My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1829
>
2300 - Underground Storage Tank Program
>
PR0546066
>
INSTALL_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2022 2:27:27 PM
Creation date
10/12/2020 8:08:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2020
RECORD_ID
PR0546066
PE
2351
FACILITY_ID
FA0026050
FACILITY_NAME
7 ELEVEN STORE #41187
STREET_NUMBER
1829
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
CURRENT_STATUS
03
SITE_LOCATION
1829 N WILSON WAY
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
197
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T IP <br /> LLC <br /> Exclusive Providers for MDleak® and PHDIeakT" Technologies <br /> 1400 East Paseo Pavon Tucson, AZ 85718 Phone 520 . 207 . 4878 FAQ': 520 . 990 . 8965 wmnv.LeakDetect . net <br /> Systems : <br /> 1 . LDT has no restrictions to the MDleak@ testing Methods . <br /> 2 . LDT has several chemical markers so site contamination by a single chemical marker is not a <br /> consideration or limitation . <br /> 3 . It is best for the contactor to find the majority of the leaks using whatever method they can . Small <br /> leaks are best left to LDT crews to pinpoint than for the contractor to spend hours looking for these <br /> small leaks . <br /> 4 . Fast identification and leak location substantially reduce repair cost . <br /> General : <br /> 1 . Extraction plugs should be installed and sealed properly <br /> 2 . A construction crew shall be onsite during the test period. This crew should be equipped to repair <br /> any portion of the system. <br /> 3 . The MDleakO method can test piping containing liquids . However, if a liquid is present additional <br /> time and cost will be incurred. <br /> Product Piping : <br /> 1 . The contractor shall have all shear valves plug or capped using steel not plastic fittings and <br /> connected to the piping . <br /> 2 . It is best to complete the turbine connections before the Pretest . Locating and repairing fittings <br /> within the tank sumps during the pretesting is more efficient and less confining than during the <br /> final ELD testing . <br /> Secondary Piping and Connection . <br /> 1 . MDleak° does not require special fittings to be installed by the contractor . <br /> 2 . The contractor should use standard California approved factory secondary termination fittings or <br /> boots . Termination fittings in California require test ports . Test ports shall be accessible to the LDT <br /> Technician . <br /> Vent Piping : <br /> 1 . Extraction plugs should be installed and sealed properly <br /> 2 . Vent risers should be caped and should include test ports on each vent riser <br /> VR Piping: <br /> 1 . Extraction plugs should be installed and sealed properly <br /> 2 . VR piping at the UDC should also be caped or plug using steel not plastic fittings . <br /> Author David Rabb 5of 7 <br /> Version 191127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.