My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013694
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
5024
>
2600 - Land Use Program
>
PA-2000152
>
SU0013694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 9:15:55 AM
Creation date
10/13/2020 10:19:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013694
PE
2666
FACILITY_NAME
PA-2000152
STREET_NUMBER
5024
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95215-
APN
17328001, -03, -24, -25
ENTERED_DATE
10/12/2020 12:00:00 AM
SITE_LOCATION
5024 E MAIN ST
RECEIVED_DATE
6/30/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\lsauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stowers, Stephanie[CDD] <br /> From: Carolyn Lopez <rnclop2@aol.com> <br /> Sent: Tuesday,July S,2022 5:12 PM <br /> To: Stowers,Stephanie[CDD] <br /> Subject: Zone reclassification Main St and Walker Ln <br /> CAUTION:This email is originated from outside of the organization. Do not click links or open <br /> attachments unless you recognize the sender and know the content is safe. <br /> Dear Ms Stowers <br /> Application No PA-2000152 (ZR) <br /> I am responding to the notice I received regarding the Zone Reclassification application to change the <br /> 2 parcels totaling 25.92 acres on the southwest corner of East Main St and Walker Ln. I am speaking <br /> on behalf of myself and everyone that lives on Walker Lane. I live right next to this property on <br /> Walker Ln by the Mormon Slough bridge, 1515 and 1529 S Walker Ln and my concern as well as <br /> others that live on Walker Lane is the impact that this is going to have on the traffic and the safety of <br /> the traffic that will be utilizing Walker Ln. As you move forward with this process we would like you to <br /> include some sont of traffic study and possibly work with the County to make sure safety measures <br /> are implemented on Walker Ln as the traffic flow increases and will increase do to more structures <br /> being built. Walker Lane between Main Street and Highway 4 has become a main artery for people <br /> to access the 99 since they opened the new interchange back in 2016. The volume of our traffic has <br /> increased significantly and has become more and more dangerous. I have been working with the <br /> county traffic department to implement changes on our road to help make it safer but these measures <br /> are not enough as the traffic increases and will continue to do so as many more structures are built <br /> here. I have notified the County of my concerns also. Please feel free to reach out to me if <br /> necessary. 209 481-9081 <br /> Thank you <br /> Carolyn Lopez <br /> Sent from my iPad <br /> i <br /> PA-2000152 (ZR) Informational Letters 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.