My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Corrective Measures Implementation contained in Attachment G. <br />o Operation and Maintenance Plan <br />o Construction Workplan <br />o Construction Completion Report <br />o Corrective Measures Completion Report <br />8.5. DTSC will review all required CMI documents and notify Respondent in <br />writing of DTSC's approval or disapproval. <br />8.6. As directed by DTSC, within 90 days of DTSC's approval of all required CMI <br />documents, Respondent shall establish a financial assurance mechanism for Corrective <br />Measures Implementation. The financial assurance mechanisms may include a <br />performance or surety bond, liability insurance, an escrow performance guarantee <br />account, a trust fund, financial test, or corporate guarantee as described in California <br />Code of Regulations, title 22, section 66265.143 or any other mechanism acceptable to <br />DTSC. The mechanism shall be established to allow DTSC access to the funds to <br />undertake Corrective Measures Implementation tasks if Respondent is unable or <br />unwilling to undertake the required actions. <br />CALIFORNIA ENVIRONMENTAL QUALITY ACT <br />9. DTSC must comply with the California Environmental Quality Act (CEQA) <br />insofar as activities required by this Consent Agreement are projects subject to CEQA. <br />Respondent shall provide all information necessary to facilitate any CEQA analysis. <br />DTSC will make an initial determination regarding the applicability of CEQA. If the <br />activities are not exempt from CEQA, DTSC will conduct an Initial Study. Based on the <br />results of the Initial Study, DTSC will determine if a Negative Declaration or an <br />Environmental Impact Report (EIR) should be prepared. DTSC will prepare and <br />process any such Negative Declaration. However, should DTSC determine that an EIR <br />is necessary, such an EIR would be prepared under a separate agreement between <br />DTSC and Respondent. <br />LODI CHROME Docket SRPD RPDD06/07SCC-4378 <br />CORRECTIVE ACTION CONSENT AGREEMENT <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.