My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013694
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
5024
>
2600 - Land Use Program
>
PA-2000152
>
SU0013694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:15:55 AM
Creation date
10/13/2020 10:19:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013694
PE
2666
FACILITY_NAME
PA-2000152
STREET_NUMBER
5024
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
17328001, -03, -24, -25
ENTERED_DATE
10/12/2020 12:00:00 AM
SITE_LOCATION
5024 E MAIN ST
RECEIVED_DATE
6/30/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Gas and <br /> Electric Company` <br /> 11. Cathodic Protection:PG&E pipelines are protected from corrosion with an"Impressed <br /> Current"cathodic protection system.Any proposed facilities,such as metal conduit,pipes, <br /> service lines,ground rods,anodes,wires,etc.that might affect the pipeline cathodic protection <br /> system must be reviewed and approved by PG&E Corrosion Engineering. <br /> 12. Pipeline Marker Signs:PG&E needs to maintain pipeline marker signs for gas <br /> transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br /> With prior written approval from PG&E Pipeline Services,an existing PG&E pipeline marker sign <br /> that is in direct conflict with proposed developments may be temporarily relocated to <br /> accommodate construction work.The pipeline marker must be moved back once construction is <br /> complete. <br /> 13. PG&E is also the provider of distribution facilities throughout many of the areas within <br /> the state of California.Therefore,any plans that impact PG&E's facilities must be reviewed and <br /> approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br /> its facilities. <br /> PG&E Gas and Electric Facilities Page 4 <br /> PA-2000152 (ZR) Informational Letters 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.