Laserfiche WebLink
SAN JOAQUIN COMMUNITY �EVEL� ''MENT DEPARTMENT <br /> c_ oul�ITv SITE APP (R'tOVIAL/n� <br /> FILE NUMBEI�A 2® 4^-� L �MV <br /> ENVIRONMENTAL INFORMATION <br /> Adacn addnronar sneers as necesss <br /> Topography <br /> Describe the project site's[opogreph <br /> Tha site is undeveloped agricultural land with several rolling hills throughout the parcel.The 30-acre project subject area is <br /> relatively flat with one hill in the southwest corner rising gradually above the IowesT part of the subject area. <br /> Describe any existing drainage courses or erodatl areas on or near the prejact site: <br /> Northeast of the project area is a man-made drainage pond with a dam along the northwest end to contain storm water. <br /> This existing tlralnaga pond is not known to ba home to any anvironmentelly sensitive species,and can be used as a secondary source of <br /> water Tor the proposed activities as wall as siormwatar retention. R deemed necessary, an additional stormwater pond will be constructed <br /> within the 30-acre project area. <br /> Blolo91ca1 Resources <br /> Describe any wiltlltfe habitat or species on-site: <br /> Hlstoricaliy,no California Tiger Salamander(CTS) have bean fountl with on the property or within the 30-acre project area. <br /> Identify any waterways and/or riparian habitat that may be disturbed by the proposed project: (See Chapter 9-1 St0 of the <br /> Development Title for Riparian Habitat Regulations): <br /> An updated biological study may ba naceasary to assess the presence or absence of vernal pools located within the 30-acre projaci area. <br /> Identify any Native Oek trees,Heritage Oak trees or Historical trees that may be disturbed by the proposed project (Sae Chapter 9- <br /> 1505 of[he Development Title for Tree Regulations): <br /> An updated biological sTutly may ba necessary to access the presence of Native Oak trees, Heritage Oak trees. or Historical trees. <br /> Cultural Rasouroes <br /> Describe any items of historical o rchaeological interest onsite: <br /> No historical or archaeological Impacts era anticipated as part of this project. <br /> Pagc 4 of 6 <br /> u paaTea ltnslzols <br />