My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1829
>
2300 - Underground Storage Tank Program
>
PR0546066
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:27:27 PM
Creation date
10/12/2020 8:08:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0546066
PE
2351
FACILITY_ID
FA0026050
FACILITY_NAME
7 ELEVEN STORE #41187
STREET_NUMBER
1829
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
CURRENT_STATUS
03
SITE_LOCATION
1829 N WILSON WAY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 5 , MONITORING SYSTEM AND PROGRAMMING <br /> A separate Monitoring System Certification Form must be prepared for each control panel. <br /> Make of Monitoring System Model of Monitoring System Software Version Installed <br /> Control Panel Control Panel <br /> Veeder Root TL&350R 3$6.01 <br /> Attach the post-certification reports if the monitoring system is capable of generating Yes No NA <br /> either; QMonitoring System Set-up 23 Alarm History Report <br /> All monitoring equipment is operational per manufacturers specifications? <br /> Secondary containment systems are free of damage , debris , or liquid? <br /> Are the audible and visual alarms operational ? <br /> All sensors have been : 1 ) visually inspected for wiring kinks , breaks and residual 0 <br /> buildup on floats ; and 2 ) tested for functionality and confirmed operational ? <br /> Are all sensors installed to detect a release at the earliest opportunity in the ® El <br /> secondary containment? <br /> The monitoring system set-up was reviewed , and proper settings confirmed ? 0 Li Ij <br /> Was the monitoring control panel 's backup battery visually inspected , functionally 0 D Ll <br /> tested , and confirmed operational? <br /> Does the flow of fuel stop at the dispenser if a release is detected in the under- R) L) El <br /> dispenser containment? <br /> Does the turbine automatically shut down if the piping secondary containment g <br /> monitoring system fails to operate or is electrically disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment <br /> monitoring system detects a release? Which sensors initiate positive shut down ? L) Lj <br /> (Check all that apply ) Ll Sump J UDC <br /> If monitoring system alarms are relayed to a remote monitoring center, is all ® 9 <br /> communication equipment operational ? <br /> Describe all answers marked "No " or "Fail" and proposed remedy in Section 9. <br /> List all monitoring equipment either replaced or repaired in Section 9 <br /> Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.