CONCLUSIONS <br /> Based on the method and assumptions described, the result of the nitrate loading <br /> estimate indicates that proposed development on the Site has the potential to cause a <br /> buildup of nitrates in the aquifer up to 4.0 mg/L-N, well below the MCL of 10 mg/L-N. <br /> The depth of ground water based on recent aquifer levels is estimated to range from 85 <br /> to 95 feet below ground surface, depending on the season. The ground-water flow is to <br /> the northeast at a rate of approximately eight feet per mile. <br /> No water sample was collected as part of this investigation. The San Joaquin County <br /> Environmental Health Department's map of previous well testing in the area indicates <br /> that nitrate levels in nearby wells are below the regulatory threshold. <br /> Based on the result of the nitrate loading calculation, no nitrate mitigation is <br /> recommended for the new septic system. <br /> LOGE 20-32 Page 10 <br />