Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply): CI1. <br /> E 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; [13.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE.RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C12. <br /> [�] 1.VERBAL WARNINGS, ❑2.PUBLIC ADDRESS OR,INTERCOM SYSTEM; [:13.TELEPHONE; <br /> ❑4.PAGERS; ❑5.ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C13. <br /> PRIMARY EMERGENCY COORDINATOR NAME. Mark Dufrene PHONE NO.: (209)333-6968 PHONE NO,: (209)639-3840 <br /> ALTERNATE EMERGENCY COORDINATOR NAME, Earl Larkin PHONE NO.: (209)333-6966 PHONE NO.: (209)483-3090 <br /> E Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: (209)948-3723 <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases fires and/or explosions, <br /> ❑1. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; D1, <br /> Q 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> 0 3, PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,spill pigs,spill pillows); <br /> Q 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5. LINED TRENCH DRAINS AND/OR SUMPS-, <br /> ❑6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> D 7 ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> D 8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑ 10.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> E 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> 0 12,NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 0 13,ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> ❑ 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> E 15,REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ❑ 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 0 17.USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT, <br /> ❑ I8.VACUUM SUCTION USING APPROPRIA'T'E VACUUM(e g,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITIIIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> 0 20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑ <br /> 21,OTHER(Specify): bz, <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): E1. <br /> ❑ 1. BELLS; <br /> az. <br /> ❑2.. HORNS/SIRENS; <br /> 0 3. VERBAL(i e.,Shouting); <br /> [14. OTHER(Specify): <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street corner): E3, <br /> Note:The Emergency Coordinator must account for all onsite employees and visitors after evacuation. <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: G4. <br /> ❑1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS, <br /> 0 2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTFIER(Specify), <br /> E5. <br /> Now Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): F1. <br /> Q 1. HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): F2. <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made for your facility,if necessary Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />