Laserfiche WebLink
GW-1 <br /> M -5*— <br /> MW-3 � <br /> s <br /> / <br /> EW-15 EW-16 OSB <br /> \ <br /> GW-2 MP-7 <br /> EW-17 MP_9 \ <br /> EW-13 MP-8 <br /> EW-14 \ <br /> PROPERTY LINE / MP-s EW-18 <br /> / CS-2 EW-34 \ <br /> EW-11 EW-12 EW-35 MW-4- \ <br /> MP-5 MP-10 MW-1 <br /> EW-9 EW-33 GW-7 <br /> EW-10 <br /> 0 150 300 600 / MP-4 EW-36 EW-19 / <br /> / EW-7 EW-8 EW-32 <br /> EW-21 / <br /> GW-3 EW-37 EW-23 EW-20 <br /> EW-5 EW-6 EW-31 MP-11 <br /> / EW-22cs-s <br /> / <br /> EW-3 EW-4 EW-38 EW-24 <br /> EW-2 EW-39 <br /> EW-30 MP-12 EW-25 / N <br /> EW-26 GW-6> <br /> / <br /> EW-29 Ew-27 LEGEND <br /> / ® EW-"n" LFG EXTRACTION WELL W/ VALVE <br /> EW-1 ¢ GW-"n" LFG PERIMETER MONITORING WELL <br /> ® MW-"n", SB-1 GROUNDWATER MONITORING WELL <br /> MP-2 <br /> MP-3 -28 �— MP-°n" LFG HEADER MONITORING POINT <br /> / cS-"n" CONDENSATE SUMP <br /> MW-2' r i rmP—i MP-13 / —/— PIPE SIZE CHANGE <br /> —� <br /> // r —oa— ISOLATION VALVE <br /> LFG COLLECTION PIPE (WITHIN WASTE LIMITS) <br /> cs-1 <br /> ® — — LFG COLLECTION PIPE (OUTSIDE WASTE LIMITS) <br /> #GW-4 GW-5 4 / —j i— ROAD CROSSING <br /> DENOTES <br /> THESE WELL LOCATIONS ARE APPROXIMATE, FOUND <br /> BY SCALING FROM "BLUELINE" DRAWING - PROJECT <br /> LFG FLAME STATM NO. 939-03 BY EMCON, DATED JUNE 1988. <br /> CORRAL HOLLOW SANITARY <br /> COUNTY OF SAN JOAQUIN 1" = 300' LANDFILL FIGURE 2 <br /> SURFACE EMISSIONS GRID <br />