Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer D Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: []Pressure ❑Vacuum 0 Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used:Lake test Equipment Resolution:0.0625" <br /> Spill Box#91 Spill Box#87 Spill Box# Spill Box# <br /> Bucket Diameter: 12.00" 12.00" <br /> Bucket Depth: 14.00" 14.00" <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes <br /> starting test: <br /> Test Start Time: 11:15am 11:15am <br /> Initial Reading(RI): 13.00" 13.00" <br /> Test End Time: 12:15pm 12:15pm <br /> Final Reading(RF): 13.00" 13.00" <br /> Test Duration: 60 minutes 60 minutes <br /> Change in Reading(RF-RI): 0.00" 0.00" <br /> Pass/Fail Threshold or 0.0625" 0.0625" <br /> Criteria: <br /> Test Result: IL 0 Pass ❑Fail 0 Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />