My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
time. Satisfaction of the completion criteria will trigger preparation and submittal <br />of the Corrective Measure Completion Report. <br />11. O&M Contingency Procedures: <br />a. Procedures to address system breakdowns and operational problems <br />including a list of redundant and emergency back-up equipment and <br />procedures; <br />b. Should the corrective measure suffer complete failure, specify alternate <br />procedures to prevent release or threatened releases of hazardous <br />substances, pollutants or contaminants which may endanger public health <br />and/or the environment or exceed cleanup standards; <br />C. The O&M Plan must specify that, in the event of a major breakdown <br />and/or complete failure of the corrective measure (includes emergency <br />situations), the Owner/Operator or Respondent will orally notify the <br />Department within 24 hours of the event and will notify the Department in <br />writing within 72 hours of the event. The written notification must, at a <br />minimum, specify what happened, what response action is being taken <br />and/or is planned, and any potential impacts on human health and/or the <br />environment; and <br />d. Procedures to be implemented in the event that the corrective measure is <br />experiencing major operational problems, is not performing to design <br />specifications and/or will not achieve the cleanup goals in the expected <br />timeframe. For example, in certain circumstances both a primary and <br />secondary corrective measure may be selected for the Facility. If the <br />primary corrective measure were to fail, then the secondary would be <br />implemented. This section would thus specify that if the primary corrective <br />measure failed, then design plans would be developed for the secondary <br />measure. <br />12. Data Management and Documentation Requirements <br />Describe how analytical data and results will be evaluated, documented and <br />managed, including development of an analytical database. State the criteria <br />that will be used by the project team to review and determine the quality of data. <br />The O&M Plan shall specify that the Owner/Operator or Respondent collect and <br />maintain the following information: <br />a Progress Report Information <br />
The URL can be used to link to this page
Your browser does not support the video tag.