Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARMNOTIFICATION WILL OCCUR BY (Check all that apply): mt. <br /> E} 1. VERBAL WARNINGS; Ej 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑ 3. TELEPHONE; <br /> ❑ 4. PAGERS; V�15. ALARM SYSTEM; Q 6, PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply): C12. <br /> 0 1. VERBAL WARNINGS; ❑ 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; E /3. TELEPI30NE; <br /> ❑ 4. PAGERS; ❑ 5. ALARM SYSTEM, ❑ 6. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: ` � �� ,,yy aa,, C13. <br /> PRIMARY EMERGENCY COORDINATOR NAME: &vk 'C y� �� HONE NO.: gG(A) Lj ":t" >--iHONE NO.: <br /> ALTERNATE EMERGENCY COORDINATORNAME: PHONE NO.: PHONE NO.: <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases, fires and/or explosions. <br /> DI. <br /> ❑ I . MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC.; <br /> ❑ 2. PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br /> [13. PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br /> ❑ 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑ S. LINED TRENCH DRAINS AND/OR SUMPS; <br /> ❑ 6. AT FIRE SUPPRESSION SYSTEM; <br /> [17, ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> [18. STOP PROCESSES AND/OR OPERATIONS; <br /> %9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; j <br /> 11. CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> 9212. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> [113, ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; ` <br /> ❑ 14. PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM, <br /> ❑ 15. REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ❑ 16. HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> �a 17. USE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; j <br /> [118. VACUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑ 19. DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; � <br /> ❑ 20. PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> E121. OTHER (Specify): D2 <br /> 3 <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNALS) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): EL. <br /> i <br /> ❑ 1. BELLS; E2. s <br /> ❑ 2. HORNS/SIRENS; <br /> 141-3. VERBAL (i.e., Shouting); E <br /> ❑ 4. OTHER (Specify): <br /> THE FOLLOWING LOCATION(S) WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S) (e.g, Parking lot, street comer): m. <br /> - VN O , V\' � yr4 is Lc v t ncb � <br /> Note: The Emergency Coordinator must account for &onsite employees and visitors after evacuation <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: <br /> ❑ 1. WRITTEN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> (R2.(] <br /> EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> 3. OTHER (Specify): Es. <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): El. <br /> 1 <br /> .� L HAVE BEEN DETERMINED NOT NECESSARY; ) <br /> E12. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): n <br /> Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03/07/17 Page 2 of 4 <br /> i <br />