My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2020 2:12:15 PM
Creation date
9/24/2020 1:14:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0505946
PE
2227
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AST SPOO1 ANNUAL INSPECTION <br /> Item Task Status <br /> 5.3.4 Solenoid valves Cycle power to valve and confirmed operation. (Electrical r Yes r No P NIA <br /> solenoids can be verified by listening to the plunger opening <br /> and closing. If no audible confirmation, the valve should be <br /> inspected for the presence and operation of the plunger-)(enter <br /> manufacturer and model number in Comments if available) <br /> 5.3.5 f=ire and shear valves a. Manually cycle the valve and confirmed components are r Yes No W NIA <br /> moving freely and that the valve handle or lever has clearance <br /> to allow valve to close completely.(enter manufacturer and <br /> model number in Comments if available) <br /> b. Valves must riot be wired in open position. r Yes r No F NIA <br /> c. Make sure fusible element is in place and correctly r Yes [—No F NIA <br /> positioned. <br /> d, Be sure test ports are sealed with plug after testing is r Yes r No W NIA <br /> complete and no temporary test fixture or component remains <br /> connected to valve. <br /> Cbmments: <br /> 5.4 Interstitial leak detection Check condition of equipment, including: <br /> equipment • Make: ,Model: <br /> • The window is clean and clear In sight leak gauges. r Yes r No W NIA <br /> • The wire connections of electronic gauges for tightness and r Yes r•No W NIA <br /> corrosion. <br /> • Activate the test Button, if applicable- r Yes "No NIA <br /> 5.5 Spill containment boxes a. Confirmed SB is free of corrosion, damage, or wear that r Yes r No P NIA <br /> on fill pipe has compromised the ability of the unit to perform spill <br /> containment functions(enter manufacturer and model number <br /> in Comments if available <br /> b. Confirmed connections to the AST are tight, and all bolts, 1�Yes r No W NIA <br /> nuts, washers are in good condition. <br /> c. Confirmed drain valves are operational. r-Yes r No R NIA <br /> 5.6 Strainer a. Confirmed that the strainer is clean and in good condition. rYes r No r NIA <br /> (enter manufacturer and model number in Comments if <br /> available <br /> b. Confirmed strainer basket, cap, bolts and gasket seal are r-Yes r No P NIA <br /> in good condition. <br /> 5.1 Filter a. Confirmed that the filter is in good condition and is within r Yes r No W NIA <br /> the manufacturer's expected service life. Replace, if <br /> necessary.Make:.Model: <br /> b. Confirmed no leaks or decreased fuel flow, r Yes r No W NIA <br /> 5.8 Flame arrestors Inspected for proper operation per manufacturer's instructions r Yes r No W NIA <br /> and no corrosion or blockage of air passages-(enter <br /> manufacturer and model number in Comments if available <br /> 5.9 Leak detector for Have been or were tested per manufacturer's instructions and r Yes r'No W NIA <br /> submersible pump systems authority having jurisdiction (AHJ)and verify leak detectors are <br /> suited and properly installed for above ground use. <br /> Make: ,llllodel: <br /> 5.10 Liquid level equipment a. Make: Krueger,Model:Te H <br /> b. Has equipment been tested to ensure proper operation? P Yes r•No r NIA <br /> c. Does equipment operate as required? rw Yes r No r NIA <br /> d. Roes the equipment perform per manufacturer's W Yes r No r NIA <br /> instructions? <br /> W0: 6703206 _.. _. SEPTEMBER 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.