My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
316
>
2200 - Hazardous Waste Program
>
PR0513605
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2020 11:02:04 AM
Creation date
9/29/2020 9:39:05 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513605
PE
2220
FACILITY_ID
FA0007669
FACILITY_NAME
LODI CHROME
STREET_NUMBER
316
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04123011
CURRENT_STATUS
02
SITE_LOCATION
316 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
draft Construction Workplan shall be submitted to the Department <br />simultaneously with the draft Plans and Specifications and draft Operation and <br />Maintenance Plan. A final Construction Workplan shall be submitted to the <br />Department simultaneously with the final Plans and Specifications and final <br />Operation and Maintenance Plan. Upon receipt of written approval from the <br />Department, the Owner/Operator or Respondent shall commence the <br />construction process and implement the Construction Workplan in accordance <br />with the schedule and provisions contained therein. The Construction Workplan <br />must be approved by the Department prior to the start of corrective measure <br />construction. The Construction Workplan must, at a minimum, include the <br />following elements: <br />Introduction/Purpose <br />Describe the purpose of the document and provide a summary description of the <br />project. <br />2. Project Management <br />Describe the construction management approach including levels of authority <br />and responsibility (include organization chart), lines of communication and the <br />qualifications of key personnel who will direct the corrective measure <br />construction effort and provide construction quality assurance/quality control <br />(including contractor personnel); <br />3. Project Schedule <br />The project schedule must include timing for key elements of the bidding <br />process, timing for initiation and completion of all major corrective measure <br />construction tasks as specified in the Final Plans and Specifications, and specify <br />when the Construction Completion Report is to be submitted to the Department; <br />4. Construction Quality Assurance/Quality Control Program <br />The purpose of construction quality assurance is to ensure, with a reasonable <br />degree of certainty, that a completed corrective measure will meet or exceed all <br />design criteria, plans and specifications. The Construction Workplan must <br />include a complete construction quality assurance program to be implemented by <br />the Owner/Operator or Respondent. <br />5. Waste Management Procedures <br />
The URL can be used to link to this page
Your browser does not support the video tag.