GENERAL NOTES REVISIONS <br /> 1 CERTAIN EQUIPMENT REQUIREMENTS NOTED ON THESE DRAWINGS NO. DESCRIPTION DATE <br /> ARE DERIVED FROM OWNER-FURNISHED COORDINATION DRAWINGS. <br /> CONTRACTOR TO VERIFY ACTUAL OWNER-FURNISHED EQUIPMENT <br /> CONNECTION REQUIREMENTS AND SCOPE OF WORK. CONTRACTOR TO <br /> PROVIDE INSTALLATION OF ALL OWNER SUPPLIED PLUMBING <br /> FIXTURES. <br /> 8.1 <br /> CS <br /> 2 CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING SANITARY, <br /> r (E)6"SS To 1 DOMESTIC, AND GAS LINES AND VERIFY AVAILABLE INVERT DEPTHS <br /> E 10"SD ToO PRIOR TO BEGINNING WORK. <br /> EXISTING M -------<-(E)SLOPE- ( ) <br /> --- -(E)4'SS - - 0 0 o EXISTING MAIN <br /> - ❑ o __ _ __ 1 _ _ _ _ _ -_ 3 CONTRACTOR TO VERIFY INVERTS OF MANHOLES AND DOCUMENT <br /> T <br /> j (E) w ( 7— <br /> ) FIRE F l r WHETHER BACKCHECK VALVE IS REQUIRED. <br /> I 1 � . I <br /> GENERATOR S R I 4 THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL <br /> coo R M R O o I' j I LABOR AND MATERIALS, AND EQUIPMENT NECESSARY, OR <br /> cn.. 130 I I REASONABLY INFERABLE AS BEING, FOR FURNISHING, INSTALLATION <br /> 0 <br /> 1 2 w ° TESTING, COMPLETE AND READY FOR SAFE OPERATION OF THE <br /> - SYSTMS DESCRIBED HEREIN. <br /> 1 I I BP -i- <br /> N _ (E)4 GCO (E)HUB 1 (E)2°VTR ) (E) F°7 I 5 COORDINATE LOCATION OF VENTS THROUGH ROOF TO MAINTAIN 10'-0" <br /> DRAIN RE:P2 OR RECEIVING 2 I CLEARANCE FROM OUTSIDE AIR INTAKES. EACH VENT EXTENSION <br /> M.9 CD ------�,---------------- 6 THROUGH A ROOF SHALL BE AT LEAST 3" IN DIAMETER&TERMINATE <br /> ROOM I�, <br /> „ s 12 <br /> 8 <br /> AREA (TYP.) <br /> I I E 2 VTR ,- ,.S � (E)2,000 GALLON GREASE ❑ � NOT LESS THAN 12 ABOVE THE ROOF OR AS REQUIRED BY THE <br /> 12 <br /> Q <br /> INTER EPT R E © L <br /> C O ----------------------------- - ------- ---- -------------------- PROJECT NO. <br /> y w/ ( ) I ADMINISTRATIVE AUTHORITY ARCH <br /> 1 <br /> R OM 1 6 SITE UTILITIES: THE MECHANICAL DOCUMENTS INDICATE CONNECTON 2004 <br /> _ E ; I <br /> (E)2"VTR r I &LOCATION OF VARIOUS BUILDING SERVICES. COORDINATE WORK <br /> J DRAWN <br /> o <br /> O I <br /> < \ 6 (TYP.) I I w - - - 129 I WITH THE SITE UTILITIES CONTRACTOR TO ENSURE PROPER INVERT <br /> ROOF 12 G' O I ❑ I ELEVATION, PIPE SLOPE, GRADIENT, PIPE SIZE AND SEPARATION JMC <br /> ------ I MOUNTED (E)4 GCO T L w WITHIN TRENCH WORK. NOTIFY ARCHITECT/ENGINEER OF ANY D <br /> \� o II ° <br /> - o O iI <br /> - E sLOPE� - ----- - - - ° 3°wco J I DISCREPANCY BETWEEN DRAWINGS AND FIELD CONDITIONS. I%-vv a <br /> SUBMITTAL DATES <br /> PRODUCE \ I (E)4 GW- t �\ i 1 --------i ws w 3S (TYP.of 2> I 7 CONTRACTORS SHALL IDENTIFY ALL SERVICEABLE ITEMS, (CLEANOUT <br /> — - - - - - - - - - —I 11 II <br /> (E)2°VTR u 1 . I C.) S <br /> RECEIVING — — — — — — — — — w 3"S _ <br /> - COILS, ET O THAT THE CEILING SUBCONTRACTOR MAY KNOW <br /> ( 142 3 I 2 4 4.2' 51� 6 1 S 3"VTR I 10 11 - 06/11/20 <br /> WHERE TO INSTALL ACCESS TYPE PANELS SHOULD A LIFT UP TYPE <br /> CEILING NOT BE INSTALLED. THIS CONTRACTOR SHALL PROVIDE <br /> I ' 51 <br /> FOOD -- -(E)4"GW- <br /> 3 (E>1 o sD To 1_ I - - - - - - - - ACCESS PANELS FOR HIS WORK UNLESS SPECIFICALLY NOTED ON THE <br /> I EXISTING MAIN ' <br /> 143 3/4" �I �� i � w ° I - <br /> ❑ ------ --- -------- <br /> - - <br /> M CD- - - - - - - - I EXIST I,; _ -_ - - - - - - M DRAWINGS. <br /> I <br /> �❑ � I � - - - T711(E)ROOF MOUNTED 2"vCD PIPING(TYP.) CD ° L ACCOMODATE WORK OF THIS SECTION, MUST BE SEALED TO MAINTAIN <br /> L J ( )3/4°CD b-b -"' (EELOO FLOOR 19 20 :P3 THE RATING OF SUCH ASSEMBLY BY A U.L. RECOGNIZED SEALING <br /> a -,/ wwTYP. - - - - - - - - - a (E)2 VTR- - - - - - - - - - - - - - - - - -- - �q - - - - - - - -- METHOD. <br /> - -- T 1 - 006 <br /> 2 (E) �� C I = = (E) 9 SLOPE ALL SEWERS BELOW GRADE AS SHOWN ON THIS SET OF PLANS. x <br /> c �4,� �'� I PRE-CUT <br /> W4 1 � I w ° 20 I F (E)2"V to E DAIRY GROCERY 3 I ALL OTHER PIPING INSIDE BUILDING OR ABOVE GRADE SHALL BE "° <br /> O UCE . W FS ..~ w� I -- w (E) AT I �Q, cn ° (E)3 VTR w w ( ) z-o <br /> I I MEAT (E)4"GW(CWV) .. RE:P3 z <br /> / O 17 BLOOM COOLER FREEZER FS SLOPED PER THE REQUIREMENTS OF THE PLUMBING CODE AND <br /> I 3 ° ° I OOM / I k- BLOOM <br /> - ��ti W U � 6 oa ��oyo <br /> 00 ER (E)� q I E I E ME T I ,� 121 120 1 O AMENDMENTS ADOPTED BY THE LOCAL AHJ. COORDINATE PIPING o F o <br /> 3 I v I ( )ROOF RTU-5 11 _ ( ) BOX <br /> _ ° 2 I BELOW GRADE OUTSIDE BUILDING WITH SITE DRAWINGS. w .,° y W <br /> 1 I 4 2"VTR = I I MOUNTED ROOF PS 140 u" - PREP/W P 1 I w a W U >, a o <br /> I 1 3 m l I CD PIPING MOUNTED (E) `i' 133 o x o. � a <br /> WH ° c7 �' ROO (L') 10 FLOOR SINKS BELOW REFRIGERATED CASE TO BE HALF-EXPOSED. o a a Q w <br /> I cn TYP. w o 0 <br /> 48"LONG TD I � w 1 (TYP.) S RVI w � 134 / I � GROCERY � ( ) I <br /> 1 . 7 F7 <br /> 0 // 1 I COORDINATE LOCATION WITH REFRIGERATION CONTRACTOR RE: R1. <br /> 1 ua (E)3"VTR S AFOOD / i TRANSFER 1 - ° w x z ca <br /> 2"VBF J-. .1-. I / I I~ (N)JUICE I o °°° w <br /> WH ° -3"GW- � II (E)4"GWS/ / w I 11 INDIVIDUAL VERTICAL VENT SIZES ARE NOT SHOWN ON PLAN FOR v w a A z Z o <br /> I TYP.OF2 137 -- , I i 125 1a COOLER - - - - - - - - -f- - - - - - - - - - - - - - - - - www wAo° - N <br /> K.3 - - -1 - ° I ( ) - - _ _ I --- -- ' o 122 1 (TYP.) ' - - - - - - FIXTURES SPECIFIED IN SCHEDULE. REFER TO PLUMBING FIXTURE <br /> " � 14 � -3"SSS I� 1 - - -� ❑ � 1 � I E 2" tI w ❑ I 6 96'-7" R I I FS 97'-10" R 1 � 98'-0" R O SCHEDULE FOR SIZES. �w �w�a° � w <br /> ° N I I ( > 3 W W 12 ALL INDIRECT WASTE PIPING FROM ALL DEPARTMENT SINKS SHALL BE 6 o w � '� v � o <br /> d 4 <br /> -1)3/4" D v� I FS _ _ O _ _ _ SCHEDULE 40 PVC. ., <br /> E 2"VTR I 1 II I I / ❑ E SLOPE 1/8"/FT. F ° w W a O d a <br /> 1 ( ) 24 I I I I W I VTR 1 I 1 (E)4"FCO <br /> o 1 15 4 I I C , I I I -- - --------- - ---�- (E)4"CWV H o ° <br /> � W <br /> (E)4"CWV vgFT 3 13 PLUMBING CONTRACTOR SHALL HIRE A SURVEYOR TO PLOT POINTS A a a°z a �� <br /> - (E)4 � -- - ----------- -- - --- I 1 `�' 1 3 O AL 00 S 00 S C RAINS O w o <br /> -GW- --- (E)4..GW \ > (E)3 VTR til <br /> EXPANSION -(E)4"SS - - -- -- - --- -- - (E)4"SS�- -- - I I - - - - - - - - _ - - - - - FOR ALL R INKS, FLOOR DRAIN AND TRENCH D T o o <br /> 2 V �(E)SLOPE 1/8'7FT.� I \� (E)3"VTR Ii (E)2"VTR / ( r cn cn cn FS <br /> TANK RE:P2 <br /> 2"VBF -4'GW== 4' GW f - CONFIRM FINISH ° ° ° <br /> E � ������� I .. I .. .. , � 1 ACCURATELY LOCATE DRAINS AND SINKS AND TO C <br /> O - - - - - - - - - / - __(E)3' VBF_ - -- - - - I - K HEIGHTS OF THE TOP OF ALL SURFACES, RE: Al.l-6. <br /> 3 VTR 3"VBF ��� I (E) RT <br /> N 97,_3„ ------ --------- 14 SEAL BETWEEN WALLS &PLUMBING FIXTURES PER REQUIREMENTS OF <br /> I <br /> F <br /> - - - - - - - - _ _ - _ o-- -(E)4"SS--- - -�I - (E)sLOPE 1/8°/- °-/ (TYP.) // - - - - - - - ° THE HEALTH DISTRICT AND PLUMBING CODE. M O <br /> I ° ° 1 6 1 (E)3"VTR I W <br /> 3"VTR w O O FS 1 1 1 1 1 1 // (E)INVERT 1 (E)3"VT 1 15 REFER TO THE PLUMBING FIXTURE SCHEDULE FOR CW&HW SIZES TO = <br /> 1 TD FS 8 I I (E) O 5 3 O O 3 / 95'-11" Q Q 2 3 INDIVIDUAL FIXTURES. 2 o � <br /> 4 `� SERVICE (TYP.) >� > (TYP.) / o x TYP.) 16 PROVIDE FLEXIBLE CONNECTIONS AT ALL GAS FIRED APPLIANCES. - r� <br /> v l 2 = = - FS // FS o o ( FS FS FS I c <br /> 36"LONG 23 1' ^I ° DELI 3 °° 1 / 1 1 1 1 17 ROUTE PIPING OVER MAIN SALES AND OTHER AREAS WITHIN TRUSS O wco <br /> 3 <br /> CDO <br /> I w O I w�, (TYP.) 1 � I `, r ° ° °° ° ° // w w ° �/ M SPACE WHENEVER POSSIBLE. O <br /> (E)2"VTR I 1 5FS)\ 1 I �� FS o°°o °° / / w 18 CONTRACTOR SHALL BE RESPONSIBLE FOR SEISMIC RESTRAINT s Q m <br /> (E)ROOF MOUNTED I / 1 I 1 / o o _ I �� 7 <br /> CD PIPING(TYP.) I % ' ° - ° (E)INVERT m I m m cn (E)3"VTR ❑ o <br /> - ° I G� 1 (E)INVERT I �, ANCHORAGE AND BRACING REQUIREMENTS, RE: 53.4. H <br /> 97'-10" ^i V) LL- <br /> = - / 3"v - 19 RE: A1.4 A1.5 AND A1.7 FOR FLOOR SINK FLOOR DRAIN AND TRENCH w <br /> �(E)SLOPE 1/8°/FT. --- �� -- / �' (E>sLOPE 1/8"/FT. - - - "' - -- -- / _�� - DRAIN DIMENSIONS, RE: Al.1-6 FOR PLUMBING FIXTURE PREP SLAB. ' \ <br /> � I I CWV- / - - _4I -------- - --(E)4"CWV �-- - -(E)4"CW - -- - <br /> - / I /, �/ �/ - - ----- (E)4"CWV A Z r N <br /> ° _ w I 1 (E)INVERT E INVERT (E)INVERT T ��, „ E 4°FCO "VBF 20 COORDINATE PIPING WITH ALL TRADES PRIOR TO INSTALLATION TO li LLI z W cfl <br /> (E) ( ) ( ) ) ) T (E) R (E)3 <br /> - PRODUCE M w M / M / 1 96-8 97-1 97-5 - 97-8 Jp 4 13 98'-l" 98-5 1 ( > ILI <br /> ��i2"SD '� M 1 0°o I ° I� 1 I FS °°o° / (TYP.) ``' < s AVOID CONFLICTS. <br /> fl, 3 21 THE POINT OF DISCONNECTION REMAINING IN A PIPING SYSTEM AFTER <br /> W DRY o o o w (E)8"ROOF DRAIN (E)INVERT �1 W <br /> MTYTNnI 3 4.._ X12 OD.--E 4"CWV- ❑ ----- ----- �� o -- o 1 (E)4"FCO I 10"RD DROP 98'-3" 1S (TYP.) Ol c� <br /> O -_(E)4 CWV- 1 0° ° o I W Q <br /> ROOM / (E)SLOPE 1/8"/FT. o o I o -o- ❑ ❑ - + - - - - I - - - - - - - - - - - PIPING HAS BEEN REMOVED SHALL BE PERMANENTLY CAPPED AIR AND - Q <br /> 145 4 ° I ° - - - 3"Wco- I (E)8"OVERFLOW DRAIN 3"VTR ." WATER TIGHT. U) <br /> / I I 1 1 1 0 92"A.F.F. 11 13 10"OD DROP - - v\N�vVv 3"V W <br /> 6 16 0 _I _I 1 1 (TYP.) - - - �� - - - - - -3"VBF- 22 CONTRACTOR SHALL RETAIN AND PROTECT ALL EXISTING FIXTURES, d co <br /> E 2"- _ - �'' M (TYP.) M I I I ao I I <br /> 1 ( > o o O w w w 1 1 1 FS 3"wco EQUIPMENT AND ALL ASSOCIATED PIPING NOT SPECIFICALLY SHOWN <br /> / I 3 4 3"v FS TO BE REMOVED OR RELOCATED ON TFUS SET OF PLANS. ❑ <br /> O w w 1 I I I <br /> 1 I I IL <br /> (E)4"FCO - 3"VTR i - - - - - 1 9 A.F.F. W <br /> k ------ ------ M M M M M M 23 SET ALL FLOOR DRAINS TO FLUSH WITH FLOOR FINISH AS FOLLOWS: N <br /> � � - - - - - - - - - - - - - - - - - - - - - - - - - o o :_�t 21 3 - < Lo <br /> (E VTR - �- - - = - 4"CWV 4" <3 FINISH CONCRETE: TOP OF DRAIN-TOP OF FINISH CONCRETE O <br /> SLOPE 1/8 /FT. <—SLOPE 1/8"/FT. <br /> )2" I <br /> (E)3"AlF I o 00 �/ 4 CWV FS U RESINOUS FLOORING: _ <br /> j� <br /> . � 9 4 <br /> ,>. � SET TOP OF DRAIN 1/4" ABOVE TOP OF CONCRETE AS SHOWN ON SHEET <br /> (E)8"OVERFLOW I 1 (E)3"VTR q q �, <br /> ( 2 )r,RAIN o / (E)3"VTR Al. RE: SHEET A9 FOR FLOOR FINISH AND TRANSITION DETAIL. <br /> ��/�'11' FS -4"CWV---------- -----------� - 1' <br /> (E)8"ROOF FS <br /> SLOPE 1/8VFT. 1 v 24 CONTRACTOR SHALL SAWCUT EXISTING CONCRETE SLAB FLOOR AS <br /> DRAIN(T) 1 1 u 4"CWV INV. w w (E)ROOF MOUNTED = VBF REQUIRED FOR INSTALLATION OF NEW WASTE AND VENT PIPING, RE: �pFESS/ <br /> 7 <br /> ❑ 3 3 W W ELEV.=96'-7" CD PIPING(TYP.) 4 <br /> m 3"'wco 25 REMOVE ALL EXPOSED UNUSED WASTE AND VENT PIPING. P 2 <br /> 92 A.F.F. 5 <br /> 1 I I 3 FS 26 CONTRACTOR TO FIELD VERIFY ALL FIXTURES ARE FULLY CONNECTED <br /> O ❑ ❑ 17T P: 12/31/21 <br /> m G ROOF PS <br /> II <br /> 1 TO EXISTING SANITARY SEWER AND EXISTING VENT THROUGH ROOF <br /> (E)4 FCO <br /> �P <br /> MOUNTED 1 1 (E) MAINPROJECT <br /> CD PIPING DE <br /> VTR I SALES SPECIFICATIONS. 9TFOF CA <br /> /-3" <br /> II <br /> 100 <br /> 12 17 <br /> I <br /> O <br /> 06/11/20 <br /> II <br /> RTU-12 11 KEYED NOTES <br /> o00 00 0 .. L-0c,"', <br /> RooF PS 1 RETAIN AND PROTECT. RE: GENERAL NOTE 2 AND 22, THIS SHEET. <br /> M U 18 0 0 0 0 0 O rx 1 (TYP.) - - - - - - - - - - - - - - - - - - - - - I MOUNTED - - - <br /> (TYP.) RTU-9 11 I <br /> _ _ r G 2 RETAIN AND PROTECT EXISTING ROOF AND OVERFLOW DRAIN AND <br /> w ROOF PS w w 1 ALL ASSOCIATED PIPING. <br /> 1 ❑ v .. 3 CONNECT NEW FLOOR SINK OR FLOOR CLEANOUT TO EXISTING WASTE <br /> MOUNTED <br /> 3°wco O ° PIPING BELOW FLOOR AND EXTEND NEW WASTE PIPING TO NEW FLOOR <br /> 118"A.F.F. ° ° <br /> SINK OR FLOOR CLEANOUT. <br /> 3' F ° ° I 1 (E)4"FCO 2 ______i 4 FCO TO BE HEAVY DUTY IN AREAS OF WORK TRAFFIC. PROVIDE ZURN <br /> I o ° 2 I e ZN-1400-HD OR EQUAL HEAVY DUTY C.O. SIZE TO MATCH WASTE LINE O <br /> I I I I O - - (TYP.) SIZE. <br /> 1' I (TYP.) i i 11 17 <br /> F _ I - - - _ _ _ - I - - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ O 1 5 INSTALL NEW WATER HEATER AND RECONNECT TO EXISTING FLUE <br /> RTU 10 11 E ROOF MOUNTED AND FLUCT DUCT UP THROUGH ROOF. O <br /> I ROOF PS I O <br /> - MOUNTED CD PIPING(TYP.) ----I <br /> 6 RETAIN AND PROTECT ALL EXISTING FIXTURES, FLOOR DRAINS,cn <br /> w <br /> cn <br /> (E)1 1/4"CD (E)1 1/4"CD TRENCH DRAINS, FLOOR SINKS, CLEANOUTS, VENT THROUGH ROOFS <br /> w w I I AND ALL ASSOCIATED WASTE AND VENT PIPING ABOVE AND BELOW <br /> GRADE, THIS AREA, UNLESS OTHERWISE NOTED, RE: GENERAL NOTE 6, <br /> I I I I I I I I I <br /> � O <br /> 1 0 THIS SHEET. O <br /> �–T--I <br /> = = � 7 INVERT ELEVATION BASED ON 100'-0" FINISHED FLOOR ELEVATION. <br /> 8 CONNECT 3" VBF TO EXISTING 3" VBF AND EXTEND TO NEW WALL AND ~ <br /> Fs I I I UP TO NEW VTR. M <br /> II--�--1 <br /> > D - - - - - - - - - - - - - - - - - - - - - - - - - - E 9 FLOOR CLEANOUT INVERT ELEVATION SHALL BE 18" BELOW FINISHED <br /> I <br /> r l <br /> _ (E)4"SS- -- ---- --o o -o o ----{E)4"SS----�7 FLOOR. Q v <br /> I <br /> 10 VENTS ROUTE AWAY FROM CMU WALL AS HIGH AS POSSIBLE AND O <br /> 1 PENETRATE THE ROOF A MINIMUM OF 5'-0" AWAY FROM THE PARAPET O <br /> 2 q q I (E)8"OVERFLOW (E)8"ROOF <br /> (E)8"ROOF <br /> 3 ' O o l d I I 1 I I I I ' I I WALL. <br /> U (E)8"OVERFLOW o0 0o DRAIN 1 1 (DDRAINDRAIN(a) O <br /> ❑❑❑ DRAIN w w O I q 11 CONNECT 3" VBF TO EXISTING 3" VBF AND EXTEND TO SPACE BETWEEN <br /> w ❑ ❑ O <br /> - � CASES. RISE 3" VENT TO 12" A.F.F. AND ROUTE TO 3" VENT RISER AND 3" O ►� it <br /> � � - <br /> (TYP.) I I G j (E)ROOF MOUNTED 6 12 REPLACE EXISTING 2" VENT THROUGH ROOF WITH 3" VENT THROUGH v v <br /> FS 1 1 I CD PIPING(TYP.) - - I ROOF. O <br /> ® ;- C.9 H <br /> 13 CONNECT NEW 8" RD AND 8" OD PIPING TO EXISTING 8" ROOF DRAIN <br /> �(E)3 �--I <br /> I I (TYP.) ! ' (E)2"VTR r = -„ I AND EXISTING 8" OVERFLOW DRAIN. EXTEND NEW 8" RD AND 8" OD <br /> II <br /> 1 4� 2 PIPING TO NEW 10" RD AND 10" OD DROPS TO BELOW FLOOR. <br /> 1 r (E) 1 <br /> 3 14 ROUTE FULL SIZE COPPER DRAIN PAN DRAIN LINE AND T&P RELIEF <br /> • I IEL <br /> BAKERY ��� I <br /> 1 - LINE SEPARATELY BEHIND WATER HEATER(S) TO EXISTING FLOOR SINK <br /> 119 W 1 ------' ------ <br /> 00 (E)2"VTR w AND INDIRECT WITH AIR GAP. <br /> I wa 3 I j I ; ' I ' (E)3" I 15 CONNECT 8" DIA. FULLY INSULATED TYPE'B'EXHAUST FLUE TO EACH <br /> I <br /> o <br /> I <br /> I � � I <br /> U I - - - - I <br /> �u I WATER HEATER CONNECT TO EXISTING FLUE THROUGH ROOF. <br /> I� - I I I 1 �-(E)3..GVV- I <br /> I^ ^I 3 I I 1 16 ROUTE FULL SIZE DRAIN LINE FROM FILTERED WATER DISPENSER <br /> w w 1 E ROOF MOUNTED <br /> `" "I O I 17 BELOW CASE TO EXISTING FLOOR SINK AND INDIRECT WITH AIR GAP. <br /> w <br /> CD PIPING(TYP.) <br /> I RTU-4 - <br /> 1 I M 1 I I I <br /> (E)1"CD (E)3/4 C � I �❑ROOF �❑�❑ �, 17 CONNECT CD FROM NEW ROOFTOP UNIT TO EXISTING CD PIPING <br /> S 1 w I q j I l MOUNTED I , �� MOUNTED ON ROOF. MOUNT NEW CD PIPING ON ROOF. SLOPE MIN <br /> o m o m o <br /> 1' I _ _ _ Tr T � I � � I I �_(E>3" I 1/8"/FT. DOWNWARD AND INDIRECT TO EXISTING ROOF DRAIN. SIZE AS <br /> I I � <br /> C.3' - - - - <br /> J - - (TYP.) ❑ 6 w I E 2„VTR 18 CONNECT CD TO NEW ROOFTOP UNIT. MOUNT NEW CD PIPING ON <br /> > = = .... 1 3,. ( ) <br /> (E)3"VTR N w w _ _ _ - - - - - - - - - - - - - - - - - - - 7 ROOF. SLOPE MIN 1/8 /FT. DOWNWARD AND INDIRECT TO EXISTING <br /> 1 U 1 j W j w (TYP.) 1 - ----(E)4"SS�(E)SL E 1/8"/FT_ --� - - - ---- - - (E)4"Ss - - --- - - - - - - - -------------(E)4"Ss�- -- -<-(E)SLOPE 1/8"/FT----------- - ------(E)4"Ss- ROOF DRAIN. SIZE AS NOTED. <br /> FO = I = �I-- (E)4"GW-------------- ------ ------ --(E)4°GW--------------------------------(E)4"Gw------ -- -------------- --------- ° (E)4"Gw- �� -�1-� I ❑'' 19 ROUTE DRAIN PIPING IN TRUSS SPACE AS HIGH AS POSSIBLE BELOW <br /> (E)4 GCO W 1 1 1 I �(E)SLOPE 1/8 /FT. 1 / <-(E)SLOPE 1/8 /FTcoo . h �-1 I I <br /> (E)4 SS - -- - ---- (E)SLOPE 1/8"/FT.� ---- w�- - --(E)4"SS- w L----------------- E)SL_OPE_1/8"/FT�__ (E)4"SS -- --- 1 (E)4 GCO I - - w O - - - ® - I - ROOF. MINIMUM SLOPE 1/8 /FT. CONNECT WATER DRAIN LINE(WD) <br /> ` -- - - - - - - - - - '- - - - - - - ` - - - - - - - - - - - - - - - - - - - JI -_ - (E)2"V- - -- - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> -(E)4" - I - w - I- C FROM THREE WAY VALVE TO CD LINE BEFORE INDIRECTING FULL SIZE <br /> %-Y_ I SEAM' TO ABOVE w ❑❑ 0 w (E)3/4"CD w I .� CD LINE TO FLOOR SINK WITH AIR GAP, RE: P5-3. <br /> cn <br /> �S 6 I I I IL�(TYP)6_ I �� m I RE:P3 (E)11/4"CD I i u 1 20 PIPING UP THROUGH ROOF. COORDINATE EXACT LOCATION WITH <br /> > - _ (E)2 V` m w i ""ICE E P3 - - - - - - �I <br /> B - - - - - - - - / / - - - - - - - - - - - - - - - - - I = � I 1 1 REFRIGERATIONAND MECHANICAL CONTRACTOR, RE: A7.1-4. <br /> ------ � �' _ 1 � vF,�Do � 1 I I ,� <br /> ~ w w I "' 21 VENT RISER VENT PIPING AND VENT THROUGH ROOF SHALL BE CPVC. <br /> a / I (E)4"GCO (E)2"VTR (E)2"VTR (E)4"GCO ���; 9 (E) (E)2"(E)2"VTR <br /> _ I _ D �1 w TO ABOVE �I 22 OFFSET VENT AROUND HYDRONIC PIPING ON WALL BETWEEN 96 AND <br /> / w I w ❑ (E)2"V i w RE:P3 (E) (E) ��I 108 ABOVE FINISHED FLOOR. RECONNECT TO EXISTING VENT <br /> 3"VTR U ° / I TO ABOVE ❑� � BAKEY BAKERY� <br /> -----; FS RE:P3 �2" -- (E)3 ss _� FREEZER COOLER ��I -----I----- THROUGH ROOF <br /> cv <br /> FROM ABOVE �" 23 INSTALL CPVC PIPE FROM FLOOR DRAIN AND 10'DOWNSTREAM. <br /> FS <br /> / 1 / ° (E) CART O (E) (E) RE:P3 0 . (E)3"SS(D 117 118 �I <br /> EElE PIZZA GROCERY CUSTOMER 24 ROUTE FILL SIZE TYPE'M' COPPER COMBI OVEN DRAIN LINE INDIRECT <br /> > 3„ STORAGE ( ) FROM ABOVE _ TO FLOOR SINK WITH AIR GAP. <br /> _ . `� I � ENTRY (E) EXIT ❑ PREP. t� TRANSFER SERVICE � �_, ___ � �:P3 I I �� <br /> 146 1011101108 110 0 00 I <br /> A _ A <br /> — — — — — — — — — — — — — — — — — — — — — — — — — — — — r"`I — — — — — — — — — — — — — — — — �� f, <br /> 3..wC0 22 4 9 6 U 6 (E) 7 6 <br /> O -- SHEET TITLE <br /> O _ __ O O <br /> 118"A.F.F. _____ __ __ __ __ ==== <br />