My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:29:42 AM
Creation date
9/24/2020 9:29:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPW Installation, Operation, and Maintenance Manual, Page 73 Executive Order VR-102-0 <br /> signal that the tank is full. Close transport delivery valve HOW TO LOCATE THE POSITION OF THE 61 SO AT <br /> and drain hose into tank before disconnecting any hose 95%TANK CAPACITY <br /> fitting. (Shut-off points can be adjusted to any capacity to <br /> Overfilled Tank: Failure of the hose to drain after clos- comply with AHJ Requirements) <br /> ing the delivery valve signals an overfilled tank. Do Not <br /> disconnect any delivery hose fitting until the liquid leve! The length of the upper tube and the placement of the <br /> in the tank has been lowered to allow the hose to drain 61 SO valve body determine the shut-off point. Follow- tj <br /> into the tank. ing the standard instructions for the OPW 6150 will pro- <br /> vide for initial shutoff at 95%. In all cases,the upper <br /> WARNING tube length must be a minimum of 6-112" plus the <br /> In the event you are splashed with fuel remove wet length of the riser pipe. All length measurements are in <br /> clothing immediately. Skin contact with gasoline inches. <br /> can cause chemical burns and may result in <br /> Inhalation of vapors that maybe fatal. Nevergo INSTRUCTIONS j <br /> inside confined areas after being splashed and 1) Find tank capacity(in gallons)from tank calibration <br /> never go near ignition sources. <br /> chart provided by tank manufacturer. <br /> IMPORTANT <br /> 2} Calculate 95%of capacity <br /> Determine if the underground storage tank is equipped <br /> with a ball float vent valve,as illustrated in Figure 16. In 3) Locate the 95%volume number on the tank calibra- <br /> allsystems,theshut-offpointof the 61 SO must be tion chart, <br /> reached before the ball float reduces flow to ensure 4) Find the dipstick number(X)which corresponds to <br /> proper overfill valve operation. the 95%tank volume. And, find the dipstick num- <br /> TOOLS NEEDED FOR INSTALLATION AND ASSEM- ber(Y)which corresponds to the 100%volume. <br /> BLY: I <br /> 1. Drill 5) Subtract the dipstick number(X)from the tank di- i <br /> ameter(Y)to find the upper tube reference number f <br /> 2. A sharp 118"pilot drill bit (Z). <br /> 3. A sharp 5116"drill bit (Y)-(X)=(Z} <br /> 4. Tape measure 6) Subtract 2"from (Z)to find the upper tube depth I' <br /> 5 Hacksaw orcut-off saw,fine tooth;24teethlinch (C), <br /> 6. Fine half round file (Z)_2°=C <br /> 7. Screwdriver-Phillipsblade 7) Is C less than 6-112"? <br /> B. 112"Wrench or socket <br /> 9. Two-part sealant(Supplied) NO Upper tube length is C plus the distance from <br /> 10 Torque Wrench the top of the Face Seal Adaptor installed on the <br /> WARNING riser pipe to the inside, top lip of the storage <br /> Using electrically operated equipment near gasoline tank(A). <br /> or gasoline vapors may result in fire or explosion, Upper Tube Length=C+(A) <br /> causing personal injury and property damage. <br /> Check to assurethe working area is free from such YES Upper tube length is 6-112"plus the riser pipe <br /> hazards,and always use proper precautions, measurement (A). 1 <br /> IMPORTANT:The figures in this installation and <br /> maintenance instruction may contain vapor recovery Upper Tube Length=6-112"+(A) <br /> equipment (including model numbers) that is not certi- <br /> fied bythe California Air Resources Board(CARB)fora NOTE: You must find the actual tank capacity num- <br /> specific Phase I VaporRecovery System.Pleasereferto ber that correlates to the 6-112" +(A) depth for the <br /> Exhibit 1 of the appropriate CARB Phase I Executive Or- station records. This number may also be used for <br /> der for a list of certified Phase I Vapor Recovery System the purposes of calibrating an electronic tank level <br /> Equipment. system. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.