Laserfiche WebLink
AST SP001 ANNUAL I,N EE 7ION <br /> General Inspection Information: <br /> (36 months from inspection <br /> Inspection Date: 1/24/2019 Retain Until Date: 1/24/2022 date) <br /> Prior Inspection Date: 1/9/2018 Inspector Name: Philip Thiel <br /> tanks Inspected(ID#'s):Used Oil WASTE OIL <br /> Inspection Guidance: <br /> For equipment not included in this standard, follow the manufacturer recommended in$pectionitesting schedules and <br /> procedures. <br /> The periodic AST Inspection is intended for monitoring the external AST condition and its containment structure. This visual <br /> inspection does not require a Certified Inspector. It shall be performed by an owner's inspector who is familiar with the site <br /> and can identify changes and developing problems. <br /> r Remove promptly upon discovery standing water or liquid in the primary tank, secondary containment area, interstice, or <br /> spill container, Before discharge to the environment, inspect the liquid for regulated products or other contaminants and <br /> disposed of it properly. <br /> In order to comply with EPA SPCC (Spill Prevention, Control and Countermeasure) rules, a facility must regularly test liquid <br /> level sensing devices to ensure proper operation (40 CFR 112.8(c)(8)(v)). <br /> Non-conforming items importanj to tank or containment integrity require evaluation by an engineer experienced in AST <br /> design, a Certified Inspector, or a tank manufacturer who will determine the corrective action. Note the non-conformanoe and <br /> corresponding corrective action in the comment section. <br /> Retain the completed checklists for 36 months. <br /> ? Complete this checklist on an annual basis supplemental to the owner monthly-performed inspection checklists. <br /> `v Note: if a change has occurred to the tank system or containment that may affect the SPCC plan, the condition <br /> should be evaluated against the current plan requirement by a Professional Engineer knowledgeable in SPCC <br /> development and implementation, <br /> Item Task Status <br /> 1.0 Tank Containment <br /> 1.1 Containment structure Is structure free of: P Yes r No r NIA <br /> • Holes or cracks in containment wall or floor We Yes r No F NIA <br /> • Washout r Yes r No T NIA <br /> a Liner degradation I Yes No r NIA <br /> • Corrosion <br /> + Leakage P Yes r—No r N/A <br /> + Paint failure P Yes I—No r NIA <br /> . Tank settling P Yes r-No r NIA <br /> Comments: <br /> 2.0 Tank Foundation and Supports <br /> 2-1 Foundation No observed settlement or foundation washout? P Yes I—No <br /> 2.2 Concrete pad or ring wall No visible cracking or$palling? P Yes [—No r NIA <br /> 2.3 Supports No visible corrasion, paint failure, etc.? P Yes r No r NIA <br /> 2.4 Water drainage Water drainage away from tank? FYes I—No P NIA <br /> 2.5 Tank grounding Strap secured and in good condition? I—Yes r—No P NIA <br /> If intrinsically ground, please note in comments. <br /> Comments: <br /> W0; 6703206 SEPTEMBER 2016 <br />