My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Respondent shall notify DTSC Project Coordinator in writing of the name, title, and <br />qualifications of the professional engineer or registered geologist and of any contractors <br />or consultants and their personnel to be used in carrying out the terms of this Consent <br />Agreement. <br />ADDITIONAL WORK <br />13. DTSC may determine or Respondent may propose that certain tasks, <br />including investigatory work, engineering evaluation, or procedure/methodology <br />modifications are necessary in addition to, or in lieu of, the tasks and deliverables <br />included in any part of DTSC-approved workplans. DTSC shall request in writing that <br />Respondent perform the additional work and shall specify the basis and reasons for <br />DTSC's determination that the additional work is necessary. Within 14 days after the <br />receipt of such determination, Respondent may confer with DTSC to discuss the <br />additional work DTSC has requested. If required by DTSC, Respondent shall submit to <br />DTSC a workplan for the additional work. Such workplan shall be submitted to DTSC <br />within 30 days of receipt of DTSC's determination or according to an alternate schedule <br />established by DTSC. Upon approval of a workplan, Respondent shall implement it in <br />accordance with the provisions and schedule contained therein. The need for, and <br />disputes concerning, additional work are subject to the dispute resolution procedures <br />specified in this Consent Agreement. <br />QUALITY ASSURANCE <br />14.1. All sampling and analyses performed by Respondent under this Consent <br />Agreement shall follow applicable DTSC and USEPA guidance for sampling and <br />analysis. Workplans shall contain quality assurance/quality control and chain of custody <br />procedures for all sampling, monitoring, and analytical activities. Any deviations from <br />the approved workplans must be approved by DTSC prior to implementation, must be <br />documented, including reasons for the deviations, and must be reported in the <br />LODI CHROME Docket SRPD RPDD06/07SCC-4378 <br />CORRECTIVE ACTION CONSENT AGREEMENT <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.