My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10998
>
2200 - Hazardous Waste Program
>
PR0514366
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/1/2020 3:53:43 PM
Creation date
9/30/2020 4:03:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514366
PE
2228
FACILITY_ID
FA0010523
FACILITY_NAME
Papé Trucks, Inc.
STREET_NUMBER
10998
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
Rd
City
French Camp
Zip
95231
APN
193-330-30
CURRENT_STATUS
01
SITE_LOCATION
10998 S Harlan Rd
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> Paqe <br /> INTRODUCTION 1 <br /> 1.0 PLAN ADMINISTRATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 1.1 Management Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 1.2 Professional Engineer Certification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 1.3 Location of SPCC Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 1.4 Plan Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 1.5 Facilities, Procedures, Methods, or Equipment Not Yet Fully Operational . . . . . 5 <br /> 1.6 Cross-Reference with SPCC Provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 2.0 GENERAL FACILITY INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 2.1 Facility Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 2.2 Evaluation of Discharge Potential . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 <br /> 3.0 DISCHARGE PREVENTION - GENERAL SPCC PROVISIONS . . . . . . . . . . . . . . . . . 15 <br /> 3.1 Compliance with Applicable Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 <br /> 3.2 Facility Layout Diagram . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 3.3 Spill Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16 <br /> 3.4 Potential Discharge Volumes and Direction of Flow . . . . . . . . . . . . . . . . . . . . . 16 <br /> 3.5 Containment and Diversionary Structures . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 <br /> 3.6 Practicability of Secondary Containment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 <br /> 3.7 Inspections, Tests, and Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 <br /> 3.8 Personnel, Training, and Discharge Prevention Procedures . . . . . . . . . . . . . . 20 <br /> 3.9 Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 <br /> 3.10 Tank Truck Loading/Unloading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 <br /> 3.11 Brittle Fracture Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 <br /> 3.12 Conformance with State and Local Applicable Requirements . . . . . . . . . . . . . 23 <br /> 4.0 DISCHARGE PREVENTION - SPCC PROVISIONS FOR ONSHORE FACILITIES . . 23 <br /> 4.1 Facility Drainage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 <br /> 4.2 Bulk Storage Containers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 <br /> 4.3 Transfer Operations, Pumping, and In-Plant Processes . . . . . . . . . . . . . . . I . . 27 <br /> 5.0 DISCHARGE RESPONSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 <br /> 5.1 Response to a Minor Discharge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 <br /> 5.2 Response to a Major Discharge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 <br /> 5.3 Waste Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 <br /> 5.4 Discharge Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 <br /> 5.5 Cleanup Contractors and Equipment Suppliers . . . . . . . . . . . . . . . . . . . . . . . . 31 <br /> FIGURES <br /> Figure 1. Site Location Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> Figure 2. Aerial Photograph/Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> Figure 3. Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> Figure 4. Detailed Site Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.