My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTAUBAN
>
5110
>
1600 - Food Program
>
PR0518877
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 4:19:10 PM
Creation date
9/24/2020 8:55:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0518877
PE
1619
FACILITY_ID
FA0014185
FACILITY_NAME
WinCo Foods #10
STREET_NUMBER
5110
STREET_NAME
MONTAUBAN
STREET_TYPE
Ave
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
5110 MONTAUBAN Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS <br /> 1 2 3 4 4.2 5 6 7 8 8.1 10 11 GENERAL NOTES NO. DESCRIPTION DATE <br /> 1. THE INTENTION OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL <br /> LABOR AND MATERIALS, AND EQUIPMENT NECESSARY, OR <br /> REASONABLY INFERABLE AS BEING NECESSARY FOR FURNISHING, <br /> (E)EF-13 6 (E)MOTORIZED O INSTALLATION AND TESTING, COMPLETE AND READY FOR SAFE <br /> O 6 <br /> i DAMPER o 0 o OPERATION OF THE SYSTEMS DESCRIBED HEREIN. <br /> ROOF) 0 - - � 2. ALL PENETRATIONS MADE THROUGH RATED ASSEMBLIES TO <br /> (E)MOTORIZED ❑ (E)E -5 6 10 ACCOMMODATE WORK OF THIS SECTION MUST BE SEALED TO <br /> O Ell <br /> DAMPER 6 (E)EF-13 O (R)UH-1 17 4 MAINTAIN THE RATING OF SUCH ASSEMBLY BY A U.L. RECOGNIZED <br /> -1� 6 n SEALING METHOD. <br /> O 0 17 (R)UH-1 <br /> 3. ALL DUCT DIMENSIONS SHOWN ON THE PLANS ARE NET FREE AREA. <br /> � T INCREASE DUCT SIZE WHEN DUCT LINER IS USED. <br /> ❑N - - -00 - - o (ON ROOft <br /> 6 (E)EF-1 D6 5 10 4. ALL DUCTS SHALL BE SUPPORTED BY THE LATEST SMACNA AND <br /> M.9 ASCE RECOMMENDATIONS FOR SEISMIC SUPPORT. SUPPORTS SHALL <br /> FAN <br /> 6 <br /> COILUNIT- AFC BE INSTALLED AT SEAMS OR AS CLOSE AS TO SEAMS AS POSSIBLE. <br /> O 1 <br /> (E) <br /> ROOFTOP RO F ON ROOF 5. DUCT SMOKE DETECTORS AND REMOTE TEST RESET AND LED SHALL <br /> 0 0 0 6 CONDENSING 1 p BE FURNISHED BY FIRE ALARM CONTRACTOR. MECHANICAL ARCH.PROJECT NO. <br /> O(E)UH_3 IT 6 CONTRACTOR SHALL INSTALL DUCT SMOKE DETECTORS IN DUCT. 2004 <br /> o REMOTE TEST, RESET AND LED TO BE MOUNTED AND WIRED BY FIRE DRAB <br /> ❑ (E)UH-3 6N\ 6 -1 ALARM CONTRACTOR AT TEMPERATURE SENSOR LOCATION. <br /> o o SS <br /> 0 <br /> 10 AC 6. THE BOTTOM OF ALL EXPOSED DUCTWORK AND RELATED DIFFUSERS CHECKED <br /> 2 SHALL BE HELD NOT LOWER THAN 13'-0" ABOVE FINISHED FLOOR, RD <br /> Hio AC (E)UH-4 O6 ( ) 6 UNLESS OTHERWISE NOTED. SUBMITTAL DATES <br /> 3 T ® _ 3 o M 7. ALL EXPOSED DUCTWORK SHALL BE RIGID. (NO FLEX). 06/11/20 <br /> 12 ® ° <br /> c; <br /> � - - - - <br /> - � 8. BALANCE DAMPERS TO BE PROVIDED AND INSTALLED ON EACH <br /> 0 <br /> �O� BRANCH DUCT TO SUPPLY/RETURN/EXHAUST. <br /> ❑❑ OTB DATE <br /> 6 (E)UH-4 S )EF- O6 9. CONTRACTOR SHALL BE RESPONSIBLE FOR SEISMIC RESTRAINT <br /> I <br /> 0o O E)EH-3 v (E)EH-2 6 ANCHORAGE AND BRACING REQUIREMENTS, RE: 53.4. <br /> )EH-2 10. ALL MECHANICAL EQUIPMENT TO BE RELABELED PER SPECIFICATION <br /> C)(D 6 230553. x k, <br /> (N) U-12 lO o <br /> (E)EF-8 )EH-3 ° o <br /> H <br /> 6 (E) TG °�u <br /> D <br /> ( H (ON OOF> ( KEYED NOTES o a o W a¢ E, o Lu <br /> ON ROOF O F- z <br /> EF 5 3 (ON ROOF) IT 1. NEW TEMPERATURE SENSOR MOUNTED AT 48 A.F.F. CONTRACTOR o a wz A o <br /> 5 15 5 2 _ TO KEEP EXISTING T-STAT IN SERVICE UNTIL BMS IS FULLY IN z z w E <br /> K.3 SERVICE. THEN REMOVE EXISTING T-STAT. BMS CONTRACTOR TO A z a I z o <br /> w w - <br /> FURNISH AND INSTALL NEW TEMP SENSOR RE: BMS 1. <br /> �U .a �UQ�N c a C6 <br /> Psi L ❑ O ❑ 6 (E)UH-2 ❑ I 3 co <br /> o <br /> � 22"Q)RA <br /> Q ���� (�� 7.© Z 0 3 N <br /> -5 1 2510 CFM W y <br /> ❑ SD 1 4 11 2. MOUNT NEW EQUIPMENT ON EXISTING ROOF CURB. PROVIDE w¢ c7CD <br /> 13 80 CFM ° ° ❑ (TYP 4) TRANSITIONS AND MODIFY DUCTWORK AS NECESSARY TO Uo <br /> ❑ E H-2 6 _ / / / / / (TYP �z ' A°' �' o <br /> ® ❑ CONNECT EXISTING DUCTWORK TO NEW EQUIPMENT. <br /> Qx¢ axo <br /> �� o 00000000 I _ <br /> ( K ❑ - - o o - - - - - - ❑ K ) 3. INSTALL NEW CURB AND MOUNT NEW EQUIPMENT AT PREVIOUS o °o <br /> L 2 EF o 0 0 o D LOCATION SUCH THAT EXISTING DUCT PENETRATIONS ARE <br /> ALIGNED WITH SUPPLY/RETURN OPENINGS IN NEW CURB. MODIFY �/� N <br /> (O RO (E) SD 13 (E) R 13 (E) SD 13 (E) 2150 CFM <br /> DUCTWORK AS NECESSARY AND PROVIDE TRANSITIONS TO � <br /> 340 CFM 1600 CF 315 CFM 13 (TYP 3) <br /> CONNECT NEW EQUIPMENT TO EXISTING DUCTWORK. <br /> (TYP 2) < L-A :T: -1 <br /> O <br /> 4. AFTER NEW CASES ARE INSTALLED REFURBISH EXISTING Q <br /> UNDERCASE RETURN PLENUM TO MATCH NEW AND EXISTING CASE ❑ <br /> o °°o°°❑ o HEIGHTS AS NECESSARY TO RESEAL. RECONNECT DUCTWORK TOco0 <br /> 0 UNDERCASE RETURN PLENUM AND PROVIDE MOUNTING T - - - T <br /> ❑ ❑ <br /> i <br /> I HARDWARE AND NECESSARY TRANSITIONS. CONTRACTOR SHALL 0 �l <br /> ��❑ ❑ BALANCE TO THE CFM VALUE SHOWN. IF UNABLE TO ACHIEVE THE ♦ ♦ Q °� x o <br /> LISTED VALUES CONTACT ARCHITECT/ENGINEER, RE: M2.1-4 & 5. V Q <br /> c LLw <br /> )R`1'U=9 1 5. INSTALL NEW CURB AND MOUNT NEW EXHAUST FAN. 16"x16" ' \ <br /> ° a ° °° o° EXHAUST DUC UP THROUGH ROOF. CONNECT TO 16" RISER OF H-5. IL w W <br /> ° o 0 0 0 ❑ H T PROVIDE 2-LAYERS OF 1-HR WRAP. COORDINATE FINAL LOCATION y @❑ <br /> DOW! o°° o° °o°° J OF EF-15 WITH STRUCTURAL AND VERIFY ALL OUTSIDE INTAKE ARE w <br /> ° TS NOT WITHIN 10'OF FAN. Z LV ❑ � <br /> c If � � � � � <br /> 1 TU6 T 6. EXISTING EQUIPMENT TO REMAIN, RETAIN AND PROTECT. �_ LU r j <br /> 0 - a Lc <br /> (D <br /> C 7. EXISTING DELI HOOD TO BE RELOCATED AS SHOWN. CONNECT TO ❑ <br /> 0 20"O RA VV 24"O 22"0 RA \20"O <br /> RA NEW FIRE SUPPRESSION SYSTEM AND CONTROLS THAT ARE TO BE � � � W <br /> 0 0 <br /> 4 11 INSTALLED IN CABINET OF H-5. PROVIDE ALL NECESSARY N z <br /> _ 1965 CFM 2810 CFM 2075 CFM 1810 CFM <br /> H - - DUCTWORK/TRANSITIONS T E T EXIT DUCTWORK <br /> Q <br /> O CONNECT EXISTING <br /> ® ° ° (TYP 2) (TYP 2) (TYP 7) (TYP 2) z <br /> o <br /> FROM (E) EF-10 TO RELOCATED HOOD RISER. Z <br /> 22"0 RA 22"0 RA 22"0 RA 22"0 RA 22"ORA 20"QJ RA <br /> (DN)RTU-11 2335 CFM 2340 CFM 2335 CFM 2340 CFM 2475 CFM 11 1790 CFM 8. RELOCATE (E)EF-14 AND INSTALL ON NEW ROOF CURB. PROVIDE <br /> 0 0 00 0 0 0 0 0 0 <br /> (TYP 2) (TYP 7) � NECESSARY TRANSISTIONS AND DUCTWORK NEEDED TO CONNECT <br /> 00 0 0 <br /> RELOCATED FAN TO EXISTING DUCTWORK AND HOOD. <br /> O <br /> O o ROFESS/ <br /> O T O P H. <br /> 9 9. INSTALL NEW EXHAUST FAN IN SAME LOCATION AND CONNECT TO ���P��a 44 <br /> O EXISTING DUCTWORK. <br /> 8 5 <br /> ° ° °° ° ° ° ° ° ° 10. MOUNT ABOVE DOOR, RE: Al2-8 FOR MOUNTING HEIGHT & P: 12/31/21 <br /> 00 <br /> 00 0 000 00 �9T Q. <br /> LOCATION. `�� �FCHAN��P��`P <br /> 0 0 0 0 0� 00 F OF CAL�F� <br /> 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11. FASHION PLENUM DROP CONNECTION AROUND REFRIGERATION <br /> 0 0 00 0 0 0 0 0 o n n PIPING AND SEAL AIR TIGHT. COORDINATE REFRIGERATION PIPING 06/11/20 <br /> 0 o 0 0 0 0 LOCATION PRIOR TO INSTALLATION, RE: M2.1-4 & 5. <br /> ' T ' <br /> 15 12 000 ° <br /> 11 0 0 0 0 12. INSTALL NEW CURB ADAPTOR AND MOUNT NEW EQUIPMENT AT <br /> ri (ON ROOF) 0 0 0 o PREVIOUS LOCATION SUCH THAT EXISTING DUCT PENETRATIONS <br /> 0 0 0 0 0 o 0 0 06-0 0 o o ARE ALIGNED WITH SUPPLY/RETURN OPENINGS IN NEW CURB <br /> ° ° ° (E) SR 13 ADAPTER. MODIFY DUCTWORK AS NECESSARY AND PROVIDE <br /> 0 0 0 o o 2670 CF� TRANSITIONS TO CONNECT NEW EQUIPMENT TO EXISTING <br /> o � o� <br /> 0 r, <br /> 0 ° ° ° ° ° ° ° (TYP 2) DUCTWORK. <br /> c F ❑ 0 00 13. EXISTING DIFFUSER/REGISTER/GRILLE SHALL BE BALANCE TO THE r� <br /> VALUE SHOWN. CONTRACTOR SHALL CONTACT ARCHITECT/ • <br /> 15 12 T ENGINEER IF UNABLE TO ACHIEVE THE LISTED VALUES. O <br /> 10 <br /> (ON ROOF) 14. INSTALL NEW T-STAT AT 15'AFF FOR BAKERY FAN. CONTRACTOR <br /> TO SUPPLY, INSTALL, AND CONNECT SENSOR TO EF-6. <br /> W <br /> 15. DUCT SMOKE DETECTOR FURNISHED BY FIRE ALARM CONTRACTOR O <br /> p AND INSTALLED BY MECHANICAL CONTRACTOR FOR AUTOMATIC O <br /> UNIT SHUT-DOWN. F-+ <br /> 16. RETURN DUCT TO BE CAREFULLY DISCONNECTED FROM MAIN. <br /> 0 o EXISTING TAKE OFF SHALL BE PROPERLY CAPPED AND SEALED. w r�ll <br /> 17. RELOCATE (E)UH-1 AND INSTALL PER MANUFACTURER'S <br /> INSTRUCTIONS. O <br /> (E) SR (E) SR E SR E SR 13 13 (E) SR O <br /> 13 13 13 <br /> 13 (E) SR O 2670 CFM O 2670 CFM O 2770 CFM 2770 CFM O O 2665 CFM <br /> SD <br /> p � <br /> 2665 CFM YP 3) (T 4) 42�1 13 0 CFM o �� O <br /> 13 ) SR 13 (E) SR 2 CFM - <br /> 6 CFM O 2665 CFM YP 6) <br /> 0 <br /> T F 14 <br /> 6 ( F-6 3 <br /> ( F) ° ON OOF) <br /> O15 2 F 14 - <br /> 2 <br /> ( N O ) ON OOF) <br /> . . . . . . 17I 01 I T T T1 T IF T i� � <br /> 13 2 0 <br /> C.3 - �ON ROOF) <br /> T 2 (ON ROOF) (ON RO <br /> 13 E S 13 ESD 8 1 (N)RTU-6 T 2, 6 (�)H-2 ❑ <br /> 345 CF 0215 CFM RTU-87 /G:) 6 <br /> E TG 13 E TG 13 <br /> 1075 CFMO 1075 CFM(TVP tTVP I IR <br /> U-7 1 � -4 1 <br /> OF) G <br /> B TS O T 13 13 <br /> 15 2 FM OS CFM <br /> TYP 2 <br /> ) <br /> 000 13 (ESD 13 E Ilk <br /> o O )H-1 3 CFM 180 C (E)EF-7O <br /> OON ROOF <br /> E SD E D SD 2 F O I O ( ) E EG <br /> T T RG ) <br /> (E) AC-1 �6 ) 13 385 CFM 13 405 CF 13 CFM 2 2 3 3 13 7 5 FM ESD 13�� (TYP 3) O OOF) 00 CFM <br /> TE R 13 ( N ROOF) 13 ❑� TYP 2) <br /> FF-Th215 CFTV1 13 <br /> N ni I - I <br /> SHEET TITLE <br /> 0 0 0 <br /> MECHANICAL <br /> PLAN <br /> `O 1 2 3 4 5 5.6 6 6.2 6.4 7 7.3 8 10 11 <br /> SHEET <br /> 0 <br /> MECHANICAL PLAN NORTx <br /> N <br /> 0 3/32" = F-0" <br />
The URL can be used to link to this page
Your browser does not support the video tag.