Laserfiche WebLink
PGE095 <br /> UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1 ) <br /> Type of;Action ❑ Installation Test El Repair Test 912 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10148345 09/18/2020 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> Pacific Gas and Electric Company <br /> Business Site Address City ZIP Code <br /> 4040 West Ln . Stockton 95204 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification.) Phone # <br /> Craig Feezell (714 ) 560-8222 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 588098 8374133 7/3/2021 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> OPW <br /> Sump Test System Operation - INCONO Level 4 <br /> III . SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used : ❑ Manufacturer Guidelines (Specify) : <br /> Hydrostatic <br /> 0 Industry Code or Engineering Standard (Specify) : PEI RP1200 <br /> ❑ Engineered Method (Specify) : <br /> Attach the testing procedures and all documentation required to determine the results. # of Attached Pages <br /> TANK ID : (By tank number, stored product, etc.) Unleaded Diesel Waste Oil <br /> Spill Container Manufacturer: OPW OPW OPW <br /> Method of Cathodic Protection : ❑ Non-Metallic ❑ Non-Metallic ❑ Non-Metallic ❑ Non-Metallic <br /> n Isolation ❑x Isolation ❑x Isolation ❑ Isolation <br /> ❑ Other (Specify in V.) ❑ Other (Specify in V.) ❑ Other (Specify in V.) ❑ Other (Specify in v) <br /> Inside Diameter of Spill Container: (Inches) 11 . 00" 11 . 00" 11 . 00" <br /> Depth of Spill Container: (Inches) 13 . 5" 12 . 5' 13 . 5" <br /> Does the spill container have a 5 gallon capacity? 2 Yes ❑ No 2 Yes ❑ No El Yes ❑ No ❑ Yes ❑ No <br /> Method to Keep Spill Container Empty: x❑ Drain Valve ❑x Drain Valve 0 Drain Valve ❑ Drain Valve <br /> ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump <br /> ❑ Other (Specify in v.) ❑ Other (specify in v) ❑ Other (Specify in v) ❑ Other (Specify in v) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results : ❑x Pass El 0Pass ❑ Fail Pass ❑ Fail ❑ Pass El Fail <br /> V. COMMENTS <br /> Any items marked Fail' above must be explained in this section. Any additional comments may also be provided here. <br /> All test water was left on site in a drum . <br /> Check If Action Item (s ) Are Present <br /> Vi . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations , Title 23, Division 3, <br /> Chapter 16 , Section 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician <br /> Signature <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = Califomia Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council <br />