Laserfiche WebLink
time. Satisfaction of the completion criteria will trigger preparation and submittal <br />of the Corrective Measure Completion Report. <br />11. O&M Contingency Procedures: <br />a. Procedures to address system breakdowns and operational problems <br />including a list of redundant and emergency back-up equipment and <br />procedures; <br />b. Should the corrective measure suffer complete failure, specify alternate <br />procedures to prevent release or threatened releases of hazardous <br />substances, pollutants or contaminants which may endanger public health <br />and/or the environment or exceed cleanup standards; <br />C. The O&M Plan must specify that, in the event of a major breakdown <br />and/or complete failure of the corrective measure (includes emergency <br />situations), the Owner/Operator or Respondent will orally notify the <br />Department within 24 hours of the event and will notify the Department in <br />writing within 72 hours of the event. The written notification must, at a <br />minimum, specify what happened, what response action is being taken <br />and/or is planned, and any potential impacts on human health and/or the <br />environment; and <br />d. Procedures to be implemented in the event that the corrective measure is <br />experiencing major operational problems, is not performing to design <br />specifications and/or will not achieve the cleanup goals in the expected <br />timeframe. For example, in certain circumstances both a primary and <br />secondary corrective measure may be selected for the Facility. If the <br />primary corrective measure were to fail, then the secondary would be <br />implemented. This section would thus specify that if the primary corrective <br />measure failed, then design plans would be developed for the secondary <br />measure. <br />12. Data Management and Documentation Requirements <br />Describe how analytical data and results will be evaluated, documented and <br />managed, including development of an analytical database. State the criteria <br />that will be used by the project team to review and determine the quality of data. <br />The O&M Plan shall specify that the Owner/Operator or Respondent collect and <br />maintain the following information: <br />a Progress Report Information <br />