Laserfiche WebLink
GENERAL NOTES <br />1 ALL VACUUM TUBING MUST BE VEEDER ROOT <br />APPROVED VACUUM TUBING. <br />O <br />2 AN EXTERNAL SIPHON CHECK VALVE (VEEDER - <br />ROOT #3188-241-5) MUST BE USEDWHENMAKING <br />A VACUUM SOURCE SENSORS AND THE SIPHON y <br />PORT CARTRIDGE FOR ALL TURBINES. d <br />O <br />*TEST <br />EST PORT TEST PORT 3 ALL PENETRATIONS THROUGH TANKS SUMPS, <br />STP UDC SUMPS AND VENT SUMPS TO BE MADE BY A <br />WITH 1-1/2"X1/4" WITH 1-1/2"X 1/4" 3 QUALIFIED CONTRACTOR. <br />BRASSBUSHING AND BRASS BUSHINGAND 4 ALL CONTAINMENT SUMPS TO BE INSTALLED PER <br />1/4" BRASS BARB31 3 -ZONE 1/4" BRASS BARB qTG 31 3 -ZONE THE MANUFACTURERS INSTALLATIONFITTING BY GCCUUM KIT FITTING BY GC VACUUM KIT INSTRUCTIONS. <br />5 ALL CONDUIT PENETRATIONS AND J -BOXES TO 4k <br />STP POWER CONDUISENSOR CONDUIT STP POWER CONDUIT SENSOR CONDUIT BE INSTALLED ABOVE FUEL LINE PENETRATIONS.K6 CONTRACTOR SHALL POSITION LIQUID ONLY ProtO 11-05-18 <br />PRODUCT PIPINGVACUUM PIPING PRODUCT PIPING VACUUM PIPING SUMP SENSORS AT SUMP LOW POINT ON SIDE <br />CLOSEST TO PRODUCT PIPING. <br />0 03TVP NP ® KEY NOTEST NOTE: EST PORT NOTE:LY SENSOR VACUUM KIT TO BE MOUNTED TO IQUID ONLY SENSOR VACUUM KIT TO BE MOUNTED TO I� <br />ATG RISER. AT RISER. 1❑ELECTRICAL CONDUIT(S) TO ENTER SUMP 2" MIN U) <br />REF SHEET G12.2 FOR ADDITIONAL REF SHEET G12.2 FOR ADDITIONAL ABOVE HIGHEST PRODUCT PENETRATION. <br />SUMP SECTION (FOR VACUUM ZONES INFORMATION SUMP SECTION (FOR VACUUM ZONES INFORMATION LU QO to <br />AND DETAILS. AND DETAILS. ❑2 LOCATE ELECTRICAL JUNCTION BOX IN UPWARD U ~ } p J <br />VACUUM ONLY VACUUM ONLY POSITION AT HIGHEST LOCATION IN SUMP RISER Z <br />MAINTAIN 8" TO 10" CLR FOR EASY ACCESS FROM ABOVE. p1 w d <br />FROM TOP OF MANHOLE COVER MAINTAIN 8" TO 10" CLR Q. � Z Q <br />1B TO TOP OF WT COVER 1 FROM TOP OF MANHOLE COVER �3 SUMP SENSOR TO REST AT LOWEST POINT OF Z - O U <br />4 WATERTIGHT COVER WITH 4 TO TOP OF WT COVER SUMP ENCLOSURE ON PRODUCT PIPING SIDE OF W Q Z Z CL O <br />OBSERVATION PORT WATERTIGHT COVER WITH SUMP. TANK CONTRACTOR TO SUPPLY ALL > U W 0 2 J <br />20 ALIGN PORT WITH ATG 2 OBSERVATION PORT BRACKETS AND CLAMPS FOR 2 -POINT MOUNTING W d• Z 0 <br />CONCRETE TANK SLAB CONCRETE TANK SLAB ALIGN PORT WITH ATG OF THE 2" FRP SLEEVE. J } Z <br />TRIM MH SKIRT TO MAINTAIN 2" TO 4" a LLI N U y Z <br />p a a < TRIM MH SKIRT TO MAINTAIN <br />p <br />BETWEEN SUMP SECURE FOAM PIPE 2" TO 4" BETWEEN SUMP �4 SET MANHOLE COVERS 1"ABOVE THE FINISH W 0_ J F Z m <br />1 ° ° INSULATION TO BOTTOM OF MH SKIRT. 1 GRADE AND SLOPE CONCRETE AWAY FROM I W LLJ N Q <br />SECURE FOAM PIPE INSULATION 00 <br />2 ADD INSULATION AS REQUIRED TO 2 TO BOTTOM OF MH SKIRT MAN WAV COVERS AT 2% GRADE. y <br />PREVENT CONCRETE FROM BEING POURED U <br />EXPLOSION PROOF ON SEALED MANHOLE EXPLOSION PROD 2 EXPLOSION PROOF J -BOX POSITION BALL VALVE FOR UNOBSTRUCTED USE Q <br />J -BOX TYP (POWER) J -BOX TYP (POWER) 2 EXPLOSION PROOF J -BOX (FOR SENSORS) OF SHUT-OFF HANDLE. _ ELEC SEAL -OFF ELEC SEAL -OF <br />(FOR SENSORS) E N <br />mo-_ E E&-- © STP POWER CONDUITS MUST BE RUN IN M <br />2" SCHED 40 GALV PIPE FITTINGS SEPARATE RACEWAY. ENTIRE WIRING RUN MUST <br />ELEC SEAL -OFF CONDUIT AND LBWS TO 6 FOR REGULAR AND PREMIUM BE IN RIGID PVC COATED GALVANIZED STEEL <br />CONDUIT AND LBY'S TO 6 - STP POWER CONNECTION BY GC CONDUIT. USE ONLY ROB ROY CONDUIT TYPES <br />STP POWER CONNECTION 7 CONDUIT FROM ANNULAR SPACE CONDUIT FROM ELEC ROOM 6 ELEC SEAL -OFF "PERMA-COAT", "PLASTI-BOND" OR "KORKAP", NO <br />CONDUIT FROM ELEC 6 MANHOLE FOR SENSORS FOR STP POWER PVC OR RNC CONDUIT ALLOWED. <br />ROOM FOR STP POWER 1 7 6 1 7 CONDUIT FROM ANNULAR SPACE <br />FUEL PLUMBING TREE MANHOLE FOR SENSORS 7 USE ONLY ROB ROY CONDUIT TYPES <br />1 REF 5-G4.1 XERXES DW SUMP SUPPLIE 1 7 "PERMA-COAT", "PLASTI-BOND" OR "KORKAP" <br />w/ TANKS I, ELECTRICAL CONDUITS AT FIBERGLASS TANK <br />p FUEL PIPING TREE SUMPS OR WHERE BRAVO F -17 -RR OR F -10 -RR <br />2" SCHED 40 BLACK IRON p 0 REF 5-G4.1 ENTRY FITTINGS ARE CALLED OUT. W <br />PIPE FITTINGS FOR 2" SCHED 40 GALVANIZED <br />— <br />PIPE <br />DIESEL BY GC SUMP SENSOR BRACKET PIPE FITTINGS FOR REGULAR W ■ <br />U -BOLTED TO ATG RISER (2 LOC) AND PREMIUM BY GC 0 Md <br />2" FRP X 33" LONG MIN 0 PIPE CLAMPS, SENSOR BRACKETS 2" FRP X 33" LONG MIN 03 SUMP SENSOR BRACKET W <br />(BEYOND) FOR SUMP SENSOR AND U -BOLTS BY GC (BEYOND) FOR SUMP SENSOR U -BOLTED TO ATG RISER (2 LOC) <br />HOUSING 1" CLR FROM TANK HOUSING 1"CLR FROM TANK PIPE CLAMPS, SENSOR BRACKETS <br />p AND U -BOLTS BY GC <br />3 3 Z <br />5 O z �E <br />U) <br />STRIKE PLATES TRIKE PLATES <br />BY TANK MFR BY TANK MFR <br />ui <br />�:)_� <br />�0 <br />Ix <br />SECTION SECTION <br />ROTATE VIEW AS REQUIRED FOR FIELD CONDITION ROTATE VIEW AS REQUIRED FOR FIELD CONDITION NOTE: �� a <br />NOTE: VACUUM KIT (NOT SHOWN) <br />VACUUM KIT (NOT SHOWN) TO TATRISER. <br />BE MOUNTED O G <br />ELECTRICAL PENETRATIONS INTO SUMP ARE SHOWN FOR TO BE MOUNTED TO ATG RISER. ELECTRICAL PENETRATIONS INTO SUMP ARE SHOWN FOR REF SHEET TED <br />REFERENCE ONLY- COORDINATE LOCATIONS WITH REF SHEET G12.2 REFERENCE ONLY LOCATIONS WITH 00 0 O <br />_ <br />03 SHEET G9 AND FIELD CONDITIONS FOR VACUUM ZONES AND DETAILS. TYP 0 FOR VACUUM ZONES AND DETAILS. 7 W N K J <br />SHEET G9 AND FIELD CONDITIONS CD F <br />p TYP pN O M <br />MINIMUM 4'-0" STRAIGHT RUN OF MINIMUM 4'-0" STRAIGHT RUN OF Q Z O <br />71 PIPING PRIOR TO FIRST CHANGE TYP 11 PIPING PRIOR TO FIRST CHANGE 1n <br />OF DIRECTION FITTINGTMP OF DIRECTION FITTING Q T <br />p m <br />03 2" FRP X 33" LONG MIN p 2" FRP X 33" LONG MIN m <br />(BEYOND)FOR SUMPSENSOR TYP p (BEYOND) FOR SUMP SENSOR dj 3 U <br />1 HOUSING 1"CLR FROM TANK1 HOUSING 1" CLR FROM TANK <br />TMP (�pp <br />U N L <br />0 0 0 0 0 !n D D U <br />3 3 <br />S FUEL PIPING TREE DESICCANT BAG W/HANGER S DESICCANT BAG W/ HANGER y o t; <br />FUEL PLUMBING TREE (2) PER SUMP (2) PER SUMP <br />(BELOW DISCHARGE) I as m (BELOW DISCHARGE) y`=o `o aEi `w Qa <br />REF 5-G4.1 SUMP SENSOR BRACKET REF 5-G4.1 UMP SENSOR BRACKET `m axi o a <br />U -BOLTED TO ATG RISER (2 LOC) U -BOLTED TO ATG RISER (2 LOC) r c y c <br />CONDUIT AND LBY'S TO 6 PIPE CLAMPS, SENSOR BRACKETS CONDUIT AND LBY'S TO 6 PIPE CLAMPS, SENSOR BRACKETS Un O1 o t v T c E <br />STP POWER CONNECTION AND U -BOLTS BY GC STP POWER CONNECTION AND U -BOLTS BY GC` <br />EXPLOSION PROOF 2 4 E EXPLOSION PROOF 2 <br />J-BOX(FOR STP POWER) J-BOX(FOR STP POWER) c3Q.�Ua cm <br />2 EP J -BOX TYP (SENSORS) 2 EXPLOSION PROOF J -BOX E a -- <br />7 1 1 7 1 1 (FOR SENSORS) <br />CONDUIT FROM ELEC 6 1 1 7 CONDUIT FROM ELEC ROOM 6 <br />ROOM FOR STP POWER FOR STP POWER_ 0 3 c <br />7 CONDUIT FROM ANNULAR SPACE 7 CONDUIT FROM ANNULAR SPACE <br />MANHOLE FOR SENSORS MANHOLE FOR SENSORS <br />Y{tOFE SI <br />O <br />XERXES 42"EIGHT SIDED DW <br />35558 n <br />SUMP- SUPPLIED w/ TANK (TVP) a a XERXES 42" EIGHT SIDED DW ¢ a <br />a SUMP- SUPPLIED w/ TANK (TYP) a *meq �FCFIANI�'PQ2� <br />REF SECTION RE TION �OF Cg7.1F0 <br />PLAN PLAN 08/19/20 <br />SHEET: <br />DIESEL_ STP SUMP DETAILS REGULAR AND PREMIUM STP SUMP DETAILS G4.0 <br />� 3/4"-1'-O" <br />FUELING - USA CA <br />