Laserfiche WebLink
GROSS TEST FA 1 L 6 2:PREM I U°I <br /> ALARM Ii I SF4BLEE, T'.'F•:2.0/0.01 N F I BEPGLASS L l,)Ll I D :EN6:OR SETUP <br /> ' <br /> .iNi�f TEST AVERAGING: _.01N DIA LEN: 380 FEET OFF - - - - - - - - <br /> PEP TEST' AVERAU I NG: OFF ;i.0 I N DIA LEN: 0 FEET L 1 :P,EG ANNULAR <br /> TAN}. 'PEST IJOT I FY: OFF U.20 GPH TEST: DISABLED I lUAL POINT HYDROSTATIC' <br /> !'ATEGOF: : ANNULAR SPA,,E <br /> TN1: TST SIPHON BA.EA};:OFF 0.10 GPH TEST: DISABLEDSHUTDOWN PATE: .3.0 GPM <br /> LOW PRESSURE SHUTOFF:NO <br /> DELIVERY DELAY 15 1°111-4 LOW PRESSURE 0 PSI <br /> PU11P THRESHOLD 10.00'. L :PRE-DSL ANNULAR <br /> T :PREMIUM DUAL POINT HYDROSTATIC <br /> DISPENSE MODE: '-'ATEGORY : ANNULAR SPACE <br /> STANDARD <br /> SENSOR: NON-VENTED <br /> PRESSURE OFFSET: 0.0PSI L 9:AEG STP <br /> MECHANICAL BLENDER,: NO Dl.I SUMP 2-1: A1'EGORY : STP SUMP <br /> L10:REG FILL <br /> IL.I SUMP 2-1 <br /> LEA}: TEST METHOD 1_kTEi'JORY : PIPING SUMP <br /> TEST ON DATE : ALL TANK <br /> .JAN 9. 2017 L11 :PRE STP <br /> 'c;I'A1?,T TIME : DISABLED Dw SUMP 1 <br /> TEST RATE :0.20 GAL}HR l'ATEGORY : STP SUMP <br /> DURATION : 2 HOURS 9 3:DIESEL <br /> TS'T EARLY STOP:D I SABLED Ti P: .0,':3.0I P-4 F 1 BEP.GLt 5 L 12:PRE FILL <br /> �.0lN DIA LEN: �70 FEET DUJ SUP�1P 2-1 <br /> LEfil: TEST REPORT FORMAI' i ATEGORY : P 1 P I Nu SU'9P <br /> NORMAL 3.01N DIA LEN: 0 FEET <br /> STP <br /> U.% GPH TEST: DISABLED 1.13:DSL 1111i0-1 <br /> 17.10 GFH TEST: DISABLED CA EGORSUMP 2-1 <br /> SHUTDOWN RATE: 3.0 GPH CATEGORY STP SUI°IF' <br /> LOW PRESSURE SHUTOFF:NO <br /> LOW PRESSURE 0 PSI L14:DSL FILL <br /> T 3:DIESEL D61 SUMP 2-1 <br /> DISPENSE MODE: 4'ATEGORY : PIPING SUMP <br /> -''TANDARD <br /> PRF'NSUF.E LINE LEAK SETUP SENSOR: NON-VENTED L 15:VENT SUP1P <br /> - _ - _- - - - - - _ - - PRESSURE OFFSET: 0.0PS I DW SUMP 2-1 <br /> MECHANICAL BLENDER: NO t-'ATEGOPY : PIPING SUMP <br /> 0 1 :REGULAR <br /> L17:DISP 1-2 <br /> V.1-:2.0/3.01N FIBERGLASS DI.,I SUMP 2-1 <br /> ' .0IN DIA LEN: 370 FEET C=ATEGORY : DISPENSER PSN <br /> JOIN DIA LEN: 0 FEET <br /> fi.2i1 GPH TEST: DISABLED L18:DISP 3-4 <br /> f 1.10 GPH TEST: D I SABLED I1W SUMP 2-1 <br /> S'f11JTU04JN RATE: 3.0 GPH 'ATEWRY : DISPENSER PFil%l <br /> LOW PRESSURE SHUTOFF:NO <br /> LOW PRESSURE 0 PSI LINE LEAK LOCKOUT SETUP <br /> T I :RE13ULAR L}C 1;OUT SCHEDULE - - L 19:D I SP 5-6 <br /> DISPENSE h1ODE: DAILY DW SUMP 2-1 <br /> S'TANDARU CAZECOP : DISPENSER PAN <br /> '1r1J50R: NON-VENTEDSTART T I IdE: D!SABLED <br /> F RE.S ti-UR£ OFFSET: O.OPS I STOP TIME DISABLED <br /> 1"ll'CHAN I CAL BLENDER: ILIO L20:L1 I SP 7-8 <br /> DIJ SUMP 2-1 <br /> riTE�aOR`f : DISPENSER FAN <br />