Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of s) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault; 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> Site Address : SYNERGY — CENTRAL GAS MAIN — 3"0 E fAain St Stockton - 95205 <br /> KEY. <br /> A = AHLVULAR <br /> F = FILLS <br /> T = TURBINE <br /> P = PROS£ <br /> A A V = VAPOR <br /> X SUMP SENSOR <br /> IN 1aakDetector <br /> NI = Alant.ay <br /> B =Brine Sensor <br /> F F F I = Smart Sensor <br /> S = STP <br /> C = Floats & Chains <br /> E = E Stop <br /> I`t II 1111 . - 1 . . . . . . . 0 . . 4 . . 1 . <br /> a TL <br /> . ; _ ; . . _ . . T L T L 1111 . . . . . . . . . . . . . . . . . . . <br /> . . 1111 . . . . . . . . . . . . . . . . . . . . . . . <br /> - I . . . . _ . . . . . . . - - • - � _ � � � . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> s . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> £ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . STORE <br /> 1111 <br /> . . . <br /> 1111 . . . 11 . 0 . . 1 . . . . . <br /> 11 . 1 . . 1 . 11 . 1 . 11 . 111 E1111 1 _ <br /> j1..1 . . . . . . • - - - - . . . . <br /> *PIPING w I I _ _ . <br /> (ARROWS) - - - - . . . . _ . <br /> Drawing of piping . . . . . _ _ _ - <br /> s:Idt of sump and ATG <br /> UDC' s. No <br /> tmderground <br /> draining is accurate, AM, frena frra-krgrotarl flue are rror tisfble to rla cer ri6i re rev larfcfnn ca e a <br /> Nwe cannot p+-q/essfcmlopfraanoritI, amlae ;dejyfw- frfbrnnriom)Frrrpass_ DrI IIIIq <br /> speculate blue rnrro sede <br /> prints. <br /> V `-'- - ' —� Date map was drawrr.2.2U20- <br /> Instruotions <br /> If you already have a diagram that shows as required Information, you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoemg system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other seNzondary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2+21107 <br /> LEGEND <br />