Monthly <br /> LAA Soil Condition 8 NA Inspection Monthly Monthly <br /> Rainfall may be monitored on-site or reported from a nearby rain gauge station. <br /> 2 When applied. <br /> 3 Application rate monitored from all sources. <br /> 4 Land Application Area(s) in use shall be identified by name or number and the acreage provided. <br /> If only a portion of an area is used, then the application acreage shall be estimated. <br /> 5 Calculate the daily application rates, based on the most recent BOD effluent results. <br /> s Total nitrogen applied from all sources, including fertilizers, compost, and supplemental irrigation <br /> water if used. <br /> Report monthly total and cumulative annual to date. <br /> 8 LAA soil saturation condition (saturated or not saturated) shall be determined prior to wastewater <br /> application. <br /> At least once per week when wastewater is being applied to the land application areas, the <br /> entire application area shall be inspected to identify any equipment malfunction or other <br /> circumstance that might allow irrigation runoff to leave the area and/or create ponding conditions <br /> that violate the Waste Discharge Requirements. A log of these inspections shall be kept at the <br /> facility and be submitted with the monthly monitoring reports. If wastewater was not applied to <br /> the land application area, then the monthly monitoring reports shall so state. <br /> SOLIDS MONITORING <br /> The Discharger shall monitor the solids generated and disposed of on a monthly basis. The <br /> following shall be monitored and reported: <br /> 1. Amount of solids generated. Solids may include pomace, seeds, stems, diatomaceous <br /> earth, screenings, and sump/clarifier solids, or other material. <br /> 2. Storage for all solids waste streams. Describe the location of storage and measures <br /> implemented to prevent leachate generation or control and disposal of any leachate that is <br /> generated. <br /> 3. Volume and thickness of all solids applied to each land application area. <br /> 4. Volume disposed of off-site. Describe the disposal method (e.g. animal feed, land <br /> application, off-site composting, landfill, etc.), the amount disposed (tons), and the name <br /> of the hauling company. <br />