Laserfiche WebLink
Opliii' 7150 Overfill Materials <br /> ` Important <br /> Prevention Valves In order to prevent product <br /> Valve Body: Cast aluminum spillage from the Underground <br /> The CAftB-certified OPW 7150 Storage Tank (UST), properly <br /> Float; Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve and a proper connection at the <br /> is designed to prevent the overfill of Valve ; Aluminum tightAll adaptor are essential. <br /> underground storage tanks by providing Seals : Viton® Delivery personnel should <br /> , managed and trained <br /> a positive shut-off of product delivery. Upper & lower DropTube: Aluminum to <br /> inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts; Acetal and hoses for damaged and <br /> the drop tube used for gravity filling. p ., missing parts. They should <br /> Hardware: Stainless steel c+qR$ r always make certain there <br /> The OPW 7150 allows easy Installation ¢Is a positive connection <br /> (without breaking concrete) and requires r?y, between the adaptor and <br /> Features elbow. If delivery equipment <br /> no special manholes. +r Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut-off valve. When the liquid special manholes required , coupled i the adaptor, a <br /> p q serious spHl may result when <br /> level rises to about 95 % of tank a Economical — costs a fraction the DPW 71 SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> released, closing automatically with of expensive, complicated and contamination. <br /> the flow. This reduces the flow rate to difficult-to-install valves, <br /> approximately 5 gpm through a bypass + Furnished Complete — supplied r NOTE: The opw 71 SO is <br /> valve. The operator may then stop the <br /> designed for use on tight-fill <br /> with new upper and lower drop tubes gravity drop applications only, <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. nn applications. <br /> exceeds the 95 % level, the valve will t Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform, no resets f Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . Quick Drain Feature — <br /> liquid rises to about 98% of tank No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level , pressure is relieved. <br /> completely. No additional liquid can flow will Accept a Dipstick Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> a reset point. • OPW Test Lab results <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to: Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and 4 Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the w Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well - as take Into account overfill prevention . the tank until the hose " kick " that <br /> other considerations such as extreme <br /> tank tilt. In all cases, the upper tube 4P Keeps the Top of UST " Dry," accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 112 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level , <br /> off flow into the tank completely before bung fittings and the need for 4w. Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. .a Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number: H15524PA <br /> 1 Look for this label tar <br /> Listings and T' n�rtew authentic4PWEVR <br /> g U�C Approved prod:tcts. <br /> Certifications Fksa rctjBaud ,, ,• w , OPW 71 SO Is EVR Approved for E85 <br /> 104 tv : , t <br /> vP : rt <br /> �Y <br />