My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTAUBAN
>
5110
>
1600 - Food Program
>
PR0518877
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 4:19:10 PM
Creation date
9/24/2020 8:55:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0518877
PE
1619
FACILITY_ID
FA0014185
FACILITY_NAME
WinCo Foods #10
STREET_NUMBER
5110
STREET_NAME
MONTAUBAN
STREET_TYPE
Ave
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
5110 MONTAUBAN Ave
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS <br /> GENERAL NOTES KEYED NOTES NO. DESCRIPTION DATE <br /> 1. CONTRACTOR SHALL PROVIDE NEW ENGRAVED LABELS FOR ALL 1. CONTRACTOR SHALL PROVIDE NEW BREAKERS IN EXISTING <br /> BREAKERS WITHIN SWITCHGEAR AT END OF PROJECT. SWITCHGEAR AS SHOWN. <br /> 2. ALL PANEL BOARDS, TRANSFORMERS, AND CONTACTORS WILL BE 2. LOADS AND BREAKERS WITHIN SWITCHBOARD/PANELBOARD <br /> SUPPLIED BY OWNER, INSTALLED BY CONTRACTOR. CONTRACTOR SHALL BE ADDED/REMOVED AS PHASING DICTATES. <br /> TO TAKE RECEIPT AT SITE. COORDINATE WITH GENERAL CONTRACTOR AND STORE <br /> 3. WIREWAYS ARE NOT ALLOWED TO BE USED TO GROUP BRANCH MANAGER IN ORDER TO MINIMIZE DOWNTIME TO REMAINING <br /> CIRCUITS AT PANEL BOARDS. SYSTEMS. <br /> 4. ALL EXISTING EQUIPMENT IS SHOWN HALFTONE, ALL NEW 3. INDIVIDUAL CIRCUIT BREAKERS REQUIRED FOR EXISTING <br /> EQUIPMENT IS SHOWN BOLD. <br /> 5. ALL EQUIPMENT SHOWN AS HATCHED IS TO BE DEMOED. PANELBOARDS SHALL BE SUPPLIED BY CONTRACTOR. <br /> COORDINATE PHASING WITH GENERAL CONTRACTOR. 4. CONTRACTOR SHALL PROVIDE PERMANENT NON-TYPED LABEL <br /> 6. CONTRACTOR SHALL ADD TO THE MAIN SWITCHBOARD BUSSING ON TRANSFORMER INDICATING LOCATION TRANSFORMER IS FED <br /> (5)LUGS PER PHASE, SUITABLE FOR#500 CONDUCTORS, WHICH FROM, AS REQUIRED BY NEC 450.14. <br /> SHOULD BE PLACED BETWEEN THE MAIN SERVICE DISCONNECT 5. PENDANT MOUNT TRANSFORMER FROM THE BUILDING <br /> AND THE DISTRIBUTION SECTION OF THE SWITCHBOARD, FOR STRUCTURE ABOVE THE ASSOCIATED PANEL. <br /> FUTURE TEMPORARY BACKUP GENERATOR INSTALLATION. 6. INSTALL LUGS AND GENERATOR SIGNAGE BETWEEN SERVICE <br /> CONTRACTOR SHALL PROVIDE SIGNAGE AT THIS LOCATION TO ENTRANCE DISCONNECT AND DISTRIBUTION BREAKERS. <br /> IDENTIFY THE LUG LOCATION, AND SHALL USE HAND HELD PHASE RE:E6-GN6. <br /> ROTATION METER AND NOTATE UTILITY PHASE ROTATION ON 8. CONTRACTOR TO PROVIDE BREAKER LOCK AT THIS LOCATION. <br /> SWITCHBOARD IN PERMANENT INK. PLACE A LAMINATED COPY OF ARCH.PROJECT NO. <br /> GENERATOR STARTUP SPEC SECTION 260500A, PERMANENTLY 2004 <br /> AFFIXED TO SWITCHBOARD AT GENERATOR LUG LOCATION. <br /> RE:E6-3 FOR SIGNAGE REQUIREMENTS. DRAWN <br /> JF/DL <br /> CHECKED <br /> BC <br /> SUBMITTAL DATES <br /> DISTRIBUTION SECTION(S) <br /> 06/11/20 <br /> (E) MSB 22 800AIC <br /> OO 277/480V, 3PH/4W OTB DATE <br /> SQUARE D QED SWITCHBOARD <br /> 2000A, 35KAIC <br /> M 2000/3 <br /> GFP ) x w <br /> Up � <br /> O <br /> AZ <br /> rzu <br /> oa ��oyo: <br /> t,,4 z1 o" <br /> O O O O O O O O O 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 o W ED a <br /> 6 1 175/3 70/3 1 90/3 1 400/3 1 400/3 1 60/3 1 90/3 8 100/3 1 80/3 1 60/3 1 150/3 1 150/3 1 150/3 1 175/3 1 225/3 8 200/3 1 175/3 1 150/3 1 150/3 190/3 70/3 1 110/3 8 200/3 8 200/3 8 200/3 8 200/3 8 200/3 0 a A o M N <br /> E E / E / E / E / E / E O / E o/ E / E / E o/ E / E / E / E O ! E / E / E a/ E / E a� E / E O N O / N O / N O / N O N W E <br /> (E) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) ( ) oa �600 w <br /> ww .aw7Ag0o ? <br /> B L F D C G H I J K zw ,Z Qw w " 3 °° <br /> a Q V a c6 <br /> j z <br /> CG Q Z Q Z 3 N <br /> O <br /> N <br /> O W F W O �i U N C <br /> �y L <br /> p w W ;r PO O <br /> cnQU rwU � O U a <br /> (E) 480Y/277 TRANSFORMER <br /> Q A �� Uwza ,O <br /> BY ELECTRICAL UTILITY AND PAD Z 0 0 0 o c o 0 <br /> C7 n n n n n nS3S <br /> M Q - M ~z- Q Z M M M M M N <br /> U Nz ~ Nz Nz (V z NZ Nz 0 - <br /> 5-5"C. EA. W/ N CJ L7 L7 623 � C7 L7 C7 C7 C7 = <br /> 4-600MCM-420 423 X23 46 N `' 7 � M �' * �' �' * �' * �' * O <br /> o Z �, 0/ Z � 0 0 0 0 Z � M M z � Z � z � z � Z � <br /> N 4 L� <br /> 3 = _ - _ N N N (N) 'TLR2 (N) TLR3 (N) TLR4 (N) TLRS (N) 'TLR6 <br /> U U U U U U U U U 480-208Y/120V 480-208Y/120V 480-208Y/120V 480-208Y/120V 480-208Y/120V U z a m <br /> N 'TLC2' = N N N N N (N) °TLRF N N N -� = 150VA 112.5VA 150VA 112 5V 112.5VA x o <br /> 110AT 110AT ^ 110AT -1 ^ ^ ^ ^ ^ Q U <br /> /120V 4 w w w w w 480-208Y/120V 4 w w w w w 4 4 4 4 4 y <br /> 200AF 200AF 200AF _ _ _ _ _ _ W <br /> (E) 'TRI' (E) RACK A 75VA - 5 F F F 112.5VA - (E) RACK C RACK B 5 5 5 5 ' v L <br /> NEMA 3R NEMA 3R NEMA 3R 5 <br /> LL <br /> 480-208Y/120V - FORMERLY ( (N) DISC. (N) DISC. (N) DISC. J FORMERLY RMERLY w U j <br /> 112.5kVA PROTOCOL J p PROTOCOL OTOCOL ¢o co <br /> w <br /> A Qo (N) (N) (N) N \ E \ \ N N N N N Z � <br /> J 60/2 30/2 5 / RTU-11 RTU-10 RTU-9 Q M J 125/2 70/2 ` 100/2 J 200/2 � W � <br /> � (E) (E) ) (97A) (97A) (97A) Cz7 (E) (E) ) U (E) (E) Q W c0 r� <br /> 3 � Q UQ z UQ UQ � Q � Q � Q a O <br /> U Q N Z z 4 N Z � � Z �`� Z � � Z � � Z O <br /> z � <br /> � JL <br /> Z U Z � � ,� � � 0 � <br /> N \ ^ W U <br /> w z � CD <br /> Z � E � z � � Z � Z � Z � Z � Z � Q O <br /> (E) 'AD' U z <br /> PANEL PANEL PANEL ^ 480-208Y/120V PANEL PANEL PANEL PANEL N - W °8 PANEL PANEL PANEL PANEL PANEL <br /> 112.5kVA HB HA HEM w �' - (E) 'TE' 'LR2 LR3 'LR4 LRS 'LR6 <br /> � 'HF' AHC, 'LC2' 'LR1' W � � `J ' <br /> 4# (E) 'TA' N (E) 4 - 0 Q (E) (E) (E) (E) TF 480-208Y/120V <br /> Z 480-208Y/120V ( ) / (N) 2 / z (N) 25kVA Y/120V 4 - 0 37.5VA (N) (N) (N) (N) (N) �o Q�pFESS/p�y9l <br /> U z Q I0kVA <br /> Z 20 795AIC Q 5 697AIC 11 569AIC (E) 100kW 1 12 187AIC 11 894AIC 11 368AIC 15 121AIC115,121AIC ILLIAM RTO F/ <br /> G j o Q G STANDBY CRAB <br /> o Cz7 GENERATOR E L6 <br /> W/ 150/3 <br /> (E) 200/3 o sT FBF <br /> W/3-200A M oo MAIN BREAKER 9TF OF CA <br /> 7t <br /> N <br /> U 06/11/20 <br /> ONE-LINE DIAGRAM <br /> U NTS M <br /> W W <br /> W 4# (E) 100/3 (E) 100/3 (E) 100/3 (E) 'TL' <br /> (E) 100/3 W/3-90A W/3-70A W/3-90A 480-208Y/120V <br /> W/3-80A 112.5kVA = PANELPANEL -CT S CHEDULE X PANEL O3 (E) 1 1/4"C W/3-4 <br /> 'LA' HD & 1#8 GND (E) <br /> GENERATOR CONNECTION POINT (E) MARK ZONE RATING <br /> Q Z 'TJ' A SERVICE 2000A <br /> LUGS HAVE BEEN INSTALLED BEHIND THIS PANEL ON THE SWITCHGEAR L7 480-208Y/120V O <br /> Q Q Q � - B RACK A 100A <br /> Lz7 Lz7 Z z o Q BUSSING TO ASSIST IN THE TERMINATION OF GENERATOR CONDUCTORS 15kVA C RACK B 100A ►--� <br /> z00 00 Q� Z Q IN THE EVENT A PORTABLE GENERATOR IS NEEDED DUE TO A UTILITY Q <br /> z OUTAGE. THERE ARE 5 LUGS SUITABLE FOR#500 CONDUCTORS PER 6' Z Z Z Z D RACK C 100A <br /> � � 0 ( ) Q c Q (E) 2"C W/2-8 & rT1 <br /> 46 4 8 � PHASE. ELECTRICIAN SHALL FOLLOW THE GENERATOR STARTUP U z L7 C7 C7 E RACK D 100A W <br /> 1#8 GND <br /> DIRECTIONS DURING UTILITY OUTAGE. o � oo0c oc <br /> F PANEL LR1 200A61� O <br /> o o °8 G PANEL LR2 200A O <br /> U U U U v `4 00 <br /> H PANEL LR3 200A �--� <br /> U <br /> _ GENERATOR SIGNAGE a I PANELLR4 200A M <br /> N 3 NTS _� U U U U U U_ J PANEL LR5 200A rY'1 <br /> w w w w w w w M w w w w w K PANEL LR6 200A Q <br /> REMOTE REMOTE REMOTE REMOTE `J 'TL2' 'TR2' (E) 'TLEM' � ' <br /> w w <br /> (E) TLCR3 (E) TLCR L PANEL HF 400A <br /> 'C' 'B' 'A' 'D' PANEL 480-208Y/120V 480-208Y/120V 480-208Y/120V 480-208Y/120V 480-208Y/120V <br /> PANEL PANEL PANEL PANEL O <br /> (E) (E) (E) (E) MED 'HSL' 'HIV' 'LD' 'LB' - 112.5kVA - 30kVA 30kVA - 30kVA"K4" - 45kVA "K4" - <br /> (E) (E) (E) (E) <br /> -ELECTRICAL LOAD SUMMARY- o O <br /> Z U O U <br /> EXISTING LOADS (EXISTING) C O <br /> 12 month Maximum Demand Load (7/19) 773.0 kVA <br /> Q Q Q Maximum Demand at 125% 966.3 kVA w <br /> z z z <br /> � 0 400/3 Z Q GROUND LUGS INSIDE TRANSFORMER TRANSFORMER HOUSING <br /> EXISTING LOAD TO BE REMOVED (DEMO) W/3-400A Z Q SECONDARY GROUNDING <br /> 0o C7 z CONDUCTOR <br /> PRIMARY GROUNDING <br /> 0 0 o REFRIGERATION PROTOCOLS 803.8 kVA (E) GUTTER N CONDUCTOR <br /> AIR HANDLERS 213.9 kVA <br /> U U U M Q M Q <br /> N N N NEW LOADS TO BE ADDED (NEW) 2 <br /> - - <br /> w w w RACK A 49.7 kVA w w 100/3 <br /> PANEL HF 164.2 kVA W/3 90A w w <br /> PANEL PANEL PANEL REMOTE PANEL PANEL <br /> PANEL HC 88.3 kVA U <br /> 'LG1' 'LJA' 'LH' PANEL PANEL ,G, LEM' 'LCR3' PANEL a w <br /> (E) (E) (E) PANEL LC2 60.2 kVA ( 'LC' 'LFF (E) 3 (E) (E) 'LCR' <br /> RTU-11 80.5 kVA (E) (E) (E) <br /> PANEL PANEL PANEL RTU-10 80.5 kVA <br /> 'LG2' 'LJB' 'LH2' O RTU-9 80.5 kVA PANEL PANEL <br /> (E) (E) (E) <br /> PANEL LA 2.8 kVA 'LF2' 'LCR' 480V, 3PH 208/120V, 3PH <br /> (E) (E) <br /> PANEL HD 110.4 kVA <br /> PANEL LR1 112.5 kVA O 1 - <br /> PNEL HB 0.0 kVA TO BLDG. STEEL COLUMN OR <br /> PANEL HA 49.5 kVA GROUND BAR IN ELECTRICAL ROOM. <br /> PANEL HEM 7.3 kVA TRANSFORMER SIZE PER NEC SCHEDULE BELOW <br /> RACK C 43.8 kVA <br /> RACK B 48.5 kVA 2 GROUNDING DETAIL <br /> PANEL LR2 145.0 kVA NTS <br /> PANEL LR3 89.8 kVA WIRE SCHEDULE <br /> PANEL LR4 133.3 kVA SHEET TITLE <br /> TRANSF. O O <br /> PANEL LR5 84.1 kVA KVA <br /> PANEL LR6 103.3 kVA 15 #10 #6 <br /> 30 #8 #3 ONE-LINE <br /> NEW LOAD SUB-TOTAL 1534.4 kVA 45 #4 #2/0 DIAGRAM <br /> 75 #1 #4/0 <br /> TOTAL (EXISTING-DEMO+NEW) 1483.0 kVA <br /> a 1786 Amps �a 480V/3P 112.5 #1/0 #1/0 <br /> 150 #1/0 #1/0 SHEET <br /> cYi 225 #2/0 #2/0 <br /> M <br /> N ALL GROUNDING CONDUCTORS <br /> 0 <br /> SHOWN IN THIS TABLE ARE COPPER. <br /> N <br /> O� <br />
The URL can be used to link to this page
Your browser does not support the video tag.