My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
89-1936
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
333
>
4200/4300 - Liquid Waste/Water Well Permits
>
89-1936
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2019 10:10:40 PM
Creation date
12/1/2017 11:50:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200/4300 - Liquid Waste/Water Well Permits
RECORD_ID
89-1936
STREET_NUMBER
333
Direction
E
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
APN
14912016
SITE_LOCATION
333 E WASHINGTON ST
RECEIVED_DATE
08/10/1989
P_LOCATION
SAN JOAQUIN CO
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\333\89-1936.PDF
QuestysFileName
89-1936
QuestysRecordID
1977179
QuestysRecordType
12
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> k: <br /> ;k <br /> I <br /> 83 WEST MARCH LANE <br /> I. SUITE 12 <br /> STOCKTON,CA 95207 <br /> PHONE:(209)476-1635 <br /> M"GERS DESIGNERS/CONSULTANTS July 18, 1989 <br /> Mr. Richard Callistro <br /> Capital Project Division <br /> San Joaquin County <br /> 222 E. Weber Ave. <br /> Courthouse, Room 670 <br /> Stockton, CA� 95202 <br /> Dear Mr. Callistro, <br /> At the request of the San Joaquin County Captial Project <br /> Division, ROY1F. WESTON, INC. (WESTON) will abandon monitor well <br /> MW-1 by removal or destruction. The resultant borehole will be <br /> filled with grout. The abandonment of MW-1 is necessary because <br /> as presently located the well interferes with the planned <br /> construction of the new Human Services Building for San Joaquin <br /> County at this site. Figure 1 and Figure 2 depict the site and <br /> monitor well location. <br /> k <br /> The actual abandonment will be accomplished in one of two ways. <br /> 1. Initially, an -.attempt will, be .made to -remove the PVC casing <br /> intact by .pulling it from .the ground. If the casing can <br /> indeed ,be pulled intact from the ground, .the hole will then <br /> -be .-grouted from the .bottom .up using a 5% .bentonite cement <br /> grout °.pumped Into .place through a trim line. <br /> I <br /> 2. If the PVC casing cannot be removed intact, the well will be i <br /> drilled 'out using a 10 inch hollow stem auger. This <br /> drilling . procedure will completely destroy the PVC well <br /> casing. A set of AW rods will be placed within the well <br /> casing and will act as a centralizer thus ensuring that the <br /> destruction is complete and that the drill hole does not <br /> deviate from the well. The borehole will be grouted as <br /> described above, using a 5% bentonite cement grout pumped <br /> into place through a trim line. Grout placement will be <br /> done under the supervision of a San Joaquin County <br /> Environmental Health Inspector. <br /> I <br /> Sincerely, <br /> ROY F. WESTON, INC. <br /> Jeffrey F. Herrick <br /> Associate Geologist <br /> JFH/akw <br /> k <br />
The URL can be used to link to this page
Your browser does not support the video tag.