My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
755
>
2300 - Underground Storage Tank Program
>
PR0508090
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 9:29:42 AM
Creation date
9/24/2020 9:29:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0508090
PE
2361
FACILITY_ID
FA0007938
FACILITY_NAME
CHEVRON #208117**
STREET_NUMBER
755
Direction
S
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
24202029
CURRENT_STATUS
01
SITE_LOCATION
755 S TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill,Overfill,Leak Detection and Secondary Containment Equipment at UST Facilities <br /> • inspect and reinstall all containment sump If the water level changes 1/8(0.125)inch or great- <br /> lids, gaskets and covers. er,the containment sump fails the integrity test. <br /> 6.6.7 Pass/Fall Criteria. If the water level 6.6 Accelerated Precision Hydrostatic Test for Spill <br /> changes less than 1/8 (0.125)inch,the containment Buckets and Containment Sumps. Electronic preci- <br /> sump passes the integrity test. sion test equipment can be utilized to test spill buckets <br /> and containment sumps. It incorporates more sensitive <br /> '77 �, equipment that permits a test to be conducted in a shorter <br /> period of time.The procedures use the same test fluid and <br /> tests the same volume as other methods outlined in this <br /> chapter.The manufacturer of the measurement equipment <br /> should specify the precision and duration of the test and <br /> the pass/fail criteria. However, pass/fail criteria should <br /> not be less stringent than those prescribed for the l-hour <br /> test in Section 6.5.7. <br /> The data sheet for Sections 6.2 or 6.5 may be used for this <br /> test.Refer to Appendix D. <br /> F 6.7 Proper Disposal of Test Liquids. Test liquids <br /> must be disposed of properly. Check with the AHJ <br /> regarding requirements for proper disposal. <br /> FIGURE 6-7. The test fluid level In the tank sump must <br /> be at least 4 Inches above the highest sump penetra- <br /> tion or sidewall seam. <br /> 7. UST OVERFILL EQUIPMENT <br /> VERIRCATION, INSPECTION <br /> ' AND TESTING <br /> Although the effectiveness of overfill prevention devices <br /> can be tested by attempting to overfill a UST with <br /> t: product and determining how well the device functions, <br /> . . this approach is not recommended. Any malfunction in <br /> r the overfill prevention device could result in a product <br /> f yJ release that could result in a threat to public health and <br /> j . safety and environmental damage. <br /> Federal UST rules require that overfill prevention equip- <br /> y ment automatically restrict flow or alert the transfer <br /> operator when the tank is no more than 90 percent full <br /> or shut off flow into a tank when it is no more than 95 <br /> w percent full.Other alternatives to prevent overfills are the <br /> restriction of flow during a delivery 30 minutes prior to <br /> overfilling;alerting the operator 1 minute before overfill- <br /> ing may occur; or automatically shutting off flow into a <br /> 1 <br /> ' tank so that none of the fittings located on top of the tank <br /> are exposed to product due to overfilling. <br /> The committee has written the recommended practices <br /> FIGURE Ga. Measuring sticks used to ure the for automatic ghutoff devices to reflect that the devices <br /> water level should be securely moue o nsure that ""' must be s shut off flow when the tank is no more <br /> they do not move during the test. 95 percent full, and flow restriction and overfill <br /> --- - -- -- ----- - -�l�191199 <br /> peLorg ID <br /> ENVIROKIM "A! `- r,:ALTH <br />
The URL can be used to link to this page
Your browser does not support the video tag.