Laserfiche WebLink
SWRCB,January 2002 Page of <br /> Secondary Containment Testing Report Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name:Fast&Easy#103 Date of Testing:07/18/2018 <br /> Facility Address:8660 Lower Sacramento Rd <br /> Facility Contact:Asim Phone:707-393-9856 <br /> Date Local Agency Was Notified of Testing:07/10/2018 <br /> Name of Local Agency Inspector(fpresent during testing): <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name:Confidence UST Services <br /> Technician Conducting Test:Frank Amest0 <br /> Credentials: 0 CSLB Licensed Contractor ❑SWRCB Licensed Tank Tester <br /> License Type:A, Haz, C-61 D-40 License Number:804904 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> ICC use service technicians 10/25/2019 <br /> INCON TS-STS 01/19/2020 <br /> 3. SUMMARY OF TEST RESULTS <br /> Component Pass Fail Not Repairs Component Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> Diesel annular 0 ❑ ❑ ❑ UDC 7/8 0 ❑ ❑ ❑ <br /> 91 annular 0 ❑ ❑ ❑ 91 vapor bucket 0 ❑ ❑ ❑ <br /> 87 annular 0 ❑ ❑ ❑ 87 vapor bucket k] ❑ ❑ ❑ <br /> Diesel secondary piping 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 91 secondary piping 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 87 secondary piping 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Diesel STP 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 91 STP r❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> 87 STP ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 1/2 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 3/4 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 5/6 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge,the,facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: 1 Date:07/18/2018 <br />