DRAINAGE & UTILITY LEGEND DRAINAGE & UTILITY NOTES
<br /> 1. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES, STRUCTURES,
<br /> SYM DESCRIPTION SYM DESCRIPTION AND SERVICES BEFORE COMMENCING WORK. THE LOCATIONS OF UTILITIES, STRUCTURES,
<br /> AND SERVICES SHOWN IN THE CONTRACT DOCUMENTS SHALL BE DEEMED TO BE
<br /> DOMESTIC WATER POINT OF CONNECTION. CONTRACTOR TO VERIFY APPROXIMATIONS ONLY. ALL DISCREPANCIES BETWEEN WHAT IS SHOWN AND THE ACTUAL
<br /> f�G SANITARY SEWER CONNECTION TO DRINKING FOUNTAIN f�A LOCATION PRIOR TO INITIATING DRAINAGE IMPROVEMENTS. ANY FIELD CONDITIONS SHALL BE REPORTED TO THE OWNER REPRESENTATIVE. THE CONTRACTOR
<br /> DISCREPANCY TO BE PROVIDED TO OWNER IN WRITING. SHALL CONTACT UNDER GROUND SERVICE ALERT (USA) AT (800) 227-2600 PRIOR TO ANY
<br /> DEMOLITION OR EXCAVATION. UPON COMPLETION OF USA MARKING OPERATIONS,
<br /> f�H SANITARY SEWER CONNECTION TO BUILDING, REFER TO ARCHITECTURAL PLANS. OB DOMESTIC WATER CONNECTION TO DRINKING FOUNTAIN CONTRACTOR SHALL RECORD ALL UTILITY MARKINGS ON A SEPARATE SET OF DRAWINGS.
<br /> THIS SET SHALL BE KEPT ON-SITE FOR REFERENCE FOR DURATION OF CONTRACT.
<br /> O SANITARY SEWER CONNECTION TO POOL MECHANICAL BUILDING DRAIN, O DOMESTIC WATER CONNECTION TO BUILDING REFER TO ARCHITECTURAL PLANS. 2. ALL EXISTING DRAINAGE STRUCTURES, BOXES, UTILITY VAULTS ETC. TO REMAIN, SHALL BE
<br /> REFER TO AQUATIC PLANS. BROUGHT TO FINAL FINISH GRADE PRIOR TO FINAL SURFACE TREATMENT. VERIFY
<br /> UTILITY WATER CONNECTION TO POOL MECHANICAL BUILDING. PRIOR TO CONDITION OF EXISTING STRUCTURES WITH OWNER REPRESENTATIVE PRIOR TO FINAL
<br /> OWALL DRAIN TO STORM DRAIN CONNECTION OD CONSTRUCTION, CONTRACTOR VERIFY LOCATION AND SIZE OF EXISTING WATER FINISH GRADING.
<br /> LINE,TAP AND TEE NEW 3 LINE ONTO EXISTING WATER LINE AS SHOWN. 3. THE CONTRACTOR IS TO PROTECT DRAINAGE SYSTEM FROM DEBRIS, INCLUDING SOIL, ROCK
<br /> STORM DRAIN POINT OF CONNECTION. CONTRACTOR TO VERIFY LOCATION MATERIAL,AND TRASH FROM ENTERING THE PIPE DURING CONSTRUCTION. CONTRACTOR
<br /> f(D TRENCH DRAIN TO STORM DRAIN CONNECTION f(E AND INVERT ELEVATION PRIOR TO INITIATING DRAINAGE IMPROVEMENTS. SHALL AVOID PLACING CONSTRUCTION VEHICLES OVER INSTALLED DRAINAGE TRENCHES TO
<br /> ANY DISCREPANCY TO BE PROVIDED TO OWNER IN WRITING. PREVENT CRUSHING OF PIPE.
<br /> CONCRETE SWALE CATCH BASIN AND STORM DRAIN LINE SANITARY SEWER POINT OF CONNECTION. CONTRACTOR TO VERIFY LOCATION
<br /> O CONNECTION O AND INVERT ELEVATION PRIOR TO INITIATING DRAINAGE IMPROVEMENTS. ANY 4. COORDINATE ALL SLEEVING AND UTILITY LOCATIONS AS SHOWN ON THE PLANS AND
<br /> DISCREPANCY TO BE PROVIDED TO OWNER IN WRITING. DETAILS CONTAINED WITHIN THESE CONTRACT DOCUMENTS.
<br /> 5. THE CONTRACTOR IS TO ENSURE THAT ALL REMAINING ACTIVE AND NEW DRAINAGE AND VERDE DESIGN
<br /> UTILITY LINES ARE PROTECTED AND UNDAMAGED FROM TRENCHING AND FOOTING LANDSCAPE ARCHITECTURE
<br /> EXCAVATIONS FOR NEW FOOTINGS, PARTICULARLY FOR NEW FENCING AND WALLS. CIVIL ENGINEERING
<br /> 6. ALL ABANDONED STORM LINES SHALL REMAIN IN PLACE UNLESS IN CONFLICT WITH SPORT PLANNING& DESIGN
<br /> PROPOSED DRAINAGE, UTILITY, OR SUBGRADING OPERATIONS, IN WHICH CASE 1843 Iron Point Rd #140
<br /> ABANDONED PIPE IN CONFLICT SHALL BE REMOVED. REMAINING ABANDONED STORM PIPE Folsom,CA 95630
<br /> SHALL BE SEALED WITH APPROPRIATELY SIZED CONCRETE CAP (3 SACK MIX) b" ENVELOPE tel: 916.415.6554
<br /> OUTSIDE AND INSIDE DIAMETER OF PIPE. fax:408.985.7260
<br /> www.VerdeDesigninc.com
<br /> 7. PRIOR TO ALL DRAINAGE AND UTILITY WORK, CONTRACTOR SHALL BE RESPONSIBLE FOR
<br /> VERIFYING ALL POTENTIAL DRAINAGE CONNECTIONS AND EXISTING UTILITY BY POTHOLING.
<br /> i N� IN ADDITION,ALL DOWNSTREAM CONNECTIONS TO EXISTING STRUCTURES SHALL BE THE
<br /> e CB ' e P START OF THESE OPERATIONS, AND GRADES SHALL BE VERIFIED.
<br /> ♦� E I I IN � w,L� 11 „ pVG
<br /> �; RIM 28.56 .K p 2 . STAMP
<br /> Ck� ♦ Ss ° .' .d VIN .b}�� I p 23.2 5 8. WHEN WORK HAS TO OCCUR UNDER THE DRIPLINE OF EXISTING TREES NOT SCHEDULED FOR NSC
<br /> s 1
<br /> REMOVAL, THE CONTRACTOR SHALL USE ALL POSSIBLE CARE TO AVOID INJURY TO THE TREES \ P Ap
<br /> 0 ♦♦�' ;' a" I 2 I O p - 1° AND TREE ROOTS. GRADE IN LINES RADIAL TO THE EXISTING TREES RATHER THAN ��� ��5.BAu/N
<br /> °� ( JN 2,X15 W I p .+2 P sd C'
<br /> ♦♦,A ;'d a•� CUT 2 .13. N I / , TANGENTIAL. ALL PARTIAL CUTS OR TEARS THROUGH ROOTS TWO INCHES IN DIAMETER C-) / y
<br /> a • ' AND LARGER SHALL BE CUT CLEAN. TRENCHES ADJACENT TO TREES SHALL BE FILLED WITHIN No. 40
<br /> a , % �t" f.IyF D 24 HOURS AFTER EXCAVATION, BUT WHERE THIS IS NOT POSSIBLE,THE SIDE OF THE TRENCH w n
<br /> o ♦♦ d4 35% I %�p \ ` ADJACENT TO THE TREE,AND ANY EXPOSED ROOTS SHALL BE KEPT SHADED AND MOIST urP
<br /> WITH DAMPENED BURLAP OR CANVAS.
<br /> o ♦�.�'� ♦% ;' ' p
<br /> ♦ , ' u t� 011 I I o" _ S EXP
<br /> JULY I02021
<br /> 5° ; ' ;' 9. ALL DRAIN LINES LEAVING COMBOXES AND QUICK COUPLERS SHALL BE DAYLIGHTING TO \
<br /> o IRGN FEN ♦ �' //a° �- � �$ NEAREST SUBDRAIN TRENCH. OF CA�_
<br /> ♦♦ a" 5 2 DCS � IM 2�:�s�' I p ' 10. CONTRACTOR TO VERIFY LOCATION AND INVERT ELEVATION AT SANITARY SEWER AND
<br /> < / I V'0UTI X6.55 STORM DRAIN POINT OF CONNECTIONS PRIOR TO INITIATING DRAINAGE IMPROVEMENTS.
<br /> Q �'
<br /> p CONSULTANT
<br /> Z ♦♦� PER�¶LI�/ i / 4 L 6" SID 5A L° p , ANY DISCREPANCY TO BE PROVIDED TO OWNER IN WRITING.
<br /> Li E PSE LINCBGE+� a �'/ k,5° ELEG�� J B #21 uf I S= .0%
<br /> �/ R ` I p ' 11. PRIOR TO TRENCHING, CONTRACTOR TO VERIFY LOCATION OF GAS LINE BY POTHOLING.
<br /> o RP 28.3,6r a 0 I INV IN 27.54 RIM TO ' 1 LLE SAW CUT FOR GAS LINE TRENCH TO ALIGN WITH EDGE OF CONCRETE AND END AT THE
<br /> - SEE ENLARGEMENT B o MATCHLINE - REFER TO SHEET L6.2
<br /> INV IN 25•:37,% I 1�� , ' CONCRETE JOINT PAST THE POINT OF CONNECTION.
<br /> 12
<br /> eI INV IN 2a09.A/V / I �% I THIS SHEET% \
<br /> = 55 te) INVI � '. "W ,�' �� ° R'M INV IN28.35N , QoM _ _ DRAINAGE & UTILITY LEGEND
<br /> o IN _
<br /> NV FS 4 0 , ° J �„ 29
<br /> w 1��1 1� Sg � / ER " W D DOM DOM 5 LF 1 DOM 88 LF 8" SD @
<br /> �I P _ °�" I 2" DOM MIN S=0.34%
<br /> s
<br /> Q 2 , PyC ��; s Pb o_M S-0.5 0 ®� OO®
<br /> WD SYM DESCRIPTION DTL REF
<br /> M /�° 24 JB #26 SS g So
<br /> ,�♦ � < '6� /' ° VG RIM TOR �LF
<br /> DWOO
<br /> m � _0 RIM NE'�Y p INV IN 29.10 SCO G LIMIT OF WORK
<br /> - 522 INw EKY �„ PVG INV OUT 28.37 �' RIM 28.79 0 JB U 0 U 0 U 0 U�0[j�
<br /> o \ 2 q 62 IN v SLY „3p�G _ ° I INV THRU 3.31 O #20 a I
<br /> 24.'01'
<br /> IN ,b PERF (g) MIN 5-0.5/o RIM 2 80 `r0 A
<br /> g,�'� 6 I 4 JB 2 � INV IN 23.71 S @ 6 CO #2 D1.1
<br /> 5 6 + -- 28 JUNCTION BOX JB SIZE PER PLAN
<br /> 4 80 LF b PERF �� � ( )
<br /> � I 6 LF b PRF MIN S=0.5% I I y INV T RU 2 .80 1 0
<br /> MIN S-0.5/o
<br /> 0 0y�Z+ \ � P$
<br /> - @ PIPRIM 28.8_2 1 1 __ __I 24" CB #14
<br /> INV OUT 23.71 NW - RIM TOR
<br /> + INE P INV THRU 27.70 T A � PERF PERF P[RF PERF PERF • INV OUT 26.51 RIM 27.50 ® CATCH BASIN (CB) SIZE PER PLAN A
<br /> w 24" CB #16, GPS L LPN P " p 1 ---- MIN S=1.0% �9
<br /> \ RIM 27.60 c1TE P I 1 E PE PGP{e INV IN 23.39 I INV OUT 25.50 + Dl.l
<br /> INV THRU 29.25 I U N e I 19 8 D@ J
<br /> V �JT 25.50 = o O LP ( MIN = ocf) •
<br /> ♦♦ 0 6 LF X" PERF @ MIN S=0.5% 1 w I
<br /> w K ,,, CLEANOUT IN SYNTHETIC TURF (COT), SIZE PER PLAN Dl.l
<br /> M RPG ' INV THRU 29.28 �I I 36" OFR #3
<br /> Q P K fE' ,� I RIM 27.02 S� +
<br /> P6 �' IN LIN 6 LF X $ @ MIN S=0.5% �N-g--- -- - , FG 26.52 O G
<br /> cr) CN O I- / 0 SANITARY SEWER CLEANOUT (SSCO) SIZE PER PLAN
<br /> a +%', INV THRU 27.73 I o I O INV IN 24.52 S / + Dl.l
<br /> / INV IN 23.77 SW 1 20 LF b" SD @ Sp
<br /> 4`'LF b" SD @ 9 LF 6" PERF MIN S=0.5% "- n o 28
<br /> @ I O INV OUT 23.77 MIN S=0.5/° + B
<br /> o + MIN S= ° 29 �1 I I / O 0 CLEANOUT IN BIORETENTION AREA (COIT), SIZE PER PLAN D1.2
<br /> +� ¶ONI LF b" PERF @MIN 5=0.5% I
<br /> CAI
<br /> +
<br /> 'pIRMETPL RPGK 4 INV THRU 27.9 "' I 1 71 LF b" SD @ H
<br /> m r 1 MIN S=0.5% + X28'' ,p1 ® CLEANOUT IN HARDSCAPE (COH), SIZE PER PLAN
<br /> °II INV THRU 29.48
<br /> a ° tz 1 SO / P
<br /> z E 6 LF b" PERF @MIN S=O. /o 1 � 1 1 + � P��`� � OVERFLOW RISER (OFR) WITH GRATE/STANDPIPE AT BIORETENTION C
<br /> SID AREA, SIZE PER PLAN D1.2
<br /> b b SD @ MIN S= .5% -I 150 LF 4 SS 1 « O +
<br /> / RM u rI�1V THRU 9.51 I MIN S=1.0% 1 1 c� 5 / A
<br /> o I SPERoAGr m I I 001 00 1 + a COBBLE ENERGY DISSIPATOR (ED) D1 2 KEYMAP
<br /> INV THRU 27.96 ?� I O 132 LF 1 !" DOM I 1 57 LF 4" IT @
<br /> MIN S=0.0% 24" CB #15
<br /> N 39 LF 6" PERF @ MIN =0.5% T I G (( �I /
<br /> 0 o a STO U¶LI I RIM 27.15 + e DOWNSPOUT CONNECTION (DS) D1.1
<br /> 1p„ GE 6" COIT #5 /
<br /> w / N 39 LF 6" PERF @ MI =0.5% to I INV OUT 24.90
<br /> IL PN NI - I RIM 27.02 / N
<br /> FENGE � a IPL O I 1 I FG 26.52 + 4 ♦ / SANITARY SEWER MANHOLE SSMH , SIZE PER PLAN r -
<br /> INK INV TH U 28.16 , ® ( )
<br /> EG GNPI T ; INV OUT 23.77 / ♦ / D1.1 i o ` �•. .
<br /> EG 24° CB #17 INV TH U 29.71 0 ��F PERFORATED SUBDRAIN (PERF), SIZE PER PLAN E
<br /> o RIM 28.50 -
<br /> _ _ _ __ _ /
<br /> Ld
<br /> INV OUT 26.50 165 LF b" WD I - I ♦ / �• Q D1.1
<br /> �, b LF 6° PERF @MIN S=0.5% I [� 3 ILF 6° SD @ SO SOLID WALL STORM DRAIN (SD), SIZE PER PLAN
<br /> i
<br /> G
<br /> - -
<br /> � }II'T1�THRU 29.74 I I�1 S= .35% � 56 LF 4 IT � ♦ � D1.1 '
<br /> -- -- ----- - - -- ---
<br /> o � V w 31 LF 1 -f" DOIA I J / MIN S-0.0%@ + O ♦ \� INFILTRATION TRENCH (IT) AT BIORETENTION AREA, SIZE PER PLAN D
<br /> b LF b" SD @ MIN S=0.5/o \ - p I III l ♦ / D1.2 SHEET TITLE
<br /> Li
<br /> ,, 0 INV THRU 28.19 o \ REFERTOA UATIQ ♦ t ED #3 + ♦ / S SANITARY SEWER LINE (SS), SIZE PER PLAN C,D DRAINAGE AND
<br /> o I �" I PLANS FOR POOL `'
<br /> Z , 31 LF b" PERF @ MIN S=0.5% p B INV OUT 26.55 LP�E + ♦♦ UTILITY PLAN -
<br /> P `°`
<br /> Q ,, ° • • b b,' , , b° COIT #6 SPL + / Q SANITARY SEWER FORCE MAIN LINE (SSFM) SIZE PER PLAN C,D
<br /> ��.4F b PERF @MIN 5=0.5/o i Joe 8" ♦ / D1.2 POOL
<br /> o , IG d RIM 27.02 ,
<br /> j 6" CO #3 G _ ---- FG 26.52 + ♦ /
<br /> D gUILUIN RIM TOR I \\ I / II\ I // I INV OUT 23.77 ♦ / TRENCH DRAIN (TD) D1.1
<br /> INV OUT 29.89 „ F 6 W 49 LF D 1 LF D 1
<br /> b SSCO #21
<br /> ♦, 6° CO #4 36 LF b WD O I RIM 28.81 I / I \ I \ I + X36 ♦ / / O� W C D PROJECT NAME
<br /> o , ♦ RIM TOR O °O ° INV OUT 24.81 __ �V6 _ _ -29__ _ I ♦ \�� m* N I N K
<br /> w ♦, INV OUT 28.35 ° O IN CB #18 I ♦ ( t` I' I 48" JB #22 d QO DOMESTIC WATER LINE (DOM), SIZE PER PLAN
<br /> D1.2
<br /> o , ♦ K + G N RIM XX
<br /> C1 ° O O RIM 28.66 D S 1 I 36" \ ,,, I I INV IN 26.46 S I(SD) I C,D
<br /> Q PPG ° ° O O Q INV IN 27.84 ° I ' ` UTILITY WATER LINE (WL), SIZE PER PLAN FRANKLIN HIGH SCHOOL
<br /> *IN OU 26.66 ° 42 LF 6" SD @ I 1 0 ♦ NGE I IN 27.7 D1.2
<br /> ° ° ° o o O °°° MIN 5=0.35% : ♦ oE I 1 I I o wv IN 26.56 s 2 LF TD @ ATHLETIC IMPROVEMENTS
<br /> o O ° O ° ° o Sp , N D 1 INV IN 28.22 E MI S 0.5%
<br /> I �a I INV IN 26.39 VW WALL DRAIN (WD), SIZE PER PLAN
<br /> M
<br /> D1.1
<br /> INV OUT 26.391 NE
<br /> W , 3 , / 1 ,yo N N
<br /> � o LF 4 IT
<br /> ° MI6 4 / 29 E 4 1 I IN S=0.0°/Cod + ♦ / - �� QI \�` N o 0 0 Lu
<br /> �•,,,,••,, BIORETENTION AREA (BOTTOM OF BIORETENTION BASIN) B
<br /> O O° 0-1
<br /> Mlljlo 5/ o ® � IN U 6.5 \ /U //1 --- °. o o TD
<br /> RIM 28.70
<br /> O O D 6 COIT #7 8 I 1 1 LF� SD (�\I, I
<br /> O °O o ♦ 1 + ® IRT 1 ' s rJ o INV UT 28.37 PROJECT ADDRESS
<br /> o ° ° O D ♦ RIM 27.02 ♦ / / D 1 I \ I IAAI S� 5 0 IR DOMESTIC WATER GATE VALVE
<br /> Q O O TD D ♦ FG 26.52 / ♦ %5° 2 V , w
<br /> z ° °° 0 0 0 0 I 29. o o° INV OUT 23.77 ' / �lyp` ° I O 3 2 I 1/ v o 4600 E. FREMONT ST.
<br /> Z ° o O O I�1�11��.1 D ♦ y wNGON / 1 Z 1-
<br /> w o ° D ♦ , tPIN _ .�5' RIM 28. 8.70
<br /> I (e) EXISTING STOC KTO N, CA 95 215
<br /> o , O ° ° O O ° o° ♦ / q 9 INV OUT LL
<br /> o O O ° ° O ° ® / GJ 1 V OUT 26.70
<br /> Lu
<br /> 4LF3 -1 Fib SD
<br /> ° O � 4 �� @ CSCB CONCRETE SWALE CATCH BASIN
<br /> > D LF S / °'O �' �` IN 5=0.5%
<br /> INV OU 2 57 S 4% ♦,/ ' I SUBMITTAL DATE
<br /> / e N `,+ REF DF DRINKING FOUNTAIN
<br /> $ , ° o o /L0 INV THR 64 D AQUATIC PL S S DD/50% SUBMITTAL 03/06/202
<br /> Of
<br /> \ 9
<br /> w 3 @ 0 L @
<br /> o o ♦ 4 LF SD N 4 N S=1.0% MI % I INV INVERT DSA 100% SUBMITTAL 05/01/202
<br /> D M S= o SS FDUS
<br /> ° LL
<br /> acy
<br /> m �3G ,♦ SW 1 36° SSMH #3 ' SS SS RIM 8.58 I o
<br /> L INV O T .58 LF LINEAR FEET
<br /> ♦♦ / 0 INV IN 24.35 E ti _ - FS I
<br /> o ��, / UT 6.7 INV IN 20.33 S 28.76 I '
<br /> a z �, 5 �3G" / INV IN 22.72 SW S INV IN�OU o w MIN MINIMUM
<br /> 0- ,per, � NV OUT 2Q.33 N 10 LF b SS @
<br /> / 55 LF b" SD
<br /> �c) ��` b" SD @, ♦♦ +' MIN S=1.0% O o N
<br /> w .p, / ,r MIN S=0.3 /o o I RIM RIM ELEVATION NO. REVISIONS DATE
<br /> 0 0 MIN S=0.4% - +�`- FD
<br /> w \ ��
<br /> L0 0 12� �, O X28„ ♦ / °, y 21 LF b SS Q S 1 2 LF _ SRI 22.72 I Q
<br /> ~> y, , / PIN / MIN S=1.0% mi Lu
<br /> -
<br /> r ��� ♦♦ / �t 1 0 a I UT 20.72 S=0.5% SLOPE
<br /> o� , 6" SSCO #17 I Q
<br /> z0 l6
<br /> �, O RIM 28. 1 1 L
<br /> a w , �' 28 , / Ih V THRU 24.f5 _ /@ i TDCB TRENCH DRAIN CATCH BASIN Q
<br /> w ♦♦
<br /> o 6" SSCO #18 -
<br /> o� , N1 RIM 28.71 I SD TOR TOP OF ROCK ELEVATION
<br /> 3 50 ♦ INV THRU 20.48 FD DS #7
<br /> RIM 22.70 Q
<br /> R 1 I RIM 28.70
<br /> mo , ♦♦,/ 62 LF TD @ INV OUT 26.70
<br /> - -- Mild 53.5% I INV OUT 20.60
<br /> g w 4 LF 6" D
<br /> o > ti DS #8 0 0 -7:3 0 „
<br /> 0o MIN =0.5°0 RIM 28.70 0 15 LF SD @ TD 28 58 DRAWN BY CHECKED BY
<br /> co MINS 0.35/o
<br /> co
<br /> = SWCB 2 L INV OUT 26.65 INV OUT 28.25 Q CS
<br /> z ♦ RIM 9
<br /> ww
<br /> wo T 27.3 TD31 LF-TD DATE
<br /> OJr/0� /2020 SCALE
<br /> Q� -r RIM 28.58 MINS 0.5°p@/o
<br /> Q} INV OUT 28.09 I I
<br /> z
<br /> PROJ. NO.
<br /> vi a
<br /> o LINE
<br /> NORTH 1911000-1211
<br /> W
<br /> 0 0' 10' 20' 40' 60' SHEET NO.
<br /> ENLARGEMENT B SCALE: 1 "= I V-011 L6.3
<br /> OF
<br /> Q U
<br /> DRAWING NAME: Y:\Projects-FO\2019\1911000 - Franklin Restart\CAD\_A_L6.O_DRN-C3D.dwg DRAINAGE AND UTILITY PLAN - POOL
<br /> PLOT DATE: 05-01-20 PLOTTED BY: staticn3
<br />
|