Laserfiche WebLink
`Jan-31-02 1O:45A f'-09 <br /> i <br /> db 40 <br /> YZI1 <br /> other sources used: <br /> a. '�ansoo��i9n/CirculatioZts --'+�' <br /> a. <br /> Will the project generate <br /> significant traffic volumes and/or <br /> mnke a eignilicant contribution to <br /> an tAisting circulation problem <br /> (consider existing IAS on nearby <br /> arterials and highway$, road design, <br /> access. parking, accident potential)? �.. <br /> ** b. WL11 the project cause special <br /> transportation considerations <br /> (consider waterborne, rail, air, <br /> pedestrian, and bicycle traffic, <br /> and public transportation <br /> ;systems and parking facilities)? <br /> C. will the project result in a <br /> a3ign4ficant increase in commuting <br /> to and from the local community? <br /> d. Will will the project be impacted <br /> by or interfere with an airport <br /> flight path? -- - <br /> C. Will the project restrict access <br /> to thn surrounding area? —X <br /> other sources used (note all traffic studies) : <br /> IM DISCUS;i,i�N <br /> lo. gltural :telf9UXg.9A: <br /> Will the proposal result in an <br /> alteration of a significant <br /> archeological or historical site, <br /> structure, or building? —� <br /> Other sources used: <br /> 11. 1iogsina: <br /> Will the proposal adversely affect <br /> the existing housing stock or create <br /> initial Stuay 6 (Rev;01/91) <br />