Laserfiche WebLink
REVISIONS <br /> NO. DESCRIPTION DATE <br /> REFRIGERATION LEGEND <br /> SYMBOL DESCRIPTION <br /> 1 2 3 4 5 6 7 8 9 10 11 ® EPR WITH SUCTION STOP SOLENOID. PROVIDED <br /> BY OEM, INSTALLED BY REFRIGERATION <br /> 0 0 o CONTRACTOR. 208V CONTROL FROM <br /> ap - - - - - - - - - - - - - - - _ _ - _ _ - - _ ° - - - - - - - REFRIGERATION CONTROL BOARD WIRED BY <br /> ELECTRICAL CONTRACTOR, COORDINATE WITH <br /> REFRIGERATION CONTRACTOR. <br /> I I I I I I I I I <br /> 0 <br /> SUCTION STOP SOLENOID. 208V CONTROL FROM <br /> ° _0 (0) 0 REFRIGERATION CONTROL BOARD WIRED BY <br /> o ELECTRICAL CONTRACTOR. <br /> o o _ _ _ _ _ _ LIQUID LINE SOLENOID. 208V CONTROL FROM <br /> F-D -D IE <br /> � REFRIGERATION CONTROL BOARD WIRED BY <br /> ELECTRICAL CONTRACTOR. <br /> I I I I I I I I I <br /> oR REFRIGERATION STUB-UP <br /> ❑ b UR REFRIGERATION CONNECTION <br /> IE ARCH.PROJECT NO. <br /> ° 0 0 ° FIELD MOUNTED SOLOCHILL CONDENSING UNIT 2004 <br /> 0 Ll DRAWN <br /> FACTORY MOUNTED SOLOCHILL CONDENSING GH <br /> 0 0 ° UNIT <br /> 0 CHECKED <br /> I I I I I I I I I I <br /> MC <br /> I I I I I I I I <br /> SUBMITTAL DATES <br /> M - ° M <br /> 06/11/2020 <br /> (E) BULK <br /> L FOOD °° T <br /> BLOOM BI-B3 0 L GENERAL NOTES OTB DATE <br /> 143 B6 (E) CS R ❑ BO S =2 1/8 <br /> o <br /> BS R B4 13 SR=15/8" s s s <br /> PRE-CUT <br /> E ME C4 ° L=5/8" 7 L B3 B3 L B2 B2 L BI BI L A7 L A6 L A5 1. PIPING SHALL BE LOCATED SO THAT ACCESS TO THE SYSTEM <br /> ( ) AS-A7 COMPONENTS IS NOT HINDERED AND THAT ALL COMPONENTS THAT <br /> o ROOM P S =2 1/8"LI COULD REQUIRE FUTURE MAINTENANCE ARE EASILY ACCESSIBLE. o <br /> 140 00 SR=I X5/8" REFRIGERATION B1,B2 (E)DAIRY O A5,A6 (E) 2. THE REFRIGERATION CONTRACTOR SHALL REVIEW AND z° <br /> = o S =1 5/8 S =1 5/8 x o W F <br /> (C10 ° C10,C11 = 134 L=5/8 B1-B9 PLATFORM ° _ ° _ ° SR-1 3/8" COOLER SR=I 3/8" GROCERY STRATEGICALLY LOCATE ALL CONTROL VALVES PRIOR TO THE o o 4 o a <br /> C9-C11 C7 C9-C11 C7-C11 B6 B8 B5 s 135,136,138 B5-B8 _ 121 INSTALLATION OF ANY PIPING. THE PLANNING OF THE REFRIGERANT F u x z <br /> C4-CI I B4-B8 AI-A9 S =2 5/8 SEE R3 L-5/8 L-5/8 � <br /> S =1 3/8" (E EAT B6 S =1 3/8" S =1 3/8" S =1 3/8" S =1 1/8" s"C5R S 1 38"-S =1 3/8" I 120 o�, 0 g W <br /> F EZER - - - - - s S =2 5/8 S =1 5/8 S =2 5/8 SR=2 1/8 PIPE LOCATION SHALL INCLUDE ACCESSIBLE LOCATION AND <br /> PR DU SR=2 1/8" SR=S/8" SR=S/8" SR=S/8" SR-5/8" SR=S/8" SR=S/8" z° a " z z <br /> R=I 5/8" SR=5/8" SR=5/8" L-1 1/8" ADEQUATE SPACE FOR INSTALLATION ADJUSTMENT OF VALVES. o a a <br /> 41 s B4 - � z�oo <br /> C OL L=1 1/8" A8 L=1/2" L=1/2" L=1/2" L-1/2 7 L=1/2 L=1/2 C4 s L=1/2" L=1/2" L=1/2" C3 I a z z w E <br /> 3. THE COORDINATION OF THE REFRIGERANT PIPING INSTALLATION <br /> s 144 oW I w <br /> s R 5 SL6.1 SL6.2 SL6.3 SHALL BE IN AGREEMENT WITH THE OVERALL CONSTRUCTION a Q z z o <br /> (N)JUICE d SCHEDULE AND SHALL HAVE ALL PIPING PATH AND ACCESSORY a " S <br /> C6-CII LOCATIONS CONFIRMED BY THE REFRIGERATION CONTRACTOR z a a a o z° I z y 3 <br /> 1 7 ❑ „ (E)DE � CS-C11�, 7 A8 C1-C3 C1-C11 COOLER <br /> s 5 =13/8 ¢� <br /> 3 E OLE S =2 1/8" S =1 1/8" S =1 5/8" S =2 5/8" 122 I PRIOR TO CLOSINGS OF ANY WALL FLOOR OR CEILING WHERE CIO <br /> ( ) 3 (E) SR=S/8" <br /> I SERVICE O C6 135 SR=I 1/8" SR=I 1/8" SR=I 1/8" SR=2 1/8" ° C3 I REFRIGERANT PIPING MAY BE PASSING THROUGH OR INSTALLED IN. F W a ° 3 <br /> 1 I I OD LI L-1/2 L=7/8' L=7/8" L=7/8" 8 °L=1 1/8" o-� ❑ it - ?' o / �c� o-� 4. PRIOR TO INSTALLATION OF ANY REFRIGERATION PIPING, THE Q � � M p o° ° <br /> SM 1 L 1 ° ❑ SM2.6 SM2.5 SM2.4 SM2.3 SM2.2 SM2.1 <br /> 7 1 O I <br /> =13', B7 3 ° L s I REFRIGERATION CONTRACTOR SHALL COORDINATE ALL PIPING a x o 0 <br /> C11 I I Fm FRI 7 sLi�.i,4 OsLi�. ,3 sL6.i, O sL6.2,31uLLL1qmfl SL7.1 PATHS WITH STRUCTURAL ELEMENTS IN CONJUNCTION WITH THE o o <br /> - - - - - ° - - - - - - 7y"j <br /> I - - - - - - - - - - - - -SM1.1 -F - -�J::_ - - - - - - - - - - - - - - GENERAL CONTRACTOR. 0 3 <br /> ❑ sM C7 CR B8 5. ABSOLUTELY NO PIPING SHALL PASS ABOVE ELECTRICAL PANELS <br /> SL22.1 SL8.1 SL 2 SL8.3 SL8.4 SL8.5 SL8.6 <br /> SM9.1 SM9.2 SM10.1 SM10.2 11 SM10.3 I I SM10.4 SL5.1 AND TRANSFORMERS OR THROUGH HALLWAYS. r� <br /> 6. THE REFRIGERATION CONTRACTOR SHALL COORDINATE ALL PIPING <br /> I I I I S =1 5/8" PATHS TO AVOID CONFLICTS WITH ALL OTHER TRADES. (I.E. HVAC = I <br /> C11 I I I I 1 I 1 I I S =1 5/8" I I I I <br /> EQUIPMENT, HVAC DIFFUSERS, DUCT WORK, FLUES, LIGHT FIXTURES, ❑ <br /> ❑ I I <br /> SR=I 3/8" PLUMBING LINES, DECOR, PALLET RACKING, STRUCTURAL ELEMENTS, r� <br /> TRANSFORMERS CONDUIT ETC. <br /> I I I I 1 I I I <br /> L=1/2" I I I I ) O <br /> ° SL17.2 ° <br /> SLI 1.3 SL11.2 SL11.1 SL10.3 SL10.2 SL10.1 7. MOUNT OVERHEAD REFRIGERATION LINES EITHER INSIDE OR WITHIN c❑ o <br /> (E ° a o C9 C8 SL21.3 SL20.3 SL19.3 I SL18.3 %11 SL17.1 SL17.3 SL4.1 12" OF BOTTOM OF BAR JOIST. THE MAXIMUM HEIGHT OF THE O _ O N <br /> OD E A9 ® '" L12.1 SL9.1 INSULATION OF REFRIGERATION LINES RUNNING HORIZONTALLY �_ Q m x o <br /> DRY A9 SL21.2 R SL20.2 SL19.2 O ° R® ABOVE CASES IS 17". ALWAYS MAINTAIN PROPER SLOPE BACK TO THE Q 0 <br /> C9 C8 SL18.2 SL17.4 I I COMPRESSOR RACK, IF NECESSARY INSTALL INTERMEDIATE RISERS W <br /> ROOM C9 C8 • SL21.4L20.4 SL13.1 SL13.2 SL13.3 SL14.1 SL14.2 SL14.3 <br /> 145 ° <br /> A9 • SL19.4 ® S 18.4® ❑ U TO MAINTAIN ELEVATION. ' Z <br /> s ° A9 I •i SL21.1 1 o I IL 8. SUCTION P-TRAPS TO BE SAME SIZE AS HORIZONTAL RUNS, REDUCE a w W n <br /> C9 C8 ° I ° ° o°SL20.1 i I SL19.1 ° ° SL18.1 O I I O WITH BUSHINGS AT THE TOP SIDE OF P-TRAP. INTERMEDIATE P-TRAP (All <br /> ❑ <br /> SL3.1 J SIZE SHOULD BE THE SAME SIZE AS REDUCED RISER. z < ❑ <br /> I I 1 ° � 9. EQUIPMENT MANUFACTURER TO SUPPLY SUCTION AND LIQUID BALL W Q <br /> I I SL1 5 I SL16.4 S 16.3 SL16.2 SL16.1 SL15. SL15.5 SL15.4 SL15.3 SL15.2 SL15.1 VALVES FOR EACH BRANCH OF LOOP PIPING SYSTEMS. H <br /> II 1 <br /> O I I O O 1 1 1 REFRIGERATION CONTRACTOR TO INSTALL BALL VALVES IN W <br /> I 11 ILJ ACCESSIBLE LOCATION TO ALLOW FOR ISOLATION AND SERVICING. * d <br /> I I I I I SM6.1 SLS 112 VALVES ARE TO BE INSTALLED ON THE RACK SIDE OF FIELD o 0 <br /> SM8.5 SM8.4 SM8.3 I SM8.2 I I SM8.1 SM7.4 11 SM7.3 SM7.2 SM7.1 INSTALLED CONTROL VALVES/SOLENOIDS. o W <br /> I M5.1 SM5.2 Sl 5.3 SM4.1 SM4.2 SM4.3 SM4.4 SM3.1 SM3.2 SM3.3 SM3.4 SL2.1 N <br /> ° ° 10. THE REFRIGERANT CONTRACTOR SHALL INVESTIGATE AND ENSURE � ❑ <br /> _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - - _ _ _ _ _ �❑ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ H COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES PRIOR = <br /> I � ° C I I I I � TO INSTALLATIONS. THE ENTIRE INSTALLATION SHALL BE IN Z � <br /> sLi9 i,a sL192,3 sLis 1,4 sL182,3 6 o AI-A4 ACCORDANCE WITH ALL APPLICABLE CODES. <br /> CI,OO OO S =1 1 S = 5/8" <br /> /8 11. MOUNT FIELD CONTROL VALVES IN A SERVICEABLE LOCATION. <br /> I I I 4 7 I 4 7 I S =1 1/8" SR-1 3/8" ' I ' I <br /> SR=2 1/8" L=1/2" <br /> ❑ L=1 1/8" SLI.1 9,0FESS/0 <br /> HI I I I I ��Q �p H. �ql <br /> m -774= <br /> �� PNO.. <br /> ❑ ❑EllI cm <br /> KEYED NOTES sT �FCHAN�GP� <br /> OPCA �FO� <br /> 1. UNDERGROUND REFRIGERATION LINES TO BE PLACED IN PVC, RE: <br /> Lool ° ° ° R3-6. 06 11 2020 <br /> °° ° ° ° ° °° ° ° �,.� 2. UNDERGROUND LINES TO BE PLACED TO AVOID FOOTING AT BASE OF <br /> ❑ ❑ ❑ ❑ �� 3. ROUTE LINES UP INSIDE WALL. <br /> (E) MAIN 4. ROUTE REFRIGERATION LINES NO MORE THAN 12"ABOVE TOP OF <br /> ° SALES REFRIGERATION CASE. <br /> SM12.5 0 0 ° 100 5. LINES CONTINUED TO PLATFORM AND TO APPROPRIATE <br /> REFRIGERATION RACK. SEE R3 &R4 FOR PLATFORM PLANS AND <br /> ° EQUIPMENT LAYOUT. O <br /> 6. RUN HIGH AND DROP BESIDE DUCT. OFFSET UNDER DUCT AND <br /> CONTINUE DOWN TO CASES. EACH RISER SECTION TO BE TRAPPED. <br /> 7. ROUTE ALL REFRIGERANT LINES ABOVE BOXES. COORDINATE • <br /> SM12.4 INSTALLATION WITH COOLER BOX INSTALLERS. O <br /> 8. ROUTE REFRIGERANT LINES ABOVE BOTTOM CORD OF TRUSS AND <br /> ABOVE LIGHT FIXTURES. W <br /> 9. ROUTE PIPING HORIZONTALLY BETWEEN TOP OF CASE AND BOTTOM <br /> OF LOWEST SHELF OF HIGH BAY STORAGE. LOCATE RISER AT END OF <br /> 6 RACKING. FF-O��--II O <br /> SM12.3 10. REFRIGERATION CONNECTION THROUGH TOP OF CASE. MOUNT <br /> \ _�2-A4 A4 CONTROL VALVES ABOVE CASE IN A SERVICEABLE LOCATION. RE: <br /> - ❑ - - - - - - - ❑ - - - - - - - - - - - - - - - ❑ -- - 8 - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br /> =7/8" R3-10 &R3-11. <br /> -SR=S/8" 4 L � 11. MOUNT UNISTRUT ON PLENUM WALL TO MOUNT LOOP PIPING. RE: <br /> CUE]I I I I <br /> L=1/2" 10 A3 R3.1-10. l <br /> L <br /> SM 12.2 I I I I I I I I I O n <br /> ❑❑❑ I I I I I I I � O <br /> ❑ ❑ L <br /> ❑D - - - - - - E - - - - - - - - - - - - - - - - - - - - - - - -� - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ❑D❑ O <br /> SM12.1 l <br /> o <br /> a <br /> SM13.4 <br /> 0 <br /> 0 <br /> tm Lm <br /> SM13.3 <br /> I I I I I I I I LT <br /> Ll <br /> I I I I I IT TIT T T T IT T T <br /> I <br /> ❑ ❑ �� I� I I I I ❑ <br /> SM13.2 77S .1 SL231 <br /> ° ° ❑ <br /> I I I I I I I I I <br /> C - - - - - - - - - - - - - - ❑ - - - - - - - ❑ - - - - - - - ❑ - - - - - - - - ❑ - - - - - - - - - - - - - - - - - - - ® - - - - - - - C <br /> SM13.1 0 - <br /> ❑ °° o 0 <br /> o <br /> � - - - - - - - - - - - -I L <br /> - - - - - - - - ❑ - - - - - - - - o - - - - � <br /> ❑ ❑ ❑ ❑ ❑ 0 - <br /> O (E) A <br /> SM14.1 ° o ° ° C O <br /> ❑ �� 4o ® BAKEY BAKERY <br /> ❑ ❑❑ ❑ o o FREEZER COOLER <br /> 17O Oo <br /> SM15.1 SM16.1 ° Ll 7 C1 7 Al Al C2 <br /> �R �R R <br /> ❑ S L OO S L <br /> JLLS L <br /> - - - - A <br /> REFRIGERANT PIPING PLAN <br /> 3/32" F-0" SHEET TITLE <br /> 1 2 3 4 5 6 7 8 9 10 11 <br /> REFRIGERANT <br /> PIPING PLAN <br /> a <br /> O1 SHEET <br /> 0 <br /> N <br /> O <br /> N <br /> O <br /> N <br />