My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081147_MANURE MANAGMENET PLAN
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
D
>
DELTA
>
7300
>
2600 - Land Use Program
>
PA-1800316
>
SR0081147_MANURE MANAGMENET PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2021 4:01:34 PM
Creation date
10/30/2020 3:01:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
MANURE MANAGMENET PLAN
RECORD_ID
SR0081147
PE
2602
FACILITY_NAME
NAVU FARMS INC
STREET_NUMBER
7300
Direction
W
STREET_NAME
DELTA
City
TRACY
Zip
95304
APN
21302038
ENTERED_DATE
9/11/2019 12:00:00 AM
SITE_LOCATION
7300 W DELTA
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`2�) <br /> r���NLS§ <br /> characteristics of the sample depths obtained:3.3, SSS§ 5.3,5.4. Table 1 below summarizes the main soil physical and chemical <br /> TABLE 1 <br /> SOIL PROFILE CHARACTERISTICS AND <br /> ANALYTICAL TEST RESULTS <br /> SAMPLE DEPTH AND SOIL SOIL NITRATE- pH AND CATION EXCHANGE <br /> (SAMPLE NUMBER ON CLASSIFICATION NITROGEN CONTENT CAPACITY <br /> TEST RESULT FORM) <br /> 0"-6" Leachfield Soil Clay Loam 11 ppm NO,N 6.5 18.0 meq/100g <br /> (0-6LF) <br /> 30"-36" Leachfield Clay Loam 8 ppm NO,-N 7.4 16.8 meq/100g <br /> Soil <br /> (3036L) <br /> 0-6"Cropland Soil Clay Loam 1 ppm NO;N 6.7 17.6 meq/1008 <br /> (0-6CL) <br /> 30"-36"Cropland Soil Clay Loam 1 ppm NO;N 7.7 17.9 meq/1008 <br /> 3036C <br /> C. PERCOLATION TEST RESULTS <br /> SSS§ 6.2. To assess the permeability of the subsurface soils in the proposed leachfield area,the <br /> percolation test boring was completed in the location depicted on the Tentative Map found in <br /> Appendix C. <br /> SSS§6.3. After drilling,the sidewall of the perc test boring was scored with a pry-bar to open <br /> potentially smeared soil surfaces and the cuttings removed. Two inches of pea gravel was placed <br /> at the bottom and a three-inch perforated PVC pipe was inserted in the test boring. After these <br /> procedures,the boring was pre-saturated with 12 inches of water approximately 24 hrs prior to the <br /> start of testing. <br /> SSS§ 6.4,6.5. On June 3, 2019,percolation testing commenced at 0700 hrs. No standing water <br /> was observed after the 24-hr soak period. Consequently, EHD Perc Test Procedure#2 was <br /> conducted. Testing was done over a four-hour period to induce maximum soil saturation. <br /> A summary of the perc test results with corresponding application rates in gallons of effluent <br /> accepted per square foot of soil per day are illustrated below in Table 2: <br /> TABLE 2 <br /> PERCOLATION TEST RESULTS WITH CORRESPONDING ® <br /> APPLICATION RATES IN GALLONS /FT'/DAY <br /> 36 INCH DEEP PERC TEST BORING 20.8 min/inch / 0.643 gallons/ft/day <br /> PERCOLATION RATE/APPLICATION RATE <br /> Application Rates adapted from Waste Quality Control for Siting,Design,Operation and Matntenance of On-site Wastewater Treatment Systems,based on the Perc Rate. <br /> Page-3- <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.