Laserfiche WebLink
Consolidated Contingency Plan <br /> FACILITY IDENTIFICATION <br /> BUSINESS NAME FACILITY ID# DATE <br /> Jiffy Lube Store #2322 3/23/09 <br /> EMERGENCY CONTAINMENT & CLEAN-UP PROCEDURES <br /> Containment, Prevention&Clean-up <br /> Indicate your procedures for: nly. <br /> ® provide structural physical barrier (e.g. ® monitor for leaks, ruptures, pressure build-up, <br /> portable spill containment walls) ' etc <br /> 1. containing spills, releases, i— _.—_..___ ...__._._..._.__--.-.—.-�._.. <br /> fires or explosions, & ( ® provide absorbent physical barrier ® cover or block floor&/or storm drains <br /> 2, preventing and mitigating ® _built-in berm in work/storage area I [3 automatic fire suppression system <br /> associated harm to persons, I ® stop processes&/or operations j11 <br /> automatic/electronic equipment shut-off system <br /> property &the environment: -------- - ---- <br /> ® shut-off water, gas, electrical utilities as 1 ® call 911 for public emergency responder <br /> i appropriate assistance/medical aid <br /> _.—........_............. _--- <br /> E] provide~protective equipment for on-site I ® eliminate sources of ignition for flammable <br /> response team ! hazards(e.g.fuel,propane) <br /> .1..........................-- __.._........_.__..........._----------..._..................... <br /> ® notify & evacuate persons in all threatened i ® remove or isolate containers / area as <br /> areas appropriate <br /> ® account for evacuated persons immediately <br /> after evacuation call <br /> E] other(specify): <br /> check all that apply <br /> Indicateyour clean-up procedures: i............._..._..- - ....._......_._..._—.__—......_..._........__._..._..............._......_...........................—._... ----.__............_..........._..........................................__........................_._ <br /> ® hire licensed hazardous waste contractor <br /> ............................_..................._....._..._..._____ ----........_..- ---....._—....._..._......,--.._................................................._............_......--.............._....._._.........—._._.. <br /> ® use absorbent material for spills with subsequent proper labeling,storage and hazardous waste <br /> disposal as appropriate <br /> suction using shop vacuum with subsequent proper labeling,storage and hazardous waste disposal as <br /> appropriate <br /> wash/decontaminate equipment w/containment&disposal of effluent/rinsate as hazardous waste <br /> ® provide safe temporary storage of emergency-generated wastes <br /> 4 other(specify): <br /> 4 <br /> Evacuation Coordinator&Assembly Area <br /> Provide name / position of <br /> evacuation coordinator who will <br /> account for all on-site employees <br /> and / or site visitors after <br /> evacuation: Name General Manager <br /> Identify / describe emergency .-)eciiy.South of the Building . Parking Lot <br /> assembly area for evacuees <br /> i <br /> i <br /> Identify the location where your 1 Specify: Upper Ba /Lower Ba <br /> evacuation route/map is posted: pp Y y <br /> Other facility evacuation I Specify:Customer Waiting and Office Area: Through entrance/exit doors; <br /> procedures: Upper Bay 1)Through entrance/exit doors or 2) Large Bay Doors; j <br /> Lower Bay: Exit up stairs and through large bay doors. <br /> .............................................................................................................................. <br /> Page CP 3: Emergency containment & clean-up procedures, Earthquake vulnerability <br />