Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT <br /> XIII.VAPOR RECOVERY PIPING CONTAINMENT TESTING INFORMATION (SECONDARY LINE) <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer. <br /> A❑ I B❑ C❑ D ❑ <br /> A❑ B❑ C❑ D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines: <br /> ® Industry Code or Engineering Standard: PEI/RP1200/Pressure Test/5 psi for 1 HR <br /> ❑ Engineered Method: <br /> Attach the testing procedures and all documents required to determine the results. #of Attached Pages: <br /> Vapor Recovery Piping Containment Testing Training and Certifications Expiration Date <br /> ICC Service Technician- <br /> Interstitial Communication Verification Method Used: <br /> XIV. COMMENTS <br /> No Vapor Recovery Piping Tested. <br /> XV.TURBINE/PRODUCT PIPING SUMP TESTING INFORMATION (STP SUMP) <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Fiberglass A® B® C❑ D❑ <br /> A❑ B ❑ C❑ D ❑ <br /> Test Method Used: ❑ Manufacturer Guidelines: <br /> ❑ Industry Code or Engineering Standard: <br /> ® Engineered Method: INCON TS1000/Hydrostatic—15 MIN. <br /> Attach the testing procedures and all documentation required to determine the results #of Attached Pages: <br /> 2 <br /> Turbine/Product Piping Containment Testing Training and Certifications Expiration Date <br /> Incon TS1000-8709495 12/27/2020 <br /> XVI. COMMENTS <br />