My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_1993-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FLOOD
>
23390
>
4400 - Solid Waste Program
>
PR0505566
>
CORRESPONDENCE_1993-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 12:11:25 PM
Creation date
10/5/2020 2:08:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
1993-2003
RECORD_ID
PR0505566
PE
4443 - SW COMPOST SITE - MONTHLY INSPECTION
FACILITY_ID
FA0005674
FACILITY_NAME
OM SCOTT & SONS/HYPONEX CORP
STREET_NUMBER
23390
Direction
E
STREET_NAME
FLOOD
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09310017
CURRENT_STATUS
Active, billable
SITE_LOCATION
23390 E FLOOD RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
23390 E FLOOD RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS ON DEVELOPTS <br /> SA-93-41 AMENDED t 0 . I W <br /> �- Fie-ed ad W <br /> T <br /> 33• any w olmed w' o 0 <br /> - <br /> 129-Yday. an <br /> Encroachment permit she44: -w_JU be required., fer _L . .:..- <br /> read right ef-way. <br /> (Development Title Section 9-1145.2) <br /> 43 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building peen" Improvement Plan AR2roval. (The <br /> fee currently is $904. 00 per 1, 000 gross square foot of <br /> building as "Manufacturing" or $234.92 per daily' trip-end <br /> generated in the Linden area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. ) <br /> (Resolution R-90-304, R-91-1025) <br /> 5�. If a building 12e m;t is necesgary T_the Water Supply Facilities <br /> Impact Mitigation Fee will be requiredVie=—LSeT .!__rWent. <br /> The f®e is due and payable at the time of building permit <br /> application. (The fee currently is $95. 00 per 1, 000 gross <br /> square foot of building as "Manufacturing". The fee shall be <br /> automatically increased on January 1 of each year .at the rate <br /> of 6.9 percent. An additional 3 . 5 percent shall be added to <br /> the fee upon payment for processing and administering the <br /> program. <br /> (Resolution R-91-327) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.