My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10998
>
2200 - Hazardous Waste Program
>
PR0514366
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:53:43 PM
Creation date
9/30/2020 4:03:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514366
PE
2228
FACILITY_ID
FA0010523
FACILITY_NAME
Papé Trucks, Inc.
STREET_NUMBER
10998
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-330-30
CURRENT_STATUS
01
SITE_LOCATION
10998 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
❑ Review the SPCC Plan on an annual basis. Update the Plan to reflect any administrative <br /> changes that are applicable,such as personnel changes or revisions to contact information, <br /> such as phone numbers. Administrative changes must be documented in the Plan Review <br /> Log of Section 1.4 of this SPCC Plan, but do not require certification by a Professional <br /> Engineer. <br /> ❑ Review the SPCC Plan at least once every five (5) years and amend it to include more <br /> effective prevention and control technology, if such technology will significantly reduce the <br /> likelihood of a spill event and has been proven effective in the field at the time of the review. <br /> Plan amendments,other than administrative changes discussed above, must be recertified <br /> by a Professional Engineer on the certification page in Section 1.2 of this SPCC Plan. <br /> ❑ Amend the SPCC Plan within six (6) months whenever there is a change in facility design, <br /> construction, operation, or maintenance that materially affects the facility's spill potential. <br /> The revised Plan must be recertified by a Professional Engineer on the certification page <br /> in Section 1.2 of this SPCC Plan. <br /> BERGESON•BOESE&ASSOCIATES INC. <br /> PAPE TRUCKS",0996 SO.HARLAN AD.;FRENCH CAMP,CA 95271 <br /> PAP 169PCC.07E•SPCC PLAN Page 2 <br /> JUNE 29,2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.