Laserfiche WebLink
S-A N�] 0 A 0 U I N Environmental Health Department <br />CC) UIVT <br />Corrective Action Statement <br />RE: September 26, 2019, Underground Storage Tank inspection report <br />For each violation listed below, indicate if the violation has been corrected or will be corrected by a certain date. <br />Also, describe what was done to correct the violation in the space provided below each violation. Submit this <br />completed form with the Return to Compliance Certification within 30 days of inspection. If you have any questions, <br />please contact Paul Nso at (209) 468-3432 or pnso@sjgov.org. <br />Shell Oil Products US - Stockton Terminal, 3515 Navy Dr, CERS ID: 10157477, PR0231210 <br />Violation #320 - Failure to comply with the installation, inspection, or record keeping of the overfill <br />prevention. <br />❑ This violation was corrected ❑XThis violation will be corrected by (date): upon permit approval <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: Shell is submitting an application for a UST <br />closure permit, for'Closure in Place'. On 10/18/19 Theresa Geijer with Shell discussed these plans with <br />inspector vaui Nsc), ana raui conveyea tnat the pians to close tnis us i wouia meet the corrective action <br />plan requirement for this. On 10/22/19 Aaron Swol with Brinderson submitted a service request and <br />payment for Closing the UST out to SJCEHD. Previously Shell had submitted via TAIT (DO) a permit <br />application for the installation of a drop tube. However, closing the UST will be the corrective action to <br />meet this requirement. <br />Page 3 of 3 <br />Rev. 8/27/2019 <br />1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />