My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />ATTACHMENT G <br />SCOPE OF WORK FOR CORRECTIVE MEASURES IMPLEMENTATION <br />PURPOSE <br />The purpose of the Corrective Measures Implementation (CMI) program is to design, <br />construct, operate, maintain and monitor the performance of the corrective measure or <br />measures selected by the Department. Corrective measures are intended to protect <br />human health and/or the environment from hazardous waste releases from the Facility. <br />The Owner/Operator or Respondent will furnish all personnel, materials and services <br />necessary to implement the corrective measures program. <br />SCOPE <br />The documents required for Corrective Measures Implementation are, unless the <br />Department of Toxic Substances Control (Department) specifies otherwise, a Corrective <br />Measures Implementation Workplan, Operation and Maintenance Plan, Draft Plans and <br />Specifications, Final Plans and Specifications, Construction Workplan, Construction <br />Completion Report and Corrective Measure Completion Report. The scope of work <br />(SOW) for each document is specified below. The SOWs are intended to be flexible <br />documents capable of addressing both simple and complex site situations. If the <br />Owner/Operator or Respondent can justify, to the satisfaction of the Department, that a <br />plan and/or report or portions thereof are not needed in the given site specific situation, <br />then the Department may waive that requirement. <br />The scope and substance of the CMI should be focused to fit the complexity of the site- <br />specific situation. Not all of the documents included in the CMI SOW may be needed <br />for every facility. <br />The Department may require the Owner/Operator or Respondent to conduct additional <br />studies beyond what is discussed in the SOWs in order to support the CMI program. <br />The Owner/Operator or Respondent will furnish all personnel, materials and services <br />necessary to conduct the additional tasks. <br />A. Corrective Measures Implementation Workplan <br />The Owner/Operator or Respondent shall prepare a CMI Workplan that clearly <br />describes the size, shape, form, and content of the proposed corrective measure, <br />the key components or elements that are needed, describes the designers vision <br />of the corrective measure in the form of conceptual drawings and schematics, <br />and includes procedures and schedules for implementing the corrective <br />measure(s). <br />
The URL can be used to link to this page
Your browser does not support the video tag.