My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EJ1: F»;''IE1G1r 1�:5c 8:3147" DOCr:TER EH IRO"-"' ITL EAi:,E �:rl <br />Lodi Chrome, Lodi, CA <br />Prepare doaure plan, conduct verificat 3n sampling, complete closure repo rt/certification. <br />Description Unit Oty. Cost 'total <br />Project Management <br />Regulatory correspo nden ce/m eating s Hr 2 $ 85.00 $ 170.00 <br />Workoian <br />Site Visit <br />i Hr <br />2 <br />$ <br />50,00 <br />$ <br />100.00 <br />Prepare Closure Plan - WP <br />Hr <br />3 <br />$ <br />45.00 <br />$ <br />135.00 <br />Prepare Closure Plan - CADD <br />Hr <br />2 <br />$ <br />55.00 <br />$ <br />110.00 <br />Pr are Closure Plan - TE <br />Hr <br />0.5 <br />$ <br />7500 <br />5 <br />37.50 <br />Prepare Closure Plan - PE/PG <br />Hr <br />14 <br />Hr <br />5.Q0 <br />$ <br />1,.190.00 <br />Subtotal $ 1,572.50 <br />Field/Samelina Casts <br />Field Sam lin - FT <br />Hr <br />8 $ 75.00 <br />$ <br />500.00 <br />Sampling Equipment if soil samples) <br />Day <br />1 $ 75.00 <br />$ <br />75.00 <br />Sampling Materials <br />LS <br />1 25.00 <br />$ <br />25.00 <br />Transportation <br />Day <br />1 $ 60 00 <br />$ <br />60.00 <br />0.5 <br />$ 75.00 <br />Subtotal <br />$ <br />780.00 <br />Ronnr4 and (',a if r-z+inn <br />Prepare Report • AG <br />Hr <br />12 <br />$ 85.00 <br />$ <br />1,020.00 <br />Prepare Report - WP <br />Hr <br />2 <br />$ 45.00 <br />S <br />90.00 <br />Prepare Report - CADD <br />Hr <br />2 <br />$ 55.00 <br />$ <br />110.00 <br />Prepare Report - TE <br />Hr <br />0.5 <br />$ 75.00 <br />$ <br />37,50 <br />Prepare Report - PE/RG <br />Hr <br />2 <br />$ 125,00 <br />$ <br />250.00 <br />Report Certiflcation - PE (if needed) <br />Hr <br />5 <br />$ 125.00 <br />$ <br />825.00 <br />$ <br />2,132,50 <br />!Total estimated cost for workplan, sampling, and report _ <br />$ <br />4,4416.00 <br />Additional site time at hourly rate of $75 per hour. <br />Additional project rnanagement time at hourly rate of $85 per hour. <br />Coring of concrete extra. <br />Does not include disposal of any soil or waste water. <br />Laboratorj testing provided at cost plus 16%. <br />Lab cost prices, as needed: <br />Individual Metals $ 17.25 <br />cyanide $ 80.50 <br />Cr V! $ 92.00 <br />Corn 17 Metals (TrLC), $ 143.75 <br />pH $ 11.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.